PERBANDINGAN PENENTUAN WAKTU BAKU MENGGUNAKAN METODE TIME STUDY DAN CRITICAL PATH METHOD (CPM)

Miranda, Suci (Unknown)
Tripiawan, Wawan (Unknown)



Article Info

Publish Date
31 Jul 2019

Abstract

Increased technological developments encourage companies or industries to be able to increase their productivity. Increased productivity can do with improvements in each process carried out following the standard time set to complete an activity. This study aims to compare the usual time in the production process of MP YST Revo at a metal casting company using the time study method and the Critical Path Method (CPM) approach. Both methods process the same information for the duration of each recorded activity and allowance. The time study calculates the standard time of the production process by considering allowances, while the CPM uses completion time and final coefficient where the sum of the duration of each activity entering the critical path becomes completion time. Based on four observations, the average of the 30-minute allowance obtained, and the average observed time is 450.05 minutes, and the CPM gives a faster completion time of 341.4 minutes. The standard time to use CPM offers a difference of about 2 hours faster than a time study.

Copyrights © 2019






Journal Info

Abbrev

JSMI

Publisher

Subject

Engineering Industrial & Manufacturing Engineering Transportation

Description

This journal aims to publish the results of research in the field of Industrial Engineering is published twice a year, managed by the University of Serang Raya. The scope of Sciences covers Operations Research, Manufacturing System, Industrial Management, Ergonomics and Work System, Logistics and ...