Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : PROMINE

Analisa Kandungan Merkuri (Hg) Di Wilayah Penambangan Emas Danau Payawan Desa Tumbang Panggo Kecamatan Tasik Payawan Kabupaten Katingan Fahrul Indrajaya; Lisa Virgiyanti
PROMINE Vol 7 No 2 (2019): PROMINE
Publisher : Jurusan Teknik Pertambangan, Fakultas Teknik, Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/promine.v7i2.1646

Abstract

Field activities conducted to determine the level of mercury content in the water flow of Lake Payawan,Tumbang Panggo Village, Tasik Payawan District, Katingan Regency, Central Kalimantan Provincebased on laboratory test results to obtain the results of mercury content in upstream to downstream ofLake Payawan. From this research, it is necessary to test the quality of water in the laboratory in orderto analyze the water quality parameters so it can be known mercury content (Hg) in Lake Payawanwater flow. From the test results on 6 points river water samples in the laboratory of the IndustrialResearch and Standardization Center of Banjarbaru City showed the highest mercury content found insample number 3 with P. 2076 test code taken at the location of the middle Lake Payawan TasikPayawan District with mercury levels located At a rate of 0.069 μg / l or 0.000069 mg / l, this reflectsthe presence of other factors that may also affect the level of mercury content in Lake Payawan flow.
Penilaian Keberhasilan Reklamasi Pada Pit Serujan Utara PT. IMK Kabupaten Murung Raya Fahrul Indrajaya; Marlen Fince T. L.; Neny Fidayanti; Yossa Yonathan Hutajulu
PROMINE Vol 8 No 1 (2020): PROMINE
Publisher : Jurusan Teknik Pertambangan, Fakultas Teknik, Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/promine.v8i1.1793

Abstract

PT. IMK is located in Murung Raya Regency, Central Kalimantan Province, which is engaged in gold and silver mining with an area of 47.940 hectares contract. The purpose of this study is to assess the reclamation activities that have been done in the Serujan Pit. The implementation of reclamation in PT. IMK begins with the stage based on the decree of the Minister of Energy and Mineral Resources Number : 1827 K/30/MEM/2018 on the guidelines of good mining engineering regulations. The parameters used in assessing the success of reclamation are land utilization, revegetation, and finishing. The results of the success criteria derive the score value and the weights used as the basis of the assessment. Based on the results of the reclamation assessment obtained by the total value of 93.33%, with a good category (reclamation results are acceptable).