Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal Logistik Indonesia

Supply Chain Analysis of Green Mussel Business in Umbul Asem Village Bandar Lampung Susanti Sundari
Jurnal Logistik Indonesia Vol 6, No 1: APRIL 2022
Publisher : Institut Ilmu Sosial dan Manajemen Stiami

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31334/logistik.v6i1.2219

Abstract

Umbul Asem village is a coastal area has a fairly high potential, especially the farming of green mussels. However, the prospect of green mussel farming which is quite large is still not realized by all fishermen so it is necessary to conduct research to determine the green mussel supply chain and see what opportunities from its business so that it can be developed. This is a descriptive research which is conducted in field and desk research. The results indicate the green mussel supply chain starts from farmers to distributors then to retailers and to end consumers, while supply chain players manage relationships between supply chain from upstream to downstream and vice versa well. Some of the green mussel business opportunities that are visible include selecting the Longline method to minimize costs and increase profits also suitable for high wave waters, farming is simple and does not require special treatment, lots of green mussel seeds are available in the waters, the profit from one longline is around Rp. 691,667, the location is close to PPI Lempasing (3 km in 8 minutes). In addition to developing the green mussel business, it is necessary to conduct a study that is in line with the government's efforts in formulating a strategy for developing the fishing industry in Bandar Lampung.
ANALISIS PERENCANAAN BAHAN BAKU DI UD. AA DENGAN MENERAPKAN METODE MATERIAL REQUIREMENT PLANNING (MRP) Rudi Abdika Saputra; Inna Kholidasari; Susanti Sundari; Lestari Setiawati
Jurnal Logistik Indonesia Vol 5, No 1: April 2021
Publisher : Institut Ilmu Sosial dan Manajemen Stiami

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31334/logistik.v5i1.1180

Abstract

This study discusses the application of the material requirements planning (MRP) method in the planning of raw materials in a furniture company. The purpose of this research is to know the planning of raw materials for furniture products in UD. AA, determine the most suitable inventory model to be applied to material inventory planning and analyze the role of the MRP system in raw material procurement planning. The forecasting method used is the quantitative method of time series analysis, determining the master production schedule, calculating lot sizing (LFL, EOQ, POQ methods). From determining the Master Production Schedule, it is found that the cabinet production plan for the next three months is 4 units per period or week, and based on the calculation of Material Requirement Planning (MRP) it can be seen what components are needed for the manufacture of cabinets, how many and when each component is required. Therefore it is obtained that the total raw material requirement for wood for the next three months is 11.34 m³.