PENGECEKAN KELAYAKAN BANGUNAN GEDUNG SMA NEGERI 1 KOTA KEDIRI YANG DIGUNAKAN UNTUK AKTIFITAS BELAJAR Agata Iwan Candra; Yosef Cahyo Setianto Poernomo; Ahmad Ridwan; Sigit Winarto; Edy Gardjito; Eko Siswanto
Jurnal Abdi Masyarakat Vol 2, No 2 (2019): Mei 2019
Publisher : Universitas Kadiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jaim.v2i2.371

Abstract

Hammer test merupakan bagian dari pengecekan kelayakan dari sebuah bangunan struktur gedung , jembatan , ataupun bangunan struktur yang berhubungan dengan beton. Pada salah satu bangunan existing Sekolah Menengah Atas Negeri 1 Kediri yang akan dilakukan renovasi dan penambahan lantai terdapat retakan – retakan yang terlihat seperti pada kolom, pelat atap dan tembok. Adanya keretakan tersebut dapat mempengaruhi pengambilan tindakan terkait renovasi bangunan tersebut, apakah harus membongkar total banguna tersebut atau hanya melakukan penambalan pada bagian struktur yang mengalami keretakan. Dari data-data yang diambil dari lapangan dapat disimpulkan bahwa pengecekan kelayakan banguan sekolah menengah atas negeri 1 kota kediri diambil dari kekuatan pelat atap dan balok penyangga pelat dengan menggunakan hammer test, maka didapatlah nilai dari perhitungan, Fc’ rencana pelat senilai 20,75 Mpa atau 250 Kg/cm² dan untuk Fc’ rencana balok senilai Mpa atau 250 Kg/cm² sedangkan hasil yang diperoleh dari lapangan untuk perhitungan pelat senilai 280,23 Kg/cm² yang berarti lebih besar dari nilai rencana, dan untuk perhitungan balok hanya mencapai 234,37 Kg/cm² yang berarti di bawah nilai yang di rencanakan yaitu 250 Kg/cm²
STUDI ANALISA DAMPAK LALU LINTAS DIKAWASAN PEMBANGUNAN GEDUNG OLAH RAGA KABUPATEN TRENGGALEK Ela Mahudi; Yosef Cahyo Setianto Poernomo; Ahmad Ridwan
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 2 (2019): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (206.508 KB) | DOI: 10.30737/jurmateks.v2i2.512

Abstract

The construction of the Sports Building will lead to an increase in traffic volume. The study aims to find out the Average Daily Traffic, predicting the degree of saturation in the sections and intersections around the construction at peak hours in 2024 or after 5 years of the study is carried out. They are using data collection methods and transportation modeling methods as well as micro approaches for the analysis of transportation system performance. The results of the Average Daily Traffic Survey (LHR) are 0.50 with a service level of C. In the prediction in 2024, if there is no development in the area, the degree of saturation will be 0.70 with service level C. In 2024, if there is an increase in traffic flow. This happens because, based on the analysis, it is obtained generation of 71 pcs / hour and a pull of 129 pcs / hour. Average Daily Traffic (LHR) and Performance of roads and intersections around the Sports Hall in 2024 are still normal based on the degree of saturation of 0.70 and the level of service C. Suggestions and recommendations need to regulate vehicle circulation and installation of warning lights around the Sports Building.Pembangunan Gedung Olahraga akan menyebabkan peningkatan volume lalu lintas. Penelitian bertujuan untuk mengetahui Rata-rata Lalu Lintas Harian, memprediksi derajat kejenuhan pada ruas-ruas dan persimpangan di sekitar konstruksi pada jam puncak tahun 2024 atau setelah 5 tahun penelitian dilakukan. Mereka menggunakan metode pengumpulan data dan metode pemodelan transportasi serta pendekatan mikro untuk analisis kinerja sistem transportasi. Hasil Average Daily Traffic Survey (LHR) adalah 0,50 dengan service level C.Pada prediksi tahun 2024 jika tidak ada pembangunan di wilayah tersebut maka derajat kejenuhannya akan menjadi 0,70 dengan service level C. Pada tahun 2024, jika terjadi peningkatan arus lalu lintas. Hal ini terjadi karena berdasarkan analisis diperoleh pembangkitan 71 pcs / jam dan tarikan 129 pcs / jam. Rata-rata Lalu Lintas Harian (LHR) dan Kinerja Jalan dan Persimpangan di sekitar Gedung Olah Raga pada tahun 2024 masih normal berdasarkan derajat kejenuhan 0,70 dan tingkat pelayanan C. Saran dan rekomendasi perlu pengaturan sirkulasi kendaraan dan pemasangan lampu peringatan di sekitar Gedung Olahraga.
STUDI ANALISA PERENCANAAN PERKERASAN LENTUR DAN RENCANA ANGGARAN BIAYA PADA PROYEK JALAN RUAS JALAN TEMBELENGAN SAMPAI DURJAN KABUPATEN SAMPANG Mishbahul Aziz; Sigit Winarto; Yosef Cahyo Setianto Poernomo; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 2 (2019): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (281.66 KB) | DOI: 10.30737/jurmateks.v2i2.515

Abstract

There was a build-up of lumps of sand on the road, precisely Tambelang-Durjan. This build-up of sand chunks occurs because many of the piled sand hauling trucks that pass on the road is obstructed because the road section has been damaged (potholes) and is unfit for passage, resulting in obstruction of traffic flow. In addition, the width of the section is not in accordance with the technical requirements of the 2011 Government Regulation. Therefore, it requires a flexible pavement re-planning and a Cost Budget Plan for land transportation lines, so that motorist access is comfortable. Planning flexible pavement using Laston with a planning age of 10 years obtained flexible pavement thickness, namely 4 cm thick AC-WC, 6 cm thick AC-BC, and 40 cm of Upper Foundation Layers (LPA) with the estimated size of the Budget Plan The cost of the flexible pavement construction of Tambelang- Durjan of Sampang Regency with a length of 1,145 km in the amount of Rp 5,744,585,463.00Terjadi penumbukan bongkahan pasir urug tepatnya di ruas jalan Tambelangan-Durjan. Penumpukan bongkahan pasir ini terjadi karena banyak truk pengangkut bongkahan pasir urug tersebut yang melintas pada jalan itu terhambat karena ruas jalan mengalami kerusakan (berlubang) dan tidak layak dilalui, sehingga  yang mengakibatkan terhambatnya arus lalu lintas. Selain itu lebar ruas tidak sesuai dengan persyaratan teknis Peraturan Pemerintah tahun 2011. Oleh karena itu, memerlukan perencanaan ulang perkerasan lentur dan Rencana Anggaran Biaya untuk jalur transportasi darat supaya akses pengendara nyaman. Perencanaan perkerasan lentur menggunakan Laston dengan umur rencana 10 tahun didapatkan tebal perkerasan lentur yaitu AC-WC setebal 4 cm, AC-BC setebal 6 cm dan Lapis Pondasi Atas (LPA) setebal 40 cm dengan besar perkiraan Rencana Anggaran Biaya pembangunan perkerasan lentur ruas Tambelangan-Durjan Kabupaten Sampang sepanjang 1,145 km sebesar Rp 5.744.585.463,00.
ANALISA TEBAL PERKERASAN LENTUR PADA RENCANA PENINGKATAN JALAN RUAS LEGUNDI – PERTIGAAN BUNDER Fandra Andriansyah P; Sigit Winarto; Yosef Cahyo Setianto Poernomo; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 2 (2019): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (252.462 KB) | DOI: 10.30737/jurmateks.v2i2.541

Abstract

The final project is Analysis of Flexible Pavement Thickness in the Plan for Improvement of Legundi Road Section - Bunder KM.5 + 700 to 13 + 700 STA. 0 + 000 to 4 + 000which comprised the road geometrics, flexible pavement depth completed with the budgeting. A topographic map was employed to make a geometric design. Traffic data of 2018, rainfall data of 2018, and California Bearing Ratio (CBR) data were needed to design the flexible pavement depth. The basic itemized cost of wages, materials, tools, and work itemized cost from General Work BinaMarga of East Java Province Division IV (Surabaya, Gresik, Sidoarjo, Mojokerto, Jombang) were needed to find out the budget. Chosen alternative flexible pavement depth of 10 cm asphalt-concrete MS 744 surface, 20 cm Cement Tread Base (CTB) base, and 50 cm sand-aggregate class A (CBR 70) sub-base.The calculations result in PI 01 Full-Circle bend and PI 02 Full-Circle; at IDR 14.745.341.000.Laporan Akhir ini adalah Analisa Tebal Perkerasan Lentur Pada Rencana Peningkatan Jalan Ruas Legundi – Pertigaan Bunder KM.5+700 s/d 13+700 STA. 0+000 s/d 4+000 yang bertujuan untuk menghitung tebal perkerasan lentur jalan, menghitung geometric jalan dan rencana anggaran biaya proyek. Peta topografi sebagai dasar untuk merencanakan geometric jalan. Data lalu lintas tahun 2018, data curah hujan tahun 2018, data California Bearing Ratio (CBR) untuk merencanakan tebal perkerasan lenturjalan. Data Harga Satuan Dasar upah, bahan, dan alat serta Harga Satuan Pekerjaan dari Departemen Pekerjaan Umum Bina Marga Jatim kelompok IV (Surabaya, Gresik, Sidoarjo, Mojokerto, Jombang) digunakan untuk perhitungan Rencana Anggaran Biaya. Berdasarkan perhitungan didapatkan tebal perkerasan lentur alternative terpilih untuk surface 10cm laston MS 744, base 20 cm Cement Tread Base (CTB) ,serta sub base 50 cm Sirtukelas A (CBR 70). Bentuktikungan PI 01 Full-Circle, dan PI 02 Full-Circle. Biaya yang diperlukanadalahsebesarRp 14.745.341.000,-.
PELAKSANAAN MANAJEMEN KONSTRUKSI PADA PROYEK PEMBANGUNAN BANK SINAR MAS KEDIRI Yosef Cahyo Setianto Poernomo; Ahmad Ridwan; Zulkifli Lubis; April Gunarto; Sigit Winarto
U Karst Vol 2, No 1 (2018): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (421.668 KB) | DOI: 10.30737/ukarst.v2i1.101

Abstract

 Bank Sinar Mas Kediri project is a development project that uses a unique implementation method, namely the Top Down method, that is, the construction starts from the floor plate as a new foundation and then continues with the construction of the ground floor 1,2,3. The use of the Top Down method requires a column called King Post which is a column of steel profiles as a temporary column. The hotel is built on a land area of 3248 m2 with a building height of + 123,600 m, - 9,800 m and uses 118 boredpile foundations. This project uses the Fixed Price Lumpsum contract system. This research aims to identify the cause of the delay in the completion of the Sinar Mas Kediri development project. The results of the analysis show that the delay in the completion of the project is due to the delay in completion of the excavation work. The delay was due to the lack of procurement of water pumping or drying equipment, weather or climate and the lack of excavation and limited number of heavy equipment used. Keywords: Delays, Time, Construction.  Proyek Bank Sinar Mas Kediri merupakan proyek pembangunan yang menggunakan metode pelaksanaan yang unik yaitu metode Top Down yaitu pembangunan dimulai dari pelat lantai sebagai tumpuan baru kemudian dilanjutkan dengan pembangunan lantai dasar 1,2,3. Penggunaan metode Top Down memerlukan kolom yang disebut King Post yang merupakan kolom dari profil baja sebagai kolom sementara. Hotel tersebut dibangun di atas tanah seluas 3248 m2 dengan tinggi bangunan + 123,600 m, - 9,800 m dan menggunakan 118 pondasi boredpile. Proyek ini menggunkan sistem kontrak Lumpsum Fixed Price.Penelitian ini bertujuan untuk mengidentifikasi penyebab keterlambatan penyelesaian proyek pembangunan Bank Sinar Mas Kediri. Hasil analisis menunjukkan bahwa Keterlambatan penyelesaian proyek disebabkan keterlambatan penyelesaian pekerjaan penggalian tanah. Keterlambatan tersebut dikarenakan kurangnya pengadaan akan alat pemompa air atau alat pengeringan, cuaca atau iklim dan tidak adanya jumlah tenaga kerja penggalian dan terbatasnya jumlah alat berat yang digunakan. Kata Kunci : Keterlambatan, Waktu, Konstruksi Kata Kunci : keterlambatan, waktu, konstruksi.
PENELITIAN PENAMBAHAN BAHAN SERBUK DOLOMITE DAN PASIR BRANTAS PADA CAMPURAN ASPAL BETON Faisal Abdul Yusuf; Ahmad Ridwan; Yosef Cahyo Setianto Poernomo
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 2 (2019): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (260.649 KB) | DOI: 10.30737/jurmateks.v2i2.513

Abstract

Asphalt Concrete (Hotmix) is a mixture of coarse aggregate, fine aggregate, and filler (filler) with asphalt binder in high-temperature conditions (heat) with a composition that is examined and regulated by technical specifications. In this research, concrete asphalt mixture was added with dolomite powder as a  mixture in filler to be an alternative material for portland cement filler mixture to minimize the price of portal and cement, which is increasingly expensive, and brantas sand as fine aggregate to study and determine the effect of dolomite powder and brantas sand in the mixture asphalt concrete with the addition of levels of 5%, 10%, and 15%. From the results of the study obtained the value of adding dolomite powder with levels of 5%, 10%, 15% at VIM values of 11.99%, 15.28%, 10.29 , VMA value of 26.30%, 29.05%,  24.88%,  VFB  value  of  54.49%,  48.33%,  58.81%,  stability  value  of  3402.503  kg, 3294.030 kg, 1958.946 kg, MQ value 733,8130 kg, 456,1891 kg, 471,9089 kg and from the testing chart the optimum content is at levels 5.5% to 8% and the maximum level is at 5% level.Aspal  Beton  (Hotmix)  adalah  campuran  agregat  kasar,  agregat  halus,  dan  bahan pengisi (Filler) dengan bahan pengikat aspal dalam kondisi suhu tinggi (panas) dengan komposisi yang diteliti dan diatur oleh spesifikasi teknis. Pada penelitian ini, campuran aspal beton diberi bahan tambahan serbuk dolomite sebagai campuran pada filler agar menjadi bahan alternativ campuran filler semen portaland untuk meminimalisir harga semen portaland yang  semakin  mahal  dan  pasir  brantas  sebagai  agregat  halus  untuk  mempelajari  dan mengetahui pengaruh serbuk dolomit dan pasir brantas pada campuran aspal beton dengan penambahan kadar 5%, 10%, dan 15%.dari hasil penelitian didapat nilai penambahan serbuk dolomite dengan kadar  5%, 10%, 15% pada nilai VIM sebesar 11,99%, 15,28%, 10,29, nilai VMA 26,30%, 29,05%, 24,88%, nilai VFB 54,49%, 48,33%, 58,81%, nilai stabilitas 3402,503 kg, 3294,030 kg, 1958,946 kg, nilai MQ 733,8130 kg, 456,1891 kg, 471,9089 kg dan dari grafik pengujian kadar optimum pada kadar 5,5% sampai 8% dan kadar maximum pada kadar 5%.
ANALISIS KINERJA LALU LINTAS DI JALAN SEKITAR HYPERMART JL.VETERAN,PENANGGUNGAN, KLOJEN, MALANG Savira Anggraeni; Yosef Cahyo Setianto Poernomo; Sigit Winarto
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 2 (2019): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (228.798 KB) | DOI: 10.30737/jurmateks.v2i2.526

Abstract

This research was conducted to determine the peak traffic volume, road capacity, degree of saturation, analyze traffic performance, find out the prediction of the next 5 years, and to evaluate the traffic performance around the Hypermart shopping center that occurs in the real situation. The method used is by library research, looking for references from previous research and direct observation. The peak traffic volume is 1469 SMP / hour for the first location and 1104.4 SMP / hour for the second location. The capacity of the road section is 4699.73 SMP / hour. For the analysis of the degree of saturation of the first location of 0.31 SMP / hour and 0.23 SMP / hour in the second location. For the next 5 years prediction in that region, it is predicted to increase by 8.93% so that the volume of vehicles will rise to 2124.76 SMP / hour, and for the degree of saturation of 0.45, which means that the traffic service in this region is included in class C in 2024.Penelitian ini dilaksanakan untuk mengetahui volume puncak lalu lintas, kapasitas jalan,derajat kejenuhan,  menganalisis kinerja lalu lintas, mengetahui prediksi 5 tahun ke depan serta untuk mengevaluasi kinerja lalu lintas di sekitar pusat perbelanjaan Hypermart yang terjadi disituasi rill. Metode yang digunakan adalah dengan cara studi pustaka, mencari referensi dari penelitian terdahulu serta melakukan observasi langsung. Volume puncak lalu lintas didapatkan nilai 1469 smp/jam untuk lokasi pertama dan 1104.4 smp/jam untuk lokasi kedua.Kapasitas ruas jalan sebesar 4699.73 smp/jam.Untuk analisa derajat kejenuhan lokasi pertama sebesar 0.31 smp/jam dan 0.23 smp/jam pada lokasi kedua.Untuk prediksi 5 tahun kedepan pada wilayah tersebut diprediksi akan mengalami kenaikan sebesar 8.93% sehingga volume kendaraan akan naik menjadi 2124.76 smp/jam, dan untuk nilai derajat kejenuhan sebesar 0.45 yang artinya pelayanan lalu lintas wilayah ini termasuk ke dalam kelas C pada tahun 2024.
ANALISA ANGGARAN BIAYA DANPENJADWALANPROYEK PERBAIKAN TANGGUL KALI BAKUNGDESA CENGKOK KECAMATAN TAROKAN KABUPATEN KEDIRI Johan Harmawanto; Yosef Cahyo Setianto Poernomo; Sigit Winarto
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 2 (2019): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (212.658 KB) | DOI: 10.30737/jurmateks.v2i2.514

Abstract

Bakung River is a medium to supply water demand for irrigation in Cengkok Village TarokanSubdistrict Kediri Regency. Unfortunately, the soil embankment often slides to disturb the irrigation. The writer made the cost estimate, scheduling, network, and undertaking method of improving the Bakung River embankment with river stone. The data obtained from the Department of Water Public Work (DWPW) were of technical drawings, specifications, the unit price of material, and construction work of Kediri Regency 2019. The result was analyzed to find out the unit price analysis of construction work; hence the cost analysis was made. The schedule was derived from making the cost estimate by calculating the work quantity and calculating the duration. The results were processed through MS Excel to make a bar chart, S Curve, and Precedence Diagram Method (PDM) as the network. The calculations result in IDR 914.486.100,00 and 91 workdays.Kali Bakung merupakan sarana  untuk memenuhi kebutuhan air irigasi di Desa Cengkok Kecamatan Tarokan Kabupaten Kediri. Akan tetapi keadaan tanggul Kali Bakung mengalami kerusakan dan penyediaan air irigasi menjadi terganggu. Penulis membuat analisa anggaran biaya, penjadwalan, jaringan dan metode pelaksanaan untuk perbaikan tanggul Kali Bakung dengan pasangan batu kali. Data yang diperoleh dari Dinas Pekerjaan Umum Sumber Daya Air adalah gambar teknis, spesifikasi, harga satuan upah dan bahan Kabupaten Kediri tahun 2019. Hasilnya dianalisis untuk mengetahui analisa harga satuan pekerjaan, maka dibuat rencana anggaran biaya. Jadwal berasal dari rencana anggaran biaya dengan menghitung bobot pekerjaan dan menghitung durasi. Hasilnya diproses dengan MS Excel untuk membuat bar chart, kurva S, dan Precedence Diagram Method (PDM) sebagai jaringan. Hasil perhitungan didapatkan Rencana Anggaran Biaya untuk proyek tersebut adalah Rp. 914.486.100,00 dan durasi pelaksanaannya 91 hari.
PEMANFAATAN LIMBAH GENTENG SEBAGAI CAMPURAN SEMEN DAN PENAMBAHAN ZAT ADDITIV MASTER EASE TERHADAP BETON K-200 Jefrianto Jefrianto; Sigit Winarto; Yosef Cahyo Setianto Poernomo
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 2 (2019): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (247.487 KB) | DOI: 10.30737/jurmateks.v2i2.527

Abstract

Concrete needs are increasingly increasing, so the need for material is also increasing. From this research, it is hoped to find innovations to reduce the amount of cement used by combining tile waste and additives in the manufacture of concrete. From this compressive strength research, it can be concluded that the concrete that has the highest average compressive strength is the addition of 5% tile waste from the amount of cement and 5% additives of the amount of water with a compressive strength value of 212.44 kg / cm², and which has the lowest compressive strength value is concrete with the addition of tile waste 15% of the amount of cement and additives 5% of the amount of water with a compressive strength value of 191.11 kg / cm². The most effective absorption and the specific gravity of the test were obtained from concrete combined with 10% Tile Waste from cement and 5% additive with an average water value of only 0.1589 liters and a specific gravity of only 2400.65 kg / m3.Kebutuhan beton semakin lama semakin meningkat, sehingga kebutuhan akan bahan penyusunya juga kian meningkat. dari penelitian ini di harapkan dapat menemukan inovasi untuk mengurangi jumlah pemakaian semen dengan mengkombinasikan limbah genteng dan zat additive pada pembuatan beton.Dari penelitian kuat tekan ini dapat disimpulkan beton yang memiliki nilai kuat tekan rata-rata paling tinggi di miliki beton dengan penambahan Limbah Genteng 5% dari semen dan zat additive 5% dari air dengan nilai kuat tekan sebesar 212,44 Kg/cm²,dan yang memiliki nilai kuat tekan paling rendah di miliki beton dengan penambahan Limbah Genteng 15% dari semen dan zat additive 5% dari air dengan nilai kuat tekan 191,11 Kg/cm². Daya absorbsi dan berat jenis paling efektif dari pengujian didapat dari beton berkombinasi Limbah Genteng 10% dari semen dan zat additive 5% dengan jumlah nilai air rata – rata hanya sejumlah 0,1589 liter dan berat jenis hanya sebesar 2400,65 kg/m3.
PERENCANAAN ALTERNATIF GEOMETRIK DAN METODE PELAKSANAAN RUAS JALAN NGRAHO – NGAWI STA.14+500 - STA.19+500 Agung Gagah Harmawanto; Yosef Cahyo Setianto Poernomo; Sigit Winarto
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 2 (2019): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (271.21 KB) | DOI: 10.30737/jurmateks.v2i2.510

Abstract

Ngraho - Ngawi Sta. 14 + 500 – Sta. 19 + 500 highway is a collector connecting Bojonegoro to Ngawi Due to high traffic density, a road geometric Development is in need. The objective of this final project is to plan a good alternative geometric design-safe, comfortable, and easy to access. The required data were of topographic map and the road geometric design was based on the “Tata Cara Perencanaan Geometrik Jalan Antar Kota” General Works Standart No. 038/TBM/1997. The calculations result in Class 2 – lane collector road with one lane of 3 m wide having 8 turns, twists PI1 Spiral-Spiral, PI2 Spiral-Circle-Spiral, PI3 Spiral-Circle-Spiral, PI4 Spiral-Circle-Spiral, PI5 Spiral-Circle-Spiral, PI6 Spiral-Circle-Spiral, PI7 Spiral-Circle-Spiral, and turn PI8 Spiral-Spiral shape PPV PPV 1 concave and 2 convex, concave 3 PPV.Jalan provinsi ruas Ngraho – Ngawi Sta. 14+500 – Sta. 19+500 adalah jalan kolektor yang menghubungkan kota Bojonegoro - Ngawi. Karena lalu lintasnya padat, maka perlu diadakan peningkatan geometrik jalan.  Dalam laporan akhir ini penulis membuat perencanaan alternatif desain geometrik jalan yang baik-aman,nyaman, dan mudah diakses oleh pengguna jalan. Data yang digunakan adalah peta topografi dan perencanaan desain geometrik jalan berpedoman oleh “Tata Cara Perencanaan Geometrik Jalan Antar Kota” Standar Bina Marga No.038/TBM/1997. Dari perhitungan diperoleh hasil sebagai berikut: kelas jalan kolektor dengan 2 lajur 1 jalur dan memiliki lebar 3 m, 8 tikungan, tikungan PI1Spiral-Spiral, PI2 Spiral-Circle-Spiral, PI3 Spiral-Circle-Spiral, PI4 Spiral-Circle-Spiral, PI5 Spiral-Circle-Spiral, PI6 Spiral-Circle-Spiral, PI7 Spiral-Circle-Spiral,dan tikunganPI8 Spiral-Spiralbentuk PPV 1 cekung dan PPV 2 cembung, PPV 3 cekung.