ANALISIS ESTIMASI BIAYA PEMBANGUNAN RUMAH EKONOMIS DAN RAMAH LINGKUNGAN UNTUK MASYARAKAT BERPENGHASILAN RENDAH Atep Maskur
Jurnal Media Teknologi Vol. 8 No. 2 (2022): Jurnal Media Teknologi
Publisher : Jurnal Media Teknologi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1233.889 KB)

Abstract

Estimasi biaya pembangunan rumah ekonomis dan ramah lingkungan merupakan hal yang penting untuk memberikan gambaran pada pemerintah dan masyarakat sebagai acuan dalam pertimbangan menentukan berbagai pemilihan material bangunan yang ekonomis dan ramah lingkungan. Estimasi biaya pembangunan rumah ekonomis dan ramah lingkungan dapat pula dijadikan sebagai alternatif untuk kebutuhan rumah bagi masyarakat yang berpenghasilan rendah dalam pemenuhan kebutuhan papan yang ekonomis dan ramah lingkungan. Tujuan penelitian ini adalah menghitung estimasi anggaran biaya pembangunan rumah yang ekonomis dan ramah lingkungan untuk kebutuhan masyarakat yang berpenghasilan rendah. Metode yang digunakan dalam penelitian ini adalah metode analisis harga satuan yaitu dengan melakukan identifikasi masalah dengan cara menganalisis gambar teknik untuk mendapatkan volume pekerjaan, dan melakukan analisis anggaran biaya berupa analisis harga satuan setiap item pekerjaan sebagai bahan acuan untuk melakukan analisis. Pengumpulan data adalah suatu cara atau proses yang sistematis dalam pengumpulan, pencatatan, dan penyajian fakta untuk mencapai tujuan tertentu. Berdasarkan hasil penelitian didapat harga bangunan rumah tinggal yang ekonomis dan ramah lingkungan sebesar Rp. 88.054.000,- (delapan puluh delapan juta lima puluh empat ribu rupiah). Dengan menggunakan metode analisis harga satuan didapat rincian satuan bahan material, upah dan alat setiap item pekerjaan pembangunan rumah ekonomis dan ramah lingkungan. Harga bahan material, upah dan alat tersebut dapat dipilih dan ditentukan sendiri sesuai dengan kebutuhan dan kemampuan keuangan.
ANALISIS ESTIMASI BIAYA PEMBANGUNAN RUMAH EKONOMIS DAN RAMAH LINGKUNGAN UNTUK MASYARAKAT BERPENGHASILAN RENDAH Atep Maskur
Jurnal Media Teknologi Vol. 8 No. 2 (2022): Jurnal Media Teknologi
Publisher : Fakultas Teknik UNIGAL

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1233.889 KB) | DOI: 10.25157/jmt.v8i2.2665

Abstract

Estimasi biaya pembangunan rumah ekonomis dan ramah lingkungan merupakan hal yang penting untuk memberikan gambaran pada pemerintah dan masyarakat sebagai acuan dalam pertimbangan menentukan berbagai pemilihan material bangunan yang ekonomis dan ramah lingkungan. Estimasi biaya pembangunan rumah ekonomis dan ramah lingkungan dapat pula dijadikan sebagai alternatif untuk kebutuhan rumah bagi masyarakat yang berpenghasilan rendah dalam pemenuhan kebutuhan papan yang ekonomis dan ramah lingkungan. Tujuan penelitian ini adalah menghitung estimasi anggaran biaya pembangunan rumah yang ekonomis dan ramah lingkungan untuk kebutuhan masyarakat yang berpenghasilan rendah. Metode yang digunakan dalam penelitian ini adalah metode analisis harga satuan yaitu dengan melakukan identifikasi masalah dengan cara menganalisis gambar teknik untuk mendapatkan volume pekerjaan, dan melakukan analisis anggaran biaya berupa analisis harga satuan setiap item pekerjaan sebagai bahan acuan untuk melakukan analisis. Pengumpulan data adalah suatu cara atau proses yang sistematis dalam pengumpulan, pencatatan, dan penyajian fakta untuk mencapai tujuan tertentu. Berdasarkan hasil penelitian didapat harga bangunan rumah tinggal yang ekonomis dan ramah lingkungan sebesar Rp. 88.054.000,- (delapan puluh delapan juta lima puluh empat ribu rupiah). Dengan menggunakan metode analisis harga satuan didapat rincian satuan bahan material, upah dan alat setiap item pekerjaan pembangunan rumah ekonomis dan ramah lingkungan. Harga bahan material, upah dan alat tersebut dapat dipilih dan ditentukan sendiri sesuai dengan kebutuhan dan kemampuan keuangan.
EVALUASI PENGENDALIAN WAKTU PADA ROYEK PEMBANGUNAN GEDUNG KESEHATAN DENGAN MENGGUNAKAN METODE EARNED VALUE ANALYSIS Atep Maskur
Jurnal Industrial Galuh Vol. 3 No. 01 (2021): Jurnal Industrial Galuh
Publisher : Teknik Industri Fakultas Teknik UNIGAL

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (514.538 KB) | DOI: 10.25157/jig.v3i01.3000

Abstract

Tujuan penulisan ini yaitu menganalisa pengendalian waktu dengan metode Earned Value Analysis. Metode yang digunakan adalah menggunakan metode analisis deskriptif dengan mengumpulkan data untuk menguji hipotesis yang berkaitan dengan Analisa waktu. Studi kasus ini menghasilkan, bahwa proyek Pembangunan Pelayanan Obstreti Neonatus Essensial Dasar PUSKESMAS Kecamatan Parigi Kabupaten Pangandaran tidak mengalami keterlambatan atau sesuai jadwal rencana awal, meskipun pada minggu ke-2 secara perhitungan komulatif menggunakan metode Earned Value Analysis mengalami keterlambatan. Keterlambatan tersebut dapat diketahui dari perhitungan komulatif berdasarkan minggu ke-2 bahwa jumlah SV bernilai negatif yaitu Rp. -7.075.011,79 dan SPI bernilai kurang dari 1 yaitu 0,932 sehingga dapat diketahui perkiraan waktu penyelesaian proyek akan bertambah sebanyak 9 hari kalender atau menjadi 144 hari kalender dari jadwal rencana awal proyek. Mengatasi hal tersebut, pihak kontraktor pada minggu ke-17 mengambil keputusan untuk melakukan penambahan sistem pekerjaan berupa sistem lembur kerja selama 1 minggu dengan dimulai bekerja dari jam 16:00 WIB, kemudian istirahat pada pukul 18:00 hingga 19:00 dan berlanjut lembur kerja hingga pukul 22:00 WIB, sehingga proyek berhasil diselesaikan tepat waktu.
ANALISIS PERBANDINGAN BIAYA RENCANA PELAKSANAAN ANTARA UPAH HARIAN DAN BORONGAN TERHADAP RENCANA ANGGARAN BIAYA Atep Maskur
Jurnal Media Teknologi Vol. 9 No. 2 (2023): Jurnal Media Teknologi
Publisher : Fakultas Teknik UNIGAL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25157/jmt.v9i2.2947

Abstract

Analisis Perbandingan Biaya Rencana Pelaksanaan Antara Upah Harian dan Borongan Terhadap Rencana Anggaran Biaya, bertujuan Mengetahui biaya terhemat dan efisien pekerjaan Pemeliharaan Rutin Irigasi antara Rencana Anggaran Pelaksana menggunakan metode Upah Borongan atau Rencana Anggaran Pelaksana menggunakan metode Upah Harian. Dan Mengetahui faktor apa saja dalam memilih aspek- aspek di dalam pekerjaan Pemeliharaan Rutin Irigasi untuk biaya yang lebih effisien. Metode yang digunakan dalam penelitian ini adalah dengan cara melakukan observasi secara langsung ke lapangan untuk mendapatkan data proyek dan dokumentasi pelaksanaan pekerjaan. Kemudian meminta data teknis dan RAB proyek kepada Dinas Instansi dan menganalisis perbandingan biaya Rencana Anggaran Pelaksanaan pekerjaan. Hasil analisis didapat Perhitungan Pekerjaan Pemeliharan Jaringan Irigasi DI. Bantarheulang Wilayah Rawa Onom Saluran Sekunder Pulo Majeti (BPM.23). Rencana Anggaran Pelaksanaan Metode Upah Borongan, lebih ekonomis 15,17% atau sebesar Rp. 16.119.000,- dibanding dengan Rencana Anggaran Pelaksanaan Metode Upah Harian. Dan Penyelenggara kegiatan dalam hal ini Satker Operasi dan Pemeliharaan SDA Citanduy, lebih effisien 18% dari total Rencana Anggaran Biaya atau sebesar Rp. 20.290.000,- jika menggunakan Rencana Anggaran Pelaksanaan Metode Upah Borongan. Faktor yang paling menentukan yaitu upah tenaga kerja sehingga bisa menghemat biaya yang sudah direncanakan
A Analisis Perbandingan Biaya Dan Waktu Antara Bekisting Kayu Multiplek Dengan Bekisting Bondek Untuk Plat Lantai: Perbandingan Biaya dan waktu Pekerjaan Bekisting Atep Maskur; Irvanul Fuadi; Edi Sukmara
Jurnal Ilmiah Teknologi Infomasi Terapan (JITTER) Vol. 9 No. 2 (2023)
Publisher : Universitas Widyatama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33197/jitter.vol9.iss2.2023.1023

Abstract

Formwork is a temporary mold that has an important role when casting concrete so that the concrete mold results are as planned. Formwork planning certainly cannot be separated from the role of cost and time. There are various types of formwork that are commonly used in the field, but not everyone knows the price comparison between the types of formwork, while the purpose of this study was to compare costs and time between multiflek wood formwork and bondek formwork for floor slabs in Ciamis Regency. The research method used in this study is a comparative study, namely comparing the unit price of work using different materials in the same work, namely the work of floor plate formwork and roofing between using multiple flex wood materials and galvanized iron (bonded) materials for later analysis and analysis. looking for a more economical and efficient value. Based on research conducted, the budget required for the work of making floor slab formwork using multiplexes in Al-Badriyah Mosque Renovation is Rp. 116,467,904.00 with the price for 1 m² is Rp. 371,390.00. As for the bondek formwork work, it is Rp. 96,494,197.33 with a price for 1 m² of Rp. 307,698.33. Based on the price comparison, there is a difference of Rp. 19,973,706.00, so the price of bondek formwork in Ciamis Regency is cheaper than multiplex formwork. The time needed to complete the formwork installation using multiplex is 34 working days, while the time needed to complete the formwork installation using bondek is 9 working days. Based on the comparison of time, slab formwork using bondek in Ciamis district is 25 days faster than multiplex formwork. In terms of cost, bondek formwork is about 17% more efficient than multiplex formwork. And in terms of time bondek formwork is more efficient by 74% compared to multiplex formwork.
Pengaruh Penggunaan Precedence Diagram Method (Pdm) Terhadap Waktu Dan Biaya Pada Proyek Jalan Wahyu Sumarno; Ihsan Sanjaya; Atep Maskur
Mestro Vol 4 No 03 (2023): Peran Energi Baru Terbarukan dan Robotik di Era Industri 4.0
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Cirebon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47685/mestro.v4i01.393

Abstract

Pembangunan di Indonesia semakin pesat. Berbagai proyek berskala besar dikerjakan untuk memenuhi kebutuhan masyarakat yang semakin kompleks. Hal tersebut memicu perkembangan industri konstruksi di Indonesia. Pembangunan tersebut salah satu nya peningkatan jalan. Perlu suatu pengelolaan yang serius, mengingat semakin besarnya ukuran proyek dan semakin kompleksnya ketergantungan antara satu bagian pekerjaan dengan pekerjaan yang lain dalam satu proyek untuk mencapai hasil yang diinginkan. Pada proyek peningkatan jalan cibadak-gardu ini direncanakan durasi pengerjaan selesai dalam waktu 150 hari kalender. Berdasarkan dari penjadwalan proyek / time schedule diuraikan ke dalam diagram network untuk menentukan percepatan waktu / durasi pelaksanaan dengan alternatif menambah jam kerja (lembur) kemudian di hitung optimasi biaya yang di hasilkan, terjadi penambahan waktu 16 hari kalender dengan nilai proyek sebesar Rp.14.526.778.000,00. Tujuan dari penelitian ini adalah untuk mengetahui pengendalian waktu dan biaya pekerjaan Peningkatan Jalan Cibadak – Gardu Kecamatan Jatinagara-Kecamatan Kawali Kabupaten Ciamis dengan menggunakan Metode Precedence Diagram Method (PDM), sehingga membantu kontraktor dalam penjadwalan proyek supaya proyek dapat selesai tepat pada waktunya.. Hasil penelitian yang dilakukan dengan penjadwalan proyek Precedence Diagram Method (PDM) dan percepatan durasi dengan crashing didapatkan waktu percepatan proyek selama 18 hari kalender dan nilai optimasi biaya pelaksanaan sebesar Rp. 10.804.638. Sehingga waktu yang dibutuhkan setelah dilakukan penjadwalan dan percepatan menjadi 148 hari kalender atau 2 hari lebih cepat dari existing dengan penambahan jam kerja (lembur).
ANALISIS PERENCANAAN DAN PENJADWALAN PROYEK PEMBANGUNAN RUMAH SEDERHANA MENGGUNAKAN NETWORK PLANNING DI DESA SUKAHURIP KECAMATAN CISAGA KABUPATEN CIAMIS Gini Hartati; Dedi Suryadi; Atep Maskur
Jurnal Media Teknologi Vol. 10 No. 01 (2023): Jurnal Media Teknologi
Publisher : Fakultas Teknik UNIGAL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25157/jmt.v10i01.3322

Abstract

Perencanaan dalam waktu proyek adalah salah satu cara untuk mengendalikan pelaksanaan pekerjaan yang merupakan bagian esensi dari setiap aktifitas proyek. Kegagalan proyek akan semakin besar tanpa manajemen waktu yang optimal. Pada setiap pelaksanaan proyek perlu adanya penanganan manajemen penjadwalan proyek yang baik. Suatu proyek dikatakan baik jika penyelesaian proyek tersebut efisien ditinjau dari segi waktu, maka diperlukan cara agar penyelesaian struktur rumah dapat dikerjakan dengan cepat untuk memenuhi kebutuhan masyarakat. Tujuan dilakukan penelitiaan ini adalah untuk membuktikan dan menganalisis apakah network planning dapat digunakan pada proyek pembangunan rumah rumah sederhana. Dan untuk mengetahui metode jaringan kerja sebagai alat pengendali dan pengawasan dalam pelaksanaan proyek pembangunan rumah rumah sederhana di Desa Sukahurip Kecamatan Cisaga Kabupaten Ciamis Dari hasil perhitungan perencana dengan Network Planing PERT dan CPM di Kabupaten Ciamis , di temukan adanya perbedaan waktu dan biaya sebelum dan sesudah menggunakan metode Network Planing yang awalnya proyek membutuhkan waktu 133 hari dengan total biaya Rp. 345.300.000,- menjadi 113,01 hari dengan Total biaya Rp. 323.300.000.
Analisis Tingkat Kerusakan Rangka Atap Baja Ringan (Studi Kasus SD Muhammadiyah Bogor, Playen, Gunung Kidul, D.I. Yogyakarta) Atep Maskur; Setya Winarno
Jurnal Ilmiah Teknologi Infomasi Terapan (JITTER) Vol. 9 No. 3 (2023)
Publisher : Universitas Widyatama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33197/jitter.vol9.iss3.2023.1312

Abstract

The collapse of the lightweight steel roof truss that occurred at SD Muhammadiyah Bogor, Playen District, Gunung Kidul Regency, Special Region of Yogyakarta, occurred on Monday, November 8 2022, the building was built in May 2021 and handed over in August 2021, the estimated roof frame will be installed in September 2021. The building is designated as a Study Room with two floors, the roof frame used is a light steel frame, the roof covering is tiled with tiles from Palentong. The purpose of this study was to identify and assess the level of damage and to determine the percentage of damage to the Roof Frame Structure of SD Muhammadiyah Bogor Playen D.I. Yogyakarta which uses a Light Steel Frame. In this study the authors collected data by observing directly to the location of the incident, by documenting the events that occurred, and recording some of the data needed to be used as field data. The results showed that: Roof and roof covering elements using Palentong tiles with partially damaged batten or batten frames in the rear and middle positions of the building above the classrooms, Elements of the battom chord and top chord are partially detached, Elements of the web connecting the battom chord and top chord in the upper part damaged apart from the connection, lisplank elements from GRC materials on the damaged parts were detached, plapond elements from gypsum fell on the inside of the class room with plapond frames from hollo, and roof elements with palentong tiled roof coverings on the back of the building detached from the roof frame, and parts loose link. As for the ranking or percentage of damage to the elements of the Light Steel Roof Frame Structure, the percentage shows a damage value of 83.65%, the results obtained from the calculation of the damage to the roof of the Muhammadiyah Bogor Elementary School Building entered the level of damage ? 65% categorized as Total Damage