cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota serang,
Banten
INDONESIA
Jurnal Sistem dan Manajemen Industri
ISSN : 25802887     EISSN : 25802895     DOI : -
Core Subject : Engineering,
This journal aims to publish the results of research in the field of Industrial Engineering is published twice a year, managed by the University of Serang Raya. The scope of Sciences covers Operations Research, Manufacturing System, Industrial Management, Ergonomics and Work System, Logistics and Supply Chain Management, and other scientific studies in accordance with scope field of Industrial Engineering research.
Arjuna Subject : -
Articles 141 Documents
Jurnal Sistem dan Manajemen Industri, Vol. 4 No. 1, July 2020 Admin Admin
Jurnal Sistem dan Manajemen Industri Vol. 4 No. 1 (2020)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

-
Jurnal Sistem dan Manajemen Industri, Vol. 4 No. 1, July 2020 Admin Admin
Jurnal Sistem dan Manajemen Industri Vol. 4 No. 1 (2020)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

-
Jurnal Sistem dan Manajemen Industri, Vol. 4 No. 2, December 2020 Admin Admin
Jurnal Sistem dan Manajemen Industri Vol. 4 No. 2 (2020)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

-
Jurnal Sistem dan Manajemen Industri, Vol. 4 No. 2, December 2020 Admin Admin
Jurnal Sistem dan Manajemen Industri Vol. 4 No. 2 (2020)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

-
Penentuan Kondisi Lingkungan Kerja Fisik yang Optimal Menggunakan Metode Permukaan Respon Arta Rusidarma Putra; Anggar Guritno
Jurnal Sistem dan Manajemen Industri Vol. 1 No. 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (96.74 KB) | DOI: 10.30656/jsmi.v1i1.156

Abstract

PENENTUAN KONDISI LINGKUNGAN KERJA FISIK YANG OPTIMAL MENGGUNAKAN METODE PERMUKAAN RESPON Rusidarma Putra, Arta; Guritno, Anggar
Jurnal Sistem dan Manajemen Industri Vol 1, No 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (96.74 KB) | DOI: 10.30656/jsmi.v1i1.156

Abstract

Many consequences caused by the condition of the work environment is not good. This can be caused by noise, lighting and temperature conditions. We need to determine the optimal value of these work environment factors in order to improve operator performance. The correlation between operator performance with work environment factor such as noise, lighting and temperature are found out by develope empirical model to describe relation between operator performance with work environment factor. The model is used to optimize operator performance. This research use surface response method. The experimental design used a central composite design. The research was conducted by experiments in the Laboratory of Analysis of Work Design and Ergonomics of Islamic University of Indonesia Yogyakarta. Variables taken are noise, lighting and temperature. Range for noise is 40 dB to 75 dB, lighting 200 lux to 700 lux, and temperatures between 20C to 35C. The experiment carried out was the resistor color matching for 5 minutes according to the combination of research variables that have been determined in the surface response method. Output is the number of truths that occur. Using this optimization model, optimal working environment conditions for noise of 60.5 dB, 354.5 lux illumination and temperature of 25.8.
Sistem Penentuan Supplier Kawat Las Dengan Metode Analitycal Hierarchy Process (AHP) dan Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) Gina Ramayanti; Hidayatul Ulum
Jurnal Sistem dan Manajemen Industri Vol. 1 No. 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (428.858 KB) | DOI: 10.30656/jsmi.v1i1.166

Abstract

Supplier selection is being a strategic activity, especially when the supplier is supplying materials that will be used in the long term. In the world of construction, one part of the supply chain which has a significant contribution to the improvement of the company's effectiveness is the efficiency in the procurement of materials (raw materials) from suppliers. In the research found the problem of 50 TON of welded wire failed. This study aims to determine the criteria based on the company needs in determining the supplier of welding wire and provide the ranking of suppliers as a material consideration in determining the supplier. The study used the Analytical Hierarchy Process (AHP) method for the selection of criteria and the Technique For Order Performance By Similiar To Ideal Solution for rating or evaluating alternative suppliers. Based on the results of AHP calculation we get the weight of each criteria as follows, for the quality of 0.0644, the price 0.056, the delivery time of 0.158, the quantity 0.053, the response to the claim of 0.093, and from the criteria are made reference to the calculation of vendor selection using TOPSIS. Results obtained supplier S2, i.e., PT.Esabindo Pratama ranked first as a priority supplier with a preference value of 0.322. Excellence which is owned by supplier S2 (PT.Esabindo Pratama) are the criteria of quality, price, quantity
SISTEM PENENTUAN SUPPLIER KAWAT LAS DENGAN METODE ANALITYCAL HIERARCHY PROCESS (AHP) DAN TECHNIQUE FOR ORDER PREFERENCE BY SIMILARITY TO IDEAL SOLUTION (TOPSIS) Ramayanti, Gina; Ulum, Hidayatul
Jurnal Sistem dan Manajemen Industri Vol 1, No 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (428.858 KB) | DOI: 10.30656/jsmi.v1i1.166

Abstract

Supplier selection is being a strategic activity, especially when the supplier is supplying materials that will be used in the long term. In the world of construction, one part of the supply chain which has a significant contribution to the improvement of the company's effectiveness is the efficiency in the procurement of materials (raw materials) from suppliers. In the research found the problem of 50 TON of welded wire failed. This study aims to determine the criteria based on the company needs in determining the supplier of welding wire and provide the ranking of suppliers as a material consideration in determining the supplier. The study used the Analytical Hierarchy Process (AHP) method for the selection of criteria and the Technique For Order Performance By Similiar To Ideal Solution for rating or evaluating alternative suppliers. Based on the results of AHP calculation we get the weight of each criteria as follows, for the quality of 0.0644, the price 0.056, the delivery time of 0.158, the quantity 0.053, the response to the claim of 0.093, and from the criteria are made reference to the calculation of vendor selection using TOPSIS. Results obtained supplier S2, i.e., PT.Esabindo Pratama ranked first as a priority supplier with a preference value of 0.322. Excellence which is owned by supplier S2 (PT.Esabindo Pratama) are the criteria of quality, price, quantity
Analisa Infrastruktur Desa Sukaci-Baros Dengan Metode Critical Path Method (CPM) Ahmad Nalhadi; Nana Suntana
Jurnal Sistem dan Manajemen Industri Vol. 1 No. 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (425.822 KB) | DOI: 10.30656/jsmi.v1i1.167

Abstract

CV. ABP a construction company worked in infrastructure building development for private and goverment. Now CV. ABP is handling infrastructure development project of the acropolitan area (Right Payment) Sukaci - Baros Village. This project has been late for 19 days from the dead line 126 days. Therefore the cost is getting higher. It happened because bad management is the problem source. Restoring the project time need to be focused on the cost and the due date based on the schedule. Scheduling evaluation using Critical Path Method (CPM) and Crashing to find optimal results using Critical Path Method (CPM) can be found the critical paths activity, there are ground digging , bopflang installation, stone installation, agregrate B agrgregation , aggregate A flatting, rigit bavement work, and refining, when the time suppression obtained optimal time results from 126 days to 92 days. It taken an alternative to the addition of working hours with duration 92 day after the crashing. Using two alternatives, additional working hours and the addition of workforce, obtaining the difference of extra hours of work cost Rp 80.128.125 and labourcost increase Rp 55.260 from the regular cost.
ANALISA INFRASTRUKTUR DESA SUKACI-BAROS DENGAN METODE CRITICAL PATH METHOD (CPM) Nalhadi, Ahmad; Suntana, Nana
Jurnal Sistem dan Manajemen Industri Vol 1, No 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (425.822 KB) | DOI: 10.30656/jsmi.v1i1.167

Abstract

CV. ABP a construction company worked in infrastructure building development for private and goverment. Now CV. ABP is handling infrastructure development project of the acropolitan area (Right Payment) Sukaci - Baros Village. This project has been late for 19 days from the dead line 126 days. Therefore the cost is getting higher. It happened because bad management is the problem source. Restoring the project time need to be focused on the cost and the due date based on the schedule. Scheduling evaluation using Critical Path Method (CPM) and Crashing to find optimal results using Critical Path Method (CPM) can be found the critical paths activity, there are ground digging , bopflang installation, stone installation, agregrate B agrgregation , aggregate A flatting, rigit bavement work, and refining, when the time suppression obtained optimal time results from 126 days to 92 days. It taken an alternative to the addition of working hours with duration 92 day after the crashing. Using two alternatives, additional working hours and the addition of workforce, obtaining the difference of extra hours of work cost Rp 80.128.125 and labourcost increase Rp 55.260 from the regular cost.

Page 1 of 15 | Total Record : 141