Perencanaan Ulang Pelebaran Jalan Ruas Tapan- Batas Bengkulu Sta 224+400 – 225+300 Gusni Vitri; Wiwin Putri Zayu; Annora Levina; Hazmal Herman
Jurnal Ilmiah Rekayasa Sipil Vol 19 No 1 (2022): April 2022
Publisher : Pusat Penelitian dan Pengembangan Masyarakat (P3M), Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jirs.v19i1.755

Abstract

Road infrastructure has a very important role in human life. Roads are the most important infrastructure of land transportation, with access roads from one area to another becoming easier. The development of roads from time to time is also increasing rapidly. The development of land transportation and the development of human activities was also followed by the repair, widening, and opening of new roads as happened in Nagari Tapan, where this nagari is one of the connecting accesses for the Province of West Sumatra and Bengkulu Province. This re-planning uses the 2013 Bina Marga regulation and the 1997 Intercity Road Geometric Planning Procedure (TPGJAK). The redesign process starts with data collection, data analysis, road geometric calculations, pavement thickness and budget plan (RAB). From the results of the calculation of the Geometric Planning of the Bengkulu-Boundary Tapan Road, it can be concluded that the Bengkulu-Boundary Tapan Road is local, with a 2-lane 2-way road type, 2×3.5 meters wide, flat terrain class and a design speed of 40 km/hour. Planning Horizontal alignment is planned for one type of bend in the form of 2 (two) Spiral Circle Spiral bends and vertical alignment is planned for 14 PV Points of Vertical. Based on the results of Flexible Pavement with the 2013 Highways Analysis, the overall pavement thickness is 42 cm, consisting of 4 cm AC-WC thickness, 6 cm AC-BC thickness, 14.5 cm AC-Base thickness, and 17.5 cm sub-base thickness. Flexible Pavement Construction Cost Rp. 5,104,375,000,- (five billion one hundred four million three hundred and seventy five thousand rupiah).
DESKRIPSI SERTIFIKASI KOMPETENSI TUKANG LOKAL DI PROVINSI SUMATERA BARAT Gusni Vitri; Deni Irda Mazni
Racic : Rab Construction Research Vol 3 No 01 (2018): Terbitan Kelima Bulan Juni 2018
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (731.331 KB)

Abstract

The construction regulation desires that every user and service provider is required to hire a construction worker who has a work competency certificate. As one skilled manpower, construction craffs give a significant contribution to the quality of construction works. The Construction Services Development Agency (LPJK) of West Sumatera Province as an organization for the construction service community has an important role in the certification registration of construction craffs. This is a descriptive quantitative research, with primary and secondary data collection from related stakeholders. Analyzes were performed for the data of the number of certification participants in the construction building workers category with architectural classification (TA code), civil classification (code TS) and environment (Code TT) in West Sumatera Province from 2014 until October 2017. The results showed that the number of registered construction craffs during the period as many as 3286 people and only 16.71% of that number who have identity cards domicile in the province of West Sumatra. As many as 83.29% registered construction craffs are from various regions in Indonesia (outside West Sumatra Province). Registration to obtain certificate of competence is mostly done in year 2015.
ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK REHABILITASI SEKOLAH DALAM MASA PANDEMI COVID-19 Gusni Vitri; Wendi Boy; Wiwin Putri Zayu
Racic : Rab Construction Research Vol 5 No 2 (2020): Desember
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v5i2.1543

Abstract

Implementation of construction projects requires resources of materials, labors, equipments, methods and capital to achieve project objectives, namely on time, on quality and according to planned costs. Various internal and external factors influence during project implementation. The conditions of the Covid-19 pandemic that occurred in Indonesia and the world were one of the factors inhibiting project completion. The Primary School Rehabilitation Project in West Pasaman Regency is spread over 15 (fifteen) locations in all sub-districts. The project was contracted in early 2020, before the Covid-19 outbreak erupted. This project has been delayed due to the implementation with 2 (two) addendums to extend the implementation time. This research is descriptive quantitative and qualitative, with data collection techniques through questionnaires and direct interviews with respondents, that are Contractor, Construction Management Consultant and Owner (Ministry of Public Works, Housing and Building Information Center Work Unit West Sumatra Province). The results showed that the most dominant cause of project delays was Force Majeure, Government Policy, Design. Apart from that, other factors that also influence are the weather, the characteristics of the place and the materials.
ANALISA FAKTOR PENYEBAB DAN AKIBAT CONTRACT CHANGE ORDER PADA PROYEK KONTRUKSI GEDUNG DI KABUPATEN LIMAPULUH KOTA Fatma Ira Wahyuni; Elvi Syamsyuir; Gusni Vitri
Ensiklopedia of Journal Vol 4, No 1 (2021): Vol 4 No. 1 Edisi 1 Oktober 2021
Publisher : Lembaga Penelitian dan Penerbitan Hasil Penelitian Ensiklopedia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (119.782 KB) | DOI: 10.33559/eoj.v4i1.1039

Abstract

The implementation of construction work is limited by time, quality and cost. There are many problems that can cause changes to work items. In the area of West Sumatra, especially in Limapuluh Kota Regency, in the completion of construction projects, contract change orders often occur. The purpose of this study is to find out what factors are the causes of contract change orders on building construction projects and the impact of change orders on costs and time on building construction projects in Lima Puluh Kota Regency. This research is quantitative. The results of the study found that the causes of contract change orders according to contractors and owners were design changes, work scope changes, work delays, specification changes, work implementation errors, and incompatibility of field conditions with those listed in the contract with different percentages for each. Meanwhile, the effect of CCO on time and cost is with a percentage of <10%.
Pemanfaatan Limbah Kelapa Sawit Sebagai Material Tambahan Beton Gusni Vitri; Hazmal Herman
Jurnal Teknik Sipil Institut Teknologi Padang Vol 6 No 2 (2019): Jurnal Teknik Sipil Institut Teknologi Padang
Publisher : ITP Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (405.18 KB) | DOI: 10.21063/jts.2019.V602.078-87

Abstract

Beton masih menjadi struktur perkuatan yang umum digunakan di Indonesia karena memiliki beberapa keunggulan seperti harganya relatif murah, mudah pengerjaan di lapangan, tahan terhadap kebakaran. Campuran beton secara umum menggunakan semen portland, kerikil, pasir, semen, dan air. Kualitas material tersebut akan menentukan kualitas beton yang diperoleh. Di samping material konvensional tersebut, variasi lain juga bisa dilakukan dalam campuran beton untuk memperoleh mutu beton yang diinginkan. Penelitian ini adalah penelitian Laboratorium menggunakan campuran bahan tambahan yang berasal dari limbah kelapa sawit. Limbah kelapa sawit cukup banyak terdapat di Provinsi Sumatera Barat karena pabrik kelapa sawit menyebar di Kabupaten Pasaman Barat. Limbah kelapa sawit yang digunakan adalah cangkang dari kelapa sawit, sebagai variasi dari agregat kasar dan limbah pembakaran cangkang kelapa sawit atau abu boiler sebagai variasi dari agregat halus. Material yang digunakan, akan diuji terlebih dahulu sesuai dengan ketentuan SNI beton dan akan dibuat komposisi adukan beton dengan kualitas mutu tepat 25 MPa. Hasil pemeriksaan uji laboratorium menyatakan bahwa karakteristik untuk agregat halus dan agregat kasar dapat digunakan karena memenuhi standar SNI. Begitupun dengan limbah kelapa sawit, didapatkan bahwa untuk analisa saringan, berat jenis, penyerapan telah memenuhi standar SNI sehingga dapat digunakan sebagai pengganti agregat dengan jumlah tidak lebih dari 10% untuk abu boiler kelapa sawit dan tidak lebih dari 30% untuk cangkang kelapa sawit. Hasil Kuat Tekan Beton rata-rata pada hari ke7 dan hari ke-28 di dapatkan sebesar 21 Mpa, belum memenuhi estimasi awal kuat tekan yang diinginkan sebesar 25 MPa.
Permodelan Parkir Pasar Kota Padang Panjang Wiwin Putri Zayu; Gusni Vitri
Jurnal Teknik Sipil Institut Teknologi Padang Vol 6 No 2 (2019): Jurnal Teknik Sipil Institut Teknologi Padang
Publisher : ITP Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (463.654 KB) | DOI: 10.21063/jts.2019.V602.088-97

Abstract

Selesainya pembangunan Pasar Baru Kota Padang Panjang membutuhkan penataan parkir untuk masyarakat. Kurangnya lahan parkir yang tersedia menyebabkan banyaknya parkir pada badan jalan yang mengganggu lalu lintas kendaraan. Untuk itu perlu dilakukan penataan parkir kembali terhadap lahan parkir tersebut. Penelitian dilakukan dengan metode pengamatan langsung di lapangan dan pembuatan permodelan. Penelitian diawali dengan penentuan wilayah studi dan studi literatur, yaitu karakteristik parkir, tipe/bentuk permodelan parkir, satuan ruang parkir dan kapasitas parkir. Survei lapangan meliputi survei lokasi dan penentuan waktu survei untuk pengumpulan data lapangan meliputi jumlah kendaraan keluar masuk untuk interval 1 jam, kapasitas parkir eksisting, lay-out parkir. Dilanjutkan pengolahan data untuk penentuan kebutuhan ruang parkir dan beberapa bentuk pola parkir. Jumlah total volume puncak terjadi pada hari jum’at dengan kendaraan masuk 21962 kendaraan dan 19785 kendaraan keluar. Volume kendaraan yang parkir di badan jalan untuk sepeda motor yaitu 1786 pada pukul. 09.00-10.00 wib dan mobil sebanyak 257 pada pukul 14.00-15.00 wib. Akumulasi parkir tertinggi sepeda motor terjadi pada pukul 16.00-16.15 wib yaitu 1896 motor dan 95 mobil terjadi pada pukul. 17.00-17.15 wib. Indeks parkir mobil sudah mendekati sebesar 95,96%, yang menunjukkan bahwa ketersediaan lahan parkir untuk mobil sudah mendekati jenuh atau hampir melebihi kapasitas. Jika dilihat dari lahan parkir yang tersedia pada badan jalan 99 SRP dan kebutuhan lahan parkir pada jam puncak 173 SRP maka terjadi kekurangan lahan parkir untuk mobil sebanyak 74 SRP kekurangan ini dapat dikurangi dengan menambahkan lahan parkir di terminal mikrolet (angkot). Indeks parkir sepeda motor yaitu 251,79% > 100%. Perlu segera dilakukan penambahan lahan parkir.
Studi Komparatif Pelaksanaan Tugas Besar Perencanaan Geometrik Jalan Secara Daring Dan Luring Wiwin Putri Zayu; Hazmal Herman; Gusni Vitri
Jurnal Penelitian Dan Pengkajian Ilmiah Eksakta Vol 2 No 1 (2023): Jurnal Hasi Penelitian Dan Pengkajian Ilmiah Eksakta - JPPIE
Publisher : LPPM Universitas Dharma Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/jppie.v2i1.762

Abstract

Perubahan metode pembelajaran selama masa Pandemi Covid 19 menuntut banyak penyesuaian yang berpengaruh pada hasil pembelajaran. Salah satunya yaitu pelaksanaan Tugas besar Perencanaan Gometrik Jalan yang dahulunya dilaksanakan secara luring, sekarang dilaksanakan secara daring. Dalam pengerjaan tugas besar secara daring diperoleh rerata pemahaman mahasiswa terhadap materi pembelajaran dan tugas besar Perencanaan Geometrik jalan yaitu 68,78%. Sedangkan persentase tingkat pemahaman mahasiswa dalam pengerjaan tugas besar secara luring yaitu 69,46%. Terdapat perbedaan tingkat pemahaman mahasiswa sebesar 0,68%. Perbedaan ini menunjukkan bahwa pembelajaran dan pengerjaan tugas besar Perencanaan Geometrik Jalan secara luring lebih mudah difahami dibandingkan pengerjaan secara daring.