Claim Missing Document
Check
Articles

Found 4 Documents
Search

A Critical Review of Value Engineering Development in Indonesian Construction Industry Sesmiwati, Sesmiwati; Utama, Wahyudi Putra; Roza, Fielda
-
Publisher : Kopertis Wilayah X

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (671.437 KB)

Abstract

Instead of Value Management (VM,) term of Value Engineering (VE) in Indonesia has been known over three decades. So far, there seems to be scanty attention, if any, from academia to summarize and review practical application of VE, particularly in construction industry. This paper, therefore, attempts to encapsulate and critically review the extant of VE application in Indonesian construction industry. The review presents the development of VE, identifies the opportunities and challenges and proposes new direction for future development. Both document searching technique and literature review were undertaken to find and view the existence of the methodology. It can be said that the practical application of VE in Indonesian construction projects is running in place. Four shortfall issues contributing to this patency were identified comprising lack of regulation, promotion, knowledge and expertise. Nevertheless, there are still big opportunities to echo and develop this methodology. 
Model Pengukuran Faktor Iklim Keselamatan (Safety Climate) Konstruksi: Studi Kasus Proyek Jalan di Sumatera Barat Nasril Sikumbang; Wahyudi P. Utama; Sesmiwati Sesmiwati; Dwifitra Y. Jumas
Jurnal Teknik Sipil Vol 28 No 3 (2021): Jurnal Teknik Sipil
Publisher : Institut Teknologi Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.5614/jts.2021.28.3.13

Abstract

Abstrak Makalah ini bertujuan untuk mempresentasikan pengembangan model penilaian iklim keselamatan (PIK) untuk proyek jalan melalui studi kasus pada proyek konstruksi dan pemeliharaan jalan di Sumatera Barat (SB), Indonesia. Data diperoleh dari survei kuesioner yang dibagikan kepada para pemangku kepentingan di 11 lokasi proyek jalan yang tersebar di lima wilayah di provinsi SB. Empat puluh lima (45) aspek iklim keselamatan dinilai oleh 209 responden yang terdiri dari administrator proyek (perwakilan pemerintah), pihak manajemen kontraktor dan konsultan serta pekerja terdepan proyek. Hasil analisis faktor menunjukkan bahwa 12 variabel yang diamati meliputi tiga konstruk faktor: komitmen dan sumber daya manajemen, prosedur dan kesadaran serta persepsi tentang kemalangan. Faktor-faktor tersebut kemudian divalidasi melalui Analisis Faktor Konfirmatori menggunakan aplikasi Onyx. Hasil PIK menunjukkan bahwa nilai reliabilitas konstruk dan goodness of fit sesuai dengan yang diharapkan. Dengan memahami dan mengetahui variabel yang diamati dari IK yang membentuk faktor IK membantu tim manajemen proyek untuk merancang strategi yang tepat untuk menciptakan lingkungan proyek yang selamat. Kata-kata kunci: Keselamatan konstruksi, Iklim keselamatan, model pengukuran, analisis faktor, pekerjaan jalan. Abstract This paper’s objective is to present the development of safety climate measure (SCM) model for road projects through a case study on the construction and maintanance road projects in West Sumatra (WS), Indonesia. The data obtained from questionnaire survey distributed to stakeholders at 11 road project locations spread over in five regions in WS province. A 45-item safety climate variables was assessed by 209 respondents comprised project administrators (government representatives), contractors’ and consultant’s management as well as the project’s frontline workers. Factor analysis results show that 12 observed variables encompassed three factor constructs: management commitment and resources, procedure and awareness and perception on misfortune. These factor were then validated through Confirmatory Factor Analysis using Onyx application. The results of SCM indicates that the score of reliability construct and goodness of fit are desireble. Understanding and knowing the observed variables of SC constructing SC factors help project management team to design an appropriate strategy in order to create a safety project environment. Keywords: Construction safety, safety climate, measurement model, factor analysis, road projects.  
IDENTIFIKASI RISIKO PADA PROYEK WASTE TO ENERGY MELALUI KERJASAMA PEMERINTAH DENGAN BADAN USAHA DI SUMATERA BARAT Sesmiwati Sesmiwati; Wahyudi Putra Utama; Martalius Peli
Rekayasa Sipil Vol. 16 No. 2 (2022): Rekayasa Sipil Vol.16. No.2
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2022.016.02.7

Abstract

Waste to energy (WTE) project is a solution to solve energy crisis and at the same time may resolve the waste problem. Public private partnership (PPP) scheme has been widely used to deliver WTE project. The success of PPP projects heavily relies on the advisability of management and risk sharing.  Risk management needed to conduct in order to understand specific risks, examine risk sharing between government and public sector and analyze risk mitigation for preventing and rectifying the impact. The effective decision on risk needed to improve decision-making process that may occur in the WTE projects. Therefore, this study identify risk probability in PPP WTE projects in West Sumatera. This probability relying on expert judgement were collected via an empirical questionnaire survey. The respondents were invited to rate a total of 21 risk factors that impact the success of PPP WTE projects as gleaned from previous research. The overall result ranked risk probability factors that land acquisition and administration approval risk, public opposition, construction cost overrun, operating cost overrun, and design/construction/commissioning performance risk are the top five risk factors affecting the sustainable development of PPP WTE Projects. A better understanding of the risk may improve project feasibility and attract private sector for investing in WTE projects.
FAKTOR DETERMINASI KOMUNIKASI EFEKTIF DI PROYEK KONSTRUKSI DARI PERSPEKTIF MULTIPLE STAKEHOLDERS Martalius Peli; Wahyudi P. Utama; Dwifira Y. Jumas; Zulherman Zulherman; Sesmiwati Sesmiwati; Vivi Ariani; Fielda Roza; Putranesia Thaha
Jurnal Studi Komunikasi dan Media Vol 26 No 2 (2022): JURNAL STUDI KOMUNIKASI DAN MEDIA
Publisher : BPSDMP Kominfo Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17933/jskm.2022.4896

Abstract

Persoalan komunikasi juga menjadi masalah serius proyek konstruksi di Indonesia. Kegagalan komunikasi efektif di proyek konstruksi menghasilkan distribusi informasi yang tidak tepat. Konsekuensinya, mutup ekerjaan tidak sesuai bestek, keterlambatan dari jadwal pelaksanaan, peningkatan biaya, dan bermuara padaber kurangnya kepuasan pemberi kerja. Tujuan penelitian ini adalah untuk mengidentifikasi dan menilai faktor determinasi terhadap komunikasi efektif di proyek konstruksi dari perspektif berbagai pemangkukepentingan. Penelitian ini menggunakan pendekatan kuantitatif dengan metode survei kuisioner untuk pengumpulan data. Dari hasil studi literatur, 31 unsur komunikasi efektif di proyek konstrsuksi berhasil diidentifikasi. Kuisioner didistribusikan kepada pemangku kepentingan di proyek konstruksi yang terdiri dari pemilik proyek, kontraktor, konsultan, akademisi dan pemasok konstruksi di Sumatera Barat. Seterusnya data yang terkumpul dianalisis dengan metode analisis komponen prinsip (principle component analysis). Hasilnya adalah terdapat tiga faktor penentu komunikasi efektif di proyek konstruksi di Sumatera Barat, yaitufaktor individual dan organisasi kerja (6 variabel), faktor kejelasan informasi dan tanggung jawab (6 variabel), dan faktor lingkungan kerja dan teknologi (4 variabel). Penelitian ini juga merekomendasikan pengukuran hubungan ketiga faktor dengan cara analisis faktor konfirmatori untuk penelitian dimasa akan datang.