cover
Contact Name
Achmad Muchayan
Contact Email
achmad.muchayan@narotama.ac.id
Phone
+6285732060053
Journal Mail Official
ijeeit@narotama.ac.id
Editorial Address
NAROTAMA UNIVERSITY, Indonesia AR HAKIM 51 SURABAYA JAWA TIMUR www.narotama.ac.id
Location
Kota surabaya,
Jawa timur
INDONESIA
IJEEIT (International Journal of Electrical Engineering and Information Technology )
ISSN : 26152088     EISSN : 26152096     DOI : https://doi.org/10.29138/ijeeit.v3i2
is an open-access journal publishing original research from across all areas of the Electrical Engineering and Information Technology We offer our authors a highly respected home for their research. Partnering with our extensive network of expert peer reviewers, our editorial team provides rigorous, objective and constructive peer review, and will support you throughout the publication process. We led by the same ethical and editorial policy guidelines to ensure that all the research we publish is scientifically robust, original, and of the highest quality. We help your research reach more people and maximize its impact. As an open-access journal, we ensure that your work is immediately accessible and highly discoverable across a range of channels Focus and Scope IJEEIT publishes original research from all areas of the Electrical Engineering and Information Technology
Articles 5 Documents
Search results for , issue "Vol 2 No 2 (2019): September 2019" : 5 Documents clear
ANALYSIS OF PRODUCT QUALITY, SALES PROMOTION, BRAND IMAGES, AND AFTER-SALES SERVICE TOWARDS SAMSUNG GADGET PURCHASE DECISIONS Lina Safitriani; I Gedhe Arimbawa; Agus Baktiono; Elok Damayanti
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 2 No 2 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v2i2.1152

Abstract

This study aims to determine the effect of simultaneous and partial product quality, brand image, sales promotion and after-sales service on purchasing decisions of Samsung smartphones at the Discovery Mobile Store in Sidoarjo. This research used quantitative method. The population and sample based on the questionnaire distribution to consumers who visited the Discovery Ponsel Store Sidoarjo, and were taken as 135 respondents. Data collection techniques used interviews, observation and questionnaires. The data analysis used reliability test, validity test, classic assumption test and multiple linear analysis test. The simultaneous and partial results of product quality, brand image, sales promotion and after-sales service have a significant effect on the purchase decision of Samsung smartphones at the Discovery Ponsel Sidoarjo Store because of the significance of <0.005.
THE EFFECT OF COMPENSATION, MOTIVATION, AND WORK SATISFACTION ON OJEK ONLINE DRIVER PERFORMANCE IN SURABAYA Muhammad Kafid; Bayu Airlangga Putra
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 2 No 2 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v2i2.1153

Abstract

The purpose of this study is to analyze the Influence of Compensation, Motivation, and Job Satisfaction on the Performance of Surabaya Regional Ojek Drivers Online. With a sample of 100 respondents. This research is quantitative and data collection through questionnaires and observations. Data analysis used is validity test, reliability test, classic assumption test, and multiple linear analysis test. The results showed that the Influence of the Effect of Compensation, Motivation, and Job Satisfaction on the Performance of Surabaya Regional Ojek Drivers on positive and significant results. The f test results were known at 214,590> f table 17,354 simultaneously. Partially compensation amounted to .211 t table 3,985 Significant effect on motivation of .119 t table of 2.689 has a significant effect on employee performance and job satisfaction of .253 t table 4.194 has a significant effect on employee performance
SAFETY AND SECURITY STUDIES OF RAILWAY LINES WITH PUBLIC ROADS (CASE STUDY OF RAILROAD CROSSING IN THE KENJERAN ROAD OF SURABAYA CITY) Irwan Mahmudi; Sri Wiwoho Mudjanarko
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 2 No 2 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v2i2.1154

Abstract

Railways are a mode of transportation that is being liked by the public because of its efficiency. The train has its own road in the form of rails, it doesn’t mean the train doesn’t intersect other transportation. The train crossing is a conflict area for public road users with train. This includes train crossing at Kenjeran street. The kenjeran street itself is a national road that is quite strategic because it is one of the accesses to the Surabaya-Madura toll road. The research this time aims to find out the security aspects that must be improved at the train crossing kenjeran street. Including rider behaviour at the time of the train crossing. The method used for this research is direct observation of the field and also shares questionnaires to find out if a public road user understands regulations while on a train crossing. The research results of many signs or road markers are incomplete so that many road users do not know that in front of the train crossing. Other public road user behaviour is also a lot of offense.
ANALYSIS SCHEDULING PROJECT USING CPM METHOD (Case study : Project of the Surabaya Caspian Tower Apartment) Harjian Maprilana; Koespiadi Koespiadi
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 2 No 2 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v2i2.1155

Abstract

The success and failure of project implementation is often caused by poor planning and ineffective controls, so that project activities experience various obstacles such as the late completion of the project, the decline in the quality of work and the swelling of implementation costs. Project management is carried out to manage the project from the beginning of the project until the completion of the project properly. The case study in this study is PT. PP (Persero) Tbk. as the executing element of the construction work, it is in charge of organizing the construction of the Surabaya Caspian Tower Apartment in East Java. The CPM (Critical Path Method) method is used to find out how long a project has been completed and look for possible acceleration of project time. From the research using the CPM method, it can be seen that the normal duration of project completion is 453 days which can be optimized to 350 days. This can be done by giving special attention to activities included in the critical path and accelerating some activities by increasing the number of workers
PLANNING OPTIMIZATION PLANNING IRIGATION AREA OF SOLOK SUMATERA WEST REGENCY Acep Hidayat; Deri Ferdina
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 2 No 2 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v2i2.1156

Abstract

Solok Regency irrigation network planning which has an area of irrigation land of 3738 ha. The main canals are spread in several areas, namely 43 Irrigation Channels, 17 Dams, 7 Reservoirs and 2 lakes which are still functioning in Solok Regency. The poverty rate in Solok Regency is still quite high, reaching 27,487%. The data includes secondary data on 10-year rainfall data from KayuAro, Bayur Maritime Bay Methodology, Padang Panjang Geophysics and 10-year climatology from KayuAro Climatology Station. The calculation method used is the intensity of theissen rainfall method, Evapotranspiration of the modified Penman method, the reliable discharge of the DR.FJ Mock method, the cropping pattern, and the need for irrigation water. The most efficient and optimal planting pattern obtained is PADI-PADI-CORN with large irrigation water requirements in tertiary plots (NFR tertiary plots) ranging from 0 - 1,546 ltr / sec / ha with a maximum of 1,546 ltr / sec / ha in September II, whereas Irrigation water demand in the intake (DR intake) ranges from 0 to 2,378 ltr sec / ha with a maximum of 2,378 ltr / sec / ha in September II.The mainstay discharge available in the Pauh Tinggi Irrigation Network Planning is very abundant with the mainstay discharge (Q80) for irrigation, the maximum mainstay discharge (Q80) occurs in April I with 10.482 ltr / sec / ha and minimum in December II with 3,930 ltr / sec / ha. Based on the mainstay discharge results above it can be stated that the water balance / water balance between the mainstay discharge Q80 and the need for irrigation water experienced a large surplus

Page 1 of 1 | Total Record : 5