cover
Contact Name
Pradityo Utomo
Contact Email
pradityo@unmer-madiun.ac.id
Phone
+62351-456150
Journal Mail Official
pilarteknologi@unmer-madiun.ac.id
Editorial Address
Jl. Serayu No.79, Kota Madiun, Jawa Timur, Indonesia - 63133
Location
Kota madiun,
Jawa timur
INDONESIA
Pilar Teknologi : Jurnal Penelitian Ilmu-ilmu Teknik
ISSN : 25027042     EISSN : 25803557     DOI : https://doi.org/10.33319/piltek.v4i1
Core Subject :
Jurnal Pilar Teknologi memuat naskah hasil penelitian, kanjian konseptual, analisis kritis, resensi buku di bidang ilmu teknik Terbit per satu semester (dua nomor dalam setahun) Pada bulan Maret dan September
Articles 116 Documents
Optimasi Pengelolaan Waduk Pondok Ngawi Jawa Timur Susilo, Hendro
JURNAL PILAR TEKNOLOGI : Jurnal Ilmiah Ilmu Ilmu Teknik Vol 4, No 2 (2019): JURNAL PILAR TEKNOLOGI
Publisher : LPPM Universitas Merdeka Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33319/piltek.v4i2.40

Abstract

Pondok Reservoir is one of the smaller reservoirs built in Bengawan Solo River Basin, located in Kali Dero, Gandong Village, Bringin District, Ngawi District, with a puddle of 3.6 km2 and 32.9 km2 of drainage area. The total reservoir volume is 25,233 MCM and the effective dams volume is 22,333 MCM. The reservoirs are used to irrigate 3.596 Ha of irrigated rice fields which are distributed through four weirs, namely Dero weir, Sambiroto dam, Plesungan dam, and Padas dam. The results showed that selected crops were rice and maize, while to obtain maximum annual agricultural benefit benefit can be done with the initial period of planting for the first planting season is the third week of November, which has annual net benefit value of agriculture of Rp. 10,797,000,000. Through continuous water supply, the optimal planting area for each planting season is the first planting season in the third week of November with rice plant of 2877 ha and 719 ha of maize; the second growing season in the third week of March with rice plants 1216 ha and 1216 ha of maize; third planting season in the third week of July with 402 ha of corn. Percentage of planted area from available land per planting season is: first planting season is 100%, second planting season is 67,63% and planting season is 11,18%, so planting intensity is 178,8%.
Sistem Pendukung Keputusan Pemilihan Atlet Panahan Menggunakan Metode Analitycal Hierarchy Process Berbasis Web Bimantara, Eka Bayu; Budiman, Arief; Utomo, Pradityo
JURNAL PILAR TEKNOLOGI : Jurnal Ilmiah Ilmu Ilmu Teknik Vol 3, No 2 (2018): JURNAL PILAR TEKNOLOGI
Publisher : LPPM Universitas Merdeka Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33319/piltek.v3i2.12

Abstract

Decision Support System is a system was used to help getting making decisions on a problem, such as  selecting students in  the archery sports that will be face to a championship event such as SEA GAMES (South East Games). In Decision Support System there are many methods that can be used, one of them is Analitycal Hierarchy Process method. Analitycal Hierarchy Process method is one of the more efficient decision-making methods because the data is very detailed, all the criteria and alternatives will be compared one by one. The calculation used to solve a problem uses multiplication to relate the preference value, where the value for each criteria and alternative must be searched for eigen / priority vector first, after it is proved consistency using RI table (ratio index), if the result of verification is less than 10% (0.1) then it is consistent and the calculation can be continued, but if the verification result is more than 10% (0.1) then the calculation is considered inconsistent and needs to be repeated from the beginning. This support system uses a web base, where the data entered will be saved into the MySQL database. The test results of the Student Selection Selection Decision Support System Using Analitycal Hierarchy Process Method Based Web get results as expected on the Black Box. So it can be concluded an accurate percentage of system success of 100%.Keywords : Decision Support System, Black Box, Analitycal Hierarchy Process, The Selection Of  Athlete.
Analisis Stabilitas Sheet Pile Kali Sono Kota Madiun Aji, Seno; Rohman, Rosyid Kholilur; Cahyono, Setiyo Daru
JURNAL PILAR TEKNOLOGI : Jurnal Ilmiah Ilmu Ilmu Teknik Vol 5, No 2 (2020): JURNAL PILAR TEKNOLOGI
Publisher : LPPM Universitas Merdeka Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33319/piltek.v5i2.57

Abstract

Abstract— Slope slides can occur if the specific gravity of the land working as the driving force is greater than the shear stress that serves as a restraining force. To prevent landslides there are several methods that can be used, one of them is using sheet pile as a soil barrier. Besides working to hold the soil, the sheet pile also functions to prevent the entry of water into dug pits, so it is very good to be used at the edge of the sea or river. The formulation of the problem that arises is how the value of active and passive soil pressure on the sheet pile, as well as how the suitable CPC Sheet Pile specifications are used in this study. The research method used is geotechnical analysis for sheet pile retaining walls. Based on soil data and calculation analysis, the value of active soil pressure on sheet pile is 104.06 kN / m and the value of passive soil pressure is 206.19 kN / m2. The CPC Sheet Pile specification used is Type W-600A, 15 meters long with Mcrack = 50.6 Ton.meter. Keywords—: Slope slides; sheet piles; the value of active and passive; geotechnical analysis.
Sistem Informasi Akuntansi pada Pondok Pesantren Ahmad Dahlan Berbasis Dekstop Sartika, Aprillia Dwi
JURNAL PILAR TEKNOLOGI : Jurnal Ilmiah Ilmu Ilmu Teknik Vol 4, No 1 (2019): Jurnal Pilar Teknologi
Publisher : LPPM Universitas Merdeka Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33319/piltek.v4i1.22

Abstract

Financial management systems in Islamic boarding schools Ahmad Dahlan have used in the use of computers, namely by noting a financial report in and out in Microsoft Excel. But the use of devices the computers are not optimal. Due to lack of use, Microsoft excel cause to the emergence of a new problem, among others file that is stored too long susceptible to broken or corrupt. Hence the writer provides solutions by building an information system that might increase the ease of, the accuracy of and security. In addition, this accounting information system can make maximum use of computers in the management of financial data and does not require the time and place of plenty for its final resting. The methodology used is in the design of this is a waterfall with modeling UML ( The unified modeling language) as modeling graphic. There are several stages in the development of which is executed is system design, analysis, the design of a model, implementation, testing, and maintenance or care. The accounting information system is able to give a solution to the existing problems with reference to the design process that they were previously, hopefully with this application can help in processing financial data in Ahmad Dahlan Islamic boarding schools.
Penentuan Jumlah Tenaga Kerja Yang Optimal Bakhtiar E, Moh Arif; Susilo, Hendro
JURNAL PILAR TEKNOLOGI : Jurnal Ilmiah Ilmu Ilmu Teknik Vol 5, No 1 (2020): JURNAL PILAR TEKNOLOGI
Publisher : LPPM Universitas Merdeka Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33319/piltek.v5i1.46

Abstract

Abstract— Construction projects are a series of activities that have a time at the beginning and end time with the aim of realizing the idea into a physical form or building. Labor is one of the important resources, because often the supply is limited, both because of quality and other things. With a good workforce management impact on the completion of construction projects. But in the construction phase, contractors often experience many problems related to the construction project's labor allocation. This study uses the help of Microsoft Project 2007 application to create a network of Precedence Method Method (PDM) methods, then generate a bart chart for the preparation of a project implementation schedule or S schedule (time schedule) so that a histogram can be obtained after a leveling process is needed. The results of data analysis with a case study of the Bank Mandiri Development Project Palembang Office Building, it can be concluded leveling shows that the workforce needs are far less than previously planned. The number of planner workforce based on planner consultant data and reports is 8681 people and from the research results based on data processing the leveling process is only 7754 people. Keywords—: S curve; labour, histogram; Microsoft Project.
Abu Ampas Tebu Pengurang Semen Dalam Paving Jawara, Kholiddien Tyas; Winalda Purnama, Pramudya Fathoni; Prasetyo, Olga Donny; Tristono, Tomi
JURNAL PILAR TEKNOLOGI : Jurnal Ilmiah Ilmu Ilmu Teknik Vol 3, No 2 (2018): JURNAL PILAR TEKNOLOGI
Publisher : LPPM Universitas Merdeka Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33319/piltek.v3i2.17

Abstract

Cement is a basic requirement that is always needed in the construction work. Every year the price of cement has increased. In this experimental study using ash waste bagasse to reduce the amount  of cement in paving by substituting it. Variations in the composition of the addition of bagasse ash are 0%, 5%, 10%, 15%, 20%, 25% of cement volume and with a ratio of 1: 4, i.e., 1 cement and 4 sand. Based from the results of compressive strength analysis, water absorption, and density, the paving with a mixture of ash-bagasse gain of 5% is the best when compared to other mixtures. The result are a compressive strength of 34.63 MPa, the water retention capacity of 2.12% and the density of 1.39 gr / cm3. The paving with a mixture of 10% bagasse ash yielded a compressive strength of 33.84 Mpa, the water retention capacity of 2.23% and the density of 1.37 g / cm3, indicating that 10% ash addition had the same paving test results without the addition of ash bagasse. In SNI 03-0691-1996, paving with the addition of bagasse ash by 5% and 10% including as the paving of quality B. Keywords : ash of waste bagasse, paving, pozzolan.
DESAIN JEMBATAN T-GIRDER PADA SUNGAI JALAN ANTARA MENGGUNAKAN SNI 1725 2016 R, ardy Muhamad
JURNAL PILAR TEKNOLOGI : Jurnal Ilmiah Ilmu Ilmu Teknik Vol 5, No 2 (2020): JURNAL PILAR TEKNOLOGI
Publisher : LPPM Universitas Merdeka Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33319/piltek.v5i2.37

Abstract

Bridges are part of the national transportation system that has an important facility. In Putri Sembilan Village, Rupat Utara District, there is a very important bridge where this bridge is the only alternative for residents of Putri Sembilan Village to the fishing port and plantation. The current condition of the bridge has been damaged with wood material that has been decayed and hollow. For this reason, a new bridge was planned using reinforced concrete structures. This plan refers to SNI 1725-2016 concerning the loading of bridges and SNI T-12-2004 concerning the planning of concrete structures for bridges in the hope of obtaining a bridge structure that is safe and in accordance with applicable standards. The design consists of bridge slabs, sidewalks, stamped plates, girder beams and diaphragm beams. As the result, the main reinforcement slab D16-200 mm and D13-300 mm are obtained. Reinforcement direction extending the stamp plate obtained reinforcement D16-200 mm while for the transverse obtained D16-250 mm. For the main reinforcement girder beam obtained 28D32 mm, compressive reinforcement used 8D32 mm reinforcement and shear reinforcement used Ø13-100 mm reinforcement. While the main reinforcement of the diaphragm beam using 3D16 mm and shear reinforcement obtained Ø13-200 mm reinforcement.
Rancang Bangun Pemantau Daerah Endemik Malaria Berbasis IoT Menggunakan Metode Profile Matching Sahtyawan, Rama; Sudarmana, Landung
JURNAL PILAR TEKNOLOGI : Jurnal Ilmiah Ilmu Ilmu Teknik Vol 5, No 1 (2020): JURNAL PILAR TEKNOLOGI
Publisher : LPPM Universitas Merdeka Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33319/piltek.v5i1.51

Abstract

Abstract— Malaria is an endemic disease transmitted by Anopheles mosquitoes, which causes increased morbidity and mortality (morbidity and mortality), maternal and child health disorders, intelligence, labor force productivity, and detrimental to tourism. From these problems, a tool was developed to monitor endemic malaria areas in real-time by using temperature and humidity data for an area. Then analyzed using the profile matching method to calculate the weight/score gap in temperature and humidity conditions using interpolation, the data will be sent by the DHT 11 sensor found on NodeMcu. The application used to find out in real-time using the Blynk application as an internet of things board with a Wifi connection for the next step NodeMcu requires coding using the Arduino IDE program, for testing the location system used consists of 5 locations namely: L1 = Jl.Magelang, L2 = Jl.Maguwoharjo, L3 = Jl.Babarsari, L4 = Jl.Wates km9, L5 = Jl.Ali times km 8. Obtained temperature and humidity data (L1 = 36.30), (L2 = 18.32), (L3 = 23.45), (L4 = 38.33), (L5 = 35.53), then the gap weight calculation using the interpolation method obtained temperature and humidity data (L1 = 3,800; 3,974), (L2 = 4,600; 4,179), (L3 = 5,000; 5,000), (L4 = 3,400; 4,282), (L5 = 4,000; 5.00), the results obtained from rank 5 locations are malaria-endemic areas, rank 1 = L3-Babarsari, rank 2 = L5-Jl.Kaliurang km 8, rank 3 = L2-Jl.Maguwoharjo, rank 4 = L1-Jl.Magelang, rank 5 = L4-Jl.Wates. from the ranking data, the location must be prioritized L3-Babarsari. Keywords—: Malaria; DHT 11, NodeMCU; Profile Matching; Blynk.
Analisis Sistem Informasi CRM Untuk Meningkatkan Pelayanan dengan Pendekatan SDLC (Studi Kasus: UMKM “SAKTI”) STT, Latjuba Sofyana; Putera, Andi Rahman
JURNAL PILAR TEKNOLOGI : Jurnal Ilmiah Ilmu Ilmu Teknik Vol 4, No 2 (2019): JURNAL PILAR TEKNOLOGI
Publisher : LPPM Universitas Merdeka Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33319/piltek.v4i2.41

Abstract

The development of information technology is endless. Every day there is something new that we can find outside. Will affect many sectors. One of the fastest growing is UMKM. Screen printing and convection is one of the UMKM that produces and sells plain shirts and screen printing. To improve its services, screen printing and convection information systems need to be developed so that the service is more optimal, effective and efficient. Customer Relationship Management (CRM) is a core business strategy that can support, obtain and retain customers. Based on the results of the needs analysis and system analysis of the company that can be known about the CRM modules needed for the system are Customer Service and Support (CSS) and Entreprise Marketing Automation (EMA).
Pengembangan Sistem Informasi Geografi Bencana Alam Pada Kabupaten Madiun Berbasis Web Menggunakan Metode Build and Fix Gayu, Ezra; Utomo, Pradityo; Amadi, Dwi Nor
JURNAL PILAR TEKNOLOGI : Jurnal Ilmiah Ilmu Ilmu Teknik Vol 3, No 2 (2018): JURNAL PILAR TEKNOLOGI
Publisher : LPPM Universitas Merdeka Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33319/piltek.v3i2.13

Abstract

Development Natural Disaster Information Geografis System is a website service utilizing digital map service. To facilitate the Regional Disaster Management Agency (BPBD) and the Community of Madiun Regency in providing and receiving information about the occurrence of Natural Disasters in Madiun District, the need for the application of information systems. The information system can display the points where the Natural Disasters occur. With the Information System, everyone can see the location of the map of the disaster occurrence area along with the description of the area. in this study developed a "Natural Disaster Information System at Madiun district". System development using Build and Fix method, because it is considered fast in making the system. The built system can be expected to assist BPBD officers in performing their duties. So that the system built must have the ability to form information accurately the occurrence of natural disasters. Therefore, the disaster information system in Madiun district has been tested using blackbox method, with 100% system success rate. Keywords : Web, Madiun District, Natural Disaster, Information Geografis System, Build and Fix, Blackbox

Page 3 of 12 | Total Record : 116