Jurnal Ilmiah Poli Rekayasa
Vol 18, No 2 (2023): April

MANAJEMEN MATERIAL SUBSTRUCTURE DENGAN METODE MATERIAL REQUIREMENT PLANNING

Jajang Atmaja (Politeknik Negeri Padang)
Riswandi Riswandi (Politeknik Negeri Padang)
Monika Natalia (Politeknik Negeri Padang)
Riry Maifrianti (Politeknik Negeri Padang)
Fitri Hidayati (Politeknik Negeri Padang)



Article Info

Publish Date
16 Jun 2023

Abstract

Project management planning on sub structure area, very important to ensure efficient and effective construction projects. This research was purposes managing the sub structure material on precast pile and sloof using the material requirement planning (MRP) method in flat residence in West Sumatera. The scope research were the lot for lot (LFL) bar bending schedule and contingency plan (to minimize wasted material). The results of the analysis of study, the implementation of the MRP method (LFL technique) consists of cost of material planning on shop drawing, which was Rp.1,488,562,000,00; cost of material requirement planning by the lot for lot (LFL) technique was Rp.1,477,837,249,00; realization cost by combining the LFL technique and contingency plan is Rp.1,478,143,808,00. Calculation of the quantity and cost of reinforcing steel using the MRP method (LFL technique) by the bar bending schedule better than using the contingency method. Using bar bending schedule was more efficient, because it makes the remaining reinforcing steel after cutting was calculated properly.

Copyrights © 2023






Journal Info

Abbrev

JPR

Publisher

Subject

Education

Description

Jurnal Ilmiah Poli Rekayasa adalah jurnal ilmiah yang diterbitkan 2 edisi dalam setahun, bulan April dan Oktober. Terbit sejak tahun 2005. Fokus Kajian jurnal ini adalah Fokus kajian artikel dalam JPR mencakup Mechanical Engineering, Civil Engineering, dan Electronica, Electricty dan ...