Perbaikan Tegangan dengan Menggunakan Kapasitor Bank 25 MVAR pada Gardu Induk Banda Aceh Suriadi; Azmi, Saddam; Gapy, Mansur; Ali, Masri; Arhami; Ibrahim, Masri; Suhaeri; Nasution, Elvy Sahnur
Journal of Engineering and Science Vol. 2 No. 1 (2023): January-June 2023
Publisher : Yayasan Kawanad

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56347/jes.v2i1.118

Abstract

The Nagan Raya coal-fired power plant in Aceh, Indonesia, serves as a major supplier of electricity to the region's power grid. However, the power generation unit of the plant, which supplies reactive power to the subsystem, often experiences disturbances that cause voltage values in the Banda Aceh substation system to decrease. This decrease in voltage can be detrimental to the quality of power supplied to the consumers. To address this issue, a capacitor bank with a capacity of 25 Mvar was installed at the end of 2016. The capacitor bank was successful in increasing the voltage value at the substation and proved to be an effective solution. However, with the anticipated growth in load in the coming years and the possibility of future disturbances in the power generation unit, it has been proposed that an additional capacitor bank unit with the same capacity be installed to further enhance the voltage quality at the Banda Aceh substation. To assess the feasibility of this proposal, simulations were carried out using ETAP 12.6.0 software. The simulation results show that the addition of a 25 Mvar capacitor bank unit would lead to an increase in the substation voltage value of around 5-6 KV. This increase in voltage would help to maintain the quality of power supplied to the consumers and ensure that the power grid remains stable even in the event of disturbances in the power generation unit. Overall, the proposed installation of an additional capacitor bank unit would be a cost-effective solution to enhance the voltage quality at the Banda Aceh substation and ensure the stability of the power grid. This solution could be adopted by other power plants facing similar issues in maintaining voltage quality in their power grid systems.
Optimalisasi Performa Sistem Tegangan dengan Pemasangan Kapasitor Bank pada Pembangkit Listrik Tenaga Uap (PLTU) Nagan Raya Syukri, Mahdi; Suriadi; Sara, Ira Devi; Siregar, Ramdhan Halid; Muhibbuddin; Masri
Journal of Engineering and Science Vol. 2 No. 1 (2023): January-June 2023
Publisher : Yayasan Kawanad

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56347/jes.v2i1.165

Abstract

This research aims to optimize the performance of the voltage system at the Nagan Raya Steam Power Plant (PLTU) by installing capacitor banks. Capacitor banks are integrated into the system to increase voltage stability, reduce power losses, and increase energy efficiency in PLTUs. The research method involves analyzing the existing voltage system, designing the capacitor bank installation, and evaluating the system performance after installation. It is hoped that the results of this research can make a positive contribution in improving the performance of PLTU Nagan Raya and overall energy efficiency.
Analisis Ketidakstabilan Beban Arus Netral dan Rugi-Rugi Daya Pada Trafo Distribusi Penyulang Pas 21 PT. PLN UPB Banda Aceh Suriadi; Sara, Ira Devi; Syuhada, Ahmad; Masri; Asri; Umurani, Khairul
Journal of Engineering and Science Vol. 2 No. 2 (2023): July-December 2023
Publisher : Yayasan Kawanad

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56347/jes.v2i2.167

Abstract

This research focuses on analyzing power losses due to load imbalance in the medium-voltage distribution network in Pasar Aceh. The aim is to determine the magnitude of power losses that occur at the distribution substation in Pasar Aceh. The research method involves analysis, calculations, and simulations using the ETAP 12.6 software. The results of the analysis indicate that load imbalance in the Pasar Aceh substation leads to power losses. The Trafo Samping Pasar Aceh experiences power losses of 0.77% with a load imbalance of 16.33%. The second transformer in the BNI 46 area incurs power losses of 0.98% with a load imbalance of 30.33%, and the transformer in the BLKG KOTTY area has power losses of 1.17% with a load imbalance of 50.33%. These findings affirm that the greater the load imbalance, the higher the resulting power losses in the electrical distribution network.