cover
Contact Name
Maria Magdalena Wahyuni Inderawati
Contact Email
wahyuni.inderawati@atmajaya.ac.id
Phone
+6221-80827207
Journal Mail Official
jurnal.metris@atmajaya.ac.id
Editorial Address
Program Studi Teknik Industri Universitas Katolik Indonesia Atma Jaya Kampus 3 Cisauk, Jalan Raya Cisauk Lapan No. 70, Cisauk, Tangerang, Banten Banten, 15345
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Metris: Jurnal Sains dan Teknologi
ISSN : 14113287     EISSN : 28084810     DOI : https://doi.org/10.25170/metris
Jurnal Metris is published 2 (twice) a year. Since Volume 14 in 2013, Jurnal Metris has been published in June and December. The contents of the journal discuss research results in the field of industrial engineering. Jurnal Metris provides a place of publishing for sharing the new findings from research results of researchers, academics, scientists, and practitioners who related to the scope (but not limited) of: 1) Smart Production; 2) Lean Manufacturing; 3) Product Design & Development; 4) Human Factors Engineering; 5) Management Science and Operation Research; 6) Logistics and Supply Chain Management; 7) Decision Science in Business and Management; 8) Quality Engineering.
Articles 8 Documents
Search results for , issue "Vol. 17 No. 01 (2016): 2016" : 8 Documents clear
Model Integrasi Sistem Produksi Multi Suplier Single Buyer Pada Sistem Just In Time Slamet Setio Wigati
Jurnal METRIS Vol. 17 No. 01 (2016): 2016
Publisher : Prodi Teknik Industri, Fakultas Teknik - Universitas Katolik Indonesia Atma Jaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This research will discuss the integration of two suppliers single buyer in a Just In Time (JIT) environment. Supplier transform raw materials into semi-finished goods or components with a constant production rate. Buyer change of supplier components into a finished product with a constant production rate. Order quantity of the buyer are few innumber.If suppliers produce according to the buyerorder quantity, the expensive setup costs, then the supplier will produce the specified lot size to be sent multiple times to the buyer. The purpose of this research is to minimize the total joint inventory cost between suppliers and buyer, which includes setup cost and holding cost of the two supliers and order cost and holding cost of the buyer. The decision variables are theproduction lot and the number of deliveries in a single production lot both of supplier 1 and supplier 2. Numerical example and sensitivity analysis will be given in this research.
Analisis SWOT Obat Batuk Prospan pada PT. Soho Global Health Hermanto Hermanto
Jurnal METRIS Vol. 17 No. 01 (2016): 2016
Publisher : Prodi Teknik Industri, Fakultas Teknik - Universitas Katolik Indonesia Atma Jaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study discusses the importance of a swot analysis process that addressed the issue of the power of factors that influence the success of PT. SOHO Global Health seen from the internal factors of strength, of products containing the active ingredient herbal extract of ivy leaves, supported by many clinical studies, and a good corporate image in the market the medicines made from herbs. Internal factors drawback is the absence of packing tablets / capsules, the price premium relative and physician confidence will naturally medicines (herbal) is still weak. External factors are the chances of the market (consumers) began actively searching for safe medications are made from herbs and herbal remedies have not been many outstanding with reputable pharmacy. The external factor is the threat of an active promotional activities of competitors (competitors) and drugs made from chemicals ekpektoran already widely available in Indonesia. The results of the research process SWOT analysis in PT. SOHO Global Health explained that the product is at a stage prospan Oriented Growth Opportunities Strategy to 1.77 and power of 2:08. The figure is good enough where the company has the power so that it can take advantage of the opportunities that existed until the company can grow well and be able to market the product Prospan ekpektoran drug market in Indonesia. the conclusions obtained from this study are as follows: the validity of the test results with SPSS 16 software of all respondents who researched many as 30 of the 14 indicators revealed a 100% valid, proving that r count is greater than r table. Data obtained above Cronbach alpha of 0.80 is equal to 0, 893 then the data is said to be unreliable (good).
Analisis Waktu Picking dengan Menggunakan Zone System Agung Chandra
Jurnal METRIS Vol. 17 No. 01 (2016): 2016
Publisher : Prodi Teknik Industri, Fakultas Teknik - Universitas Katolik Indonesia Atma Jaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Productivity in order picking time is continuously evaluated and analyzed, because mostly picking is done manually by human. Zone system is one of the methods to increase productivity. In this research, zones is determined by a number of pickers and zone in warehouse is evaluated and divided into 1 zone to 3 zones, congestion and blocking factor are negligible, random storage assignment and S-Shape routing method are used. Total travel time is calculated by summing travel time within storage aisle, travel time in the cross aisle, setup time, and picking time. By comparing among all zones, the result indicates that when the number of zones increases, expected time to finish pick route will be decreased.
Pengembangan Model Pembentukan Sel dengan Kriteria Majemuk Trifenaus Prabu Hidayat
Jurnal METRIS Vol. 17 No. 01 (2016): 2016
Publisher : Prodi Teknik Industri, Fakultas Teknik - Universitas Katolik Indonesia Atma Jaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Stages of designing the layout of the manufacturing cell involves three steps: (1) the cells formation, (2) designing the layout of the intracellular and (3) designing the layout of intercellular. This study made a model of cell formation. At this stage of cell formation, the criteria to be considered are the cost of an additional investment of machinery, material handling costs intracellular, intercellular material handling costs, cost of work in process and penalty fees under the machine utilization. Intracellular layout design stage, the criteria to be considered is the cost of work-in-process. While the design stage layout intercellular consider the cost of work-in-process. The performance of the layout of the cells was evaluated using a numerical example.
Minimalisasi Ongkos Unit Produksi dengan Otomatisasi Proses Operasi Dony Susandi; Whydiantoro Whydiantoro; Dadan Agus Hermawan
Jurnal METRIS Vol. 17 No. 01 (2016): 2016
Publisher : Prodi Teknik Industri, Fakultas Teknik - Universitas Katolik Indonesia Atma Jaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Companies are required to meet consumers need with limited capacity and capability of the company. In addition to limited capital, adaptability of technology absorption into the barriers that have an impact on production activities. Material handling activities involving the removal, handling, storage and material control with tools, people or machines. One of the main objectives are to reduce the production cost units through simplification, combination, shortening or eliminating unnecessary process. Programmable Logic Controller (PLC) can be applied to the production process activities (automation), including material handling to make it more efficient and effective so as to reduce the production time. This study consists of several stages, namely stages of identification, data collection and processing analysis and conclusion. the principle of the use of material handling equipment including the planning principle, the principle of standardization, working principle, ergonomic principles, and the principles of automation. This research aims to minimize the cost of the material handling control system using PLC. Some of the data used in the study is the operation process chart, routing sheet, average production time, material removal capacity and frequency, number of employees, the cost of labor, hours of work and rectilinier method used to determine the distance between facilities. The results showed a production unit with process automation (PLC) in material handling Rp. 5.99,- per meter, while production unit using manual labor (human) issued Rp. 8.42,- per meter.
Penentuan Ukuran Batch pada Batch Processor untuk Meminimasi Makespan Filscha Nurprihatin
Jurnal METRIS Vol. 17 No. 01 (2016): 2016
Publisher : Prodi Teknik Industri, Fakultas Teknik - Universitas Katolik Indonesia Atma Jaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This research determines single-item batch sizing on a batch processor with increasing batch processing time linearly if batch size is more than critical size. The set up time of each batch is constant and it is managed before raw material exist on a machine. The decision variables in this research are the number of batches and batch sizes to minimize makespan. This research assumes all orders have to be delivered to the customer at the same time (common due date). This research also develops an algorithm for common due date case studies. The resulted model development can solve the batch sizing problem and the quality of solution is feasible. For demand 125 tons and the capacity of a batch is 50 tons, then
Pendekatan Konseptual Lean Agile untuk Perbaikan Sistem Produksi pada Perusahaan Konveksi (Studi Kasus CV. XYZ) Hotma Antoni Hutahaean; Brian Purnawan; Jacqueline Elvina
Jurnal METRIS Vol. 17 No. 01 (2016): 2016
Publisher : Prodi Teknik Industri, Fakultas Teknik - Universitas Katolik Indonesia Atma Jaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study discusses the proposed improvements to the production system using lean agile supply chain approach. In the middle’s company, one of which is the problem that the turnaround time is too long or waiting waste and defect waste. Under the existing conditions, the company's production system to improve production speed in response to rapid changes in consumer interest and improve product quality. There are 3 stages used in the Lean Agile approach that are phase planning, execution, and delivery. The data obtained from the company necessary, through observation, and through direct measurement. Based on the research that has been made known that there are four kinds of defects that are CTQ (Critical to Quality), four types of defects are defects hollow, fibrous defect, defect loose stitches, and gross defects / stains. In the planning process we already know what the model variant is desired by consumers is a model school crest motif symbol, foundations, public, and school patron, besides the application of a pull system and didapti empowerment of teams who want to make changes repairs.Proposed improvements are the main target of this research, which at this stage 5S approach work attitude, the manufacture of tools to support performance changes, as inputting the manufacture of flexible software, and implementation of design improvements that have been made into the main ingredients in providing a solution to improve the speed work and minimize the occurrence of defects in order to improve quality.
Filsafat Ilmu dalam Perkembangan Ilmu Manajemen Rantai Pasok Diyah Dwi Nugraheni; Wahyudi Sutopo
Jurnal METRIS Vol. 17 No. 01 (2016): 2016
Publisher : Prodi Teknik Industri, Fakultas Teknik - Universitas Katolik Indonesia Atma Jaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Philosophy plays an important role in any development of science. Besides philosophy, science also an important thing to understand. Philosophy and science are related to each other. Science philosophy defined as a philosophical review that examined about the nature of science, including the science of supply chain management. This study was conducted by literature study then conducted an analysis based on the evolution, development of science, terminology, and contribution of supply chain management. The evolution of supply chain management consists of the creation era, integration era, globalization era, specialization era and SCM 2.0. The development of supply chain management science began in the 1950s, which in that year is considered in terms of military logistics. Until in the end the term "supply chain management" appeared in 1997. Terminology supply chain management consists of collaboration, integration and sustainability of the supply chain. Contribution to the implementation of supply chain management is to achieve customer satisfaction, increase revenues, decrease costs, higher asset utilization, increase profits, and the greater company. This study resulted in the mapping of supply chain management science so that easy to learn.

Page 1 of 1 | Total Record : 8