cover
Contact Name
Achmad Muchayan
Contact Email
achmad.muchayan@narotama.ac.id
Phone
+6285732060053
Journal Mail Official
ijeeit@narotama.ac.id
Editorial Address
NAROTAMA UNIVERSITY, Indonesia AR HAKIM 51 SURABAYA JAWA TIMUR www.narotama.ac.id
Location
Kota surabaya,
Jawa timur
INDONESIA
IJEEIT (International Journal of Electrical Engineering and Information Technology )
ISSN : 26152088     EISSN : 26152096     DOI : https://doi.org/10.29138/ijeeit.v3i2
is an open-access journal publishing original research from across all areas of the Electrical Engineering and Information Technology We offer our authors a highly respected home for their research. Partnering with our extensive network of expert peer reviewers, our editorial team provides rigorous, objective and constructive peer review, and will support you throughout the publication process. We led by the same ethical and editorial policy guidelines to ensure that all the research we publish is scientifically robust, original, and of the highest quality. We help your research reach more people and maximize its impact. As an open-access journal, we ensure that your work is immediately accessible and highly discoverable across a range of channels Focus and Scope IJEEIT publishes original research from all areas of the Electrical Engineering and Information Technology
Articles 6 Documents
Search results for , issue "Vol 3 No 1 (2020): March 2020" : 6 Documents clear
Human Resources Management Planning for Increasing Precast Productivity Based on PMBOK at Xyz Company Fertilia Novika Candra; Adji Raden Yudityo Afri
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 3 No 1 (2020): March 2020
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v3i1.1074

Abstract

In the era of globalization, it will demand every company to produce good quality products and also quickly in the completion of the product. Xyz Company is a company engaged in manufacturing. The company produce PCI Girder, Spunpile, U-ditch, and Barrier. But production activities there is a mismatch between the plans and the realization that has been made by the company, especially on spunpile products. The purpose of this study is to find out occurrence that affect human resource management planning and to find out how to manage these occurrence. For the method used, the authors used the method of interviewing, observing and distributing questionnaires. The analysis used is the validity test, reliability test, frequency index, severity index and importance index. The results of this study are that Xyz company has 4 variables that are most influential in human resource management planning.
Comparative Analysis of Conventional Mortars and Instant Mortars (RAPI) Against Stone and Plastering Wall Pairs Judging from Quality, Cost, and Time Girsang Hamonangan; Habibi T.B. Muhammad Nazmi
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 3 No 1 (2020): March 2020
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v3i1.1075

Abstract

The development of technology in construction has resulted in ready-made Mortar products is one product that is increasingly needed in the construction industry for several reasons such as material source, project location, quality accuracy, material efficiency, management and price factors. The larger the scale of the city and the more difficult to get quality materials at low prices and increasingly complex handling, it is enough to make an excuse in developing a more practical product with better quality assurance. The aim is to lead to ease in the process of work in the field while continuing to prioritize quality, but its utilization is still not maximized. This study tries to determine the neat instant mortar comparison with conventional mortar against the cost, quality, and time of the red brick and plastering wall pairs. The results showed that the compressive strength in 28 days the compressive strength of Mortar RM-115 with a compressive strength of 215.88 kg / cm2 which is larger and more measurable than Conventional Mortar with a value of 151.76 kg / cm2 whose implementation is sometimes incorrect. The time needed to complete the red brick wall pair work using Mortar RM-115 material is 14 days, while the time needed on the work of the red brick wall pair Conventional Mortar material is 15 days. So that the work of the red brick wall pair using the Mortar RM-115 material is more efficient 1 day and cleaner storage compared to using conventional Mortar material. The price of installing red brick walls with Mortar RM-115 materials in Bintaro Sector 7 housing is Rp. 36,858,425.99. While the price of installing red brick walls and plastering using conventional Mortar materials in Bintaro Sector 7 housing is Rp. 47,188,780.22. Work Installation of red brick walls and plaster using Mortar materials RM-115 is more expensive with a difference of Rp. 10,330,354.23.
Comparative Analysis of Conventional and Plates Floor plate Floor Area Bondek PIM 3 Basement Project and Cost Performance Against Time Hamonangan, Girsang; Khalid, Ihsan
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 3 No 1 (2020): March 2020
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v3i1.1076

Abstract

Work on the project floor Pondok Indah Mall 3 using plates bondek on basementnya area. Here I want to compare the effectiveness of the cost and time, why the owner and the contractor chose to use a plate bondek the basement area. This study aims to determine the differences of the two methods in terms of cost and time of work on the basement floor plates only at Pondok Indah Mall 3 project. Techniques of data collection using interviews and direct observations and combined with literature studies. Processing data using analytical methods of unit price (AHSP). The results of this research review time and cost. Observed work item is a work in basement slab. From this research work price obtained slab bondek system more expensive Rp 1,179,138,501 compared with the conventional method, in which the total price of the floor slab work bondek system is Rp 61,546,996,028, while the conventional method seberar Rp 60,367,857,526 As for the floor turnaround times bondek system requires 378 days, while the floor of conventional systems require 504 days.
Fostering Innovation of Thinking for Student-Facing Mathematics Difficulty Through Commercial Sport Video Games Herfa Maulina Dewi Soewardini; Hery Setiyawan; Dwi Juniati; Siti Khabibah; Abdul Talib bin Bon
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 3 No 1 (2020): March 2020
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v3i1.1081

Abstract

Every student likes a game that can keep him entertained by the many lessons at school. When they find it difficult to understand mathematical concepts in class, they tend not to show innovation in thinking when completing practice questions. Students mostly access video games via smartphones to forget learning difficulties. Furthermore, designed digital audio media related to sports and that obtained by students, namely commercial sports video games. From the results of the study, it turns out students who play commercial sports video games show innovative thinking skills, more comfortable to learn concepts, and enjoy mathematics. They can interpret according to what is in the scheme and written using a mathematical model.
PLANNING OF THE SANITARY LANDFILL SYSTEM IN SURAKARTA CITY David Anwar; Rosslan Edy Santosa
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 3 No 1 (2020): March 2020
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v3i1.1158

Abstract

Waste processing sites have a sueful life, as the activities and populations increase in the Surakarta City has led to increasing volume of the garbage that come to landfill every day. Putri Cempo’s Landfill operation system still uses the conventional system, called open dumping. This system causes accumulation of garbage increasingly mountainous and not polluted. Therefore, a system called sanitary landfill is planned to increase landfill capacity and extend the life of landfill.The purpose of this final project is to plan the development of landfill in Surakarta City with a sanitary landfill system. This development is made by making landfill cell in lieu of the open dumping system. The method of landfill cell waste using the trench method to further optimize landfill cell land.The development of TPA using a sanitary landfill was carried out in an area of 6.7 Ha. With the prediction of the amount of waste entering the landfill in 2026 around 15.041 tons/year. The age of using landfill is predicted to range from 5 years and the drainage size used is 50x50 and 100x50 made from river stone for around the landfill and made from precast cell for around the facilities building
Prediction Of Tiger Shrimp Supply Using Time Series Anlysis Method Case Study CV.Surya Perdana Benur Yoesril Ihza Mahendra; Natalia Damastuti
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 3 No 1 (2020): March 2020
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v3i1.1303

Abstract

Prediction of demand for tiger shrimp buyers using data from the company CV. Surya Perdana Benur. The process is carried out with the models in the Autoregressive Integrated Moving Average method. Tiger shrimp is a marine animal that is now widely cultivated by big company in Indonesia. Tiger shrimp has important economic value, so its existence must be maintained as part of Indonesian germplasm. The problem now faced by many tiger shrimp companies is the inadequate availability of goods for consumers. This time series data method is useful for predicting the availability of goods for consumers who want to buy goods at the company CV. Surya Perdana Benur. This time series data method is useful for predicting the availability of goods for consumers who want to buy goods at the company CV. Surya Perdana Benur. Autoregressive (AR), MovingAverage (MA), and Autoregressive Integrated Moving Average (ARIMA) model and will be evaluated through Mean Absolute Percent Error (MAPE). The initial process that will be carried out after the data is processed is model identification, estimation of model parameters, residual inspection, using forecasting models if the model has been fulfilled will be evaluated using MAPE until the results come out 14875.593875 to be able to predict the next buyer demand.

Page 1 of 1 | Total Record : 6