Claim Missing Document
Check
Articles

Found 3 Documents
Search

Studi Penyebab Keterlambatan Proyek Reparasi AHTS 65,5 M Lisa Novianty; Naufal Abdurrahman Prasetyo; Sapto Wiratno Satoto; Nurman Pamungkas; Hendra Saputra
ABEC Indonesia Vol. 10 (2022): 10th Applied Business and Engineering Conference
Publisher : Politeknik Caltex Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Ship repair involves repairing ship parts that are damaged and do not comply with class eligibilityrequirements. The completion of ship repair projects in shipyards often faces obstacles that cause delays in thecompletion of the project. The purpose of this research is to identify the factors causing delay in the repair ofAHTS 65.5 meters ship using the FTA method. It is expected that if the cause of the delay in the ship repairprocess is known, it will be used as a benchmark for predicting delays in future repairs. This research uses FaultTree Analysis (FTA) technique, which is an analytical method for identifying failures in a system. There are twotop events based on the FTA analysis, namely piping work with 13 basic events and engine room work with 14basic events. There is one basic event with a high probability value in piping work, namely the purchase ofimported materials. While the engine room work produces one basic event with a high probability value, namelythe purchase of imported materials. The purchase of imported materials are the predominant causes of delays inship repair projects, so mitigation measures should be taken to prevent future delays.
Estimasi Durasi Serta Pekerjaan Kritis Pada Pembangunan Block 1 Kapal ASD Tug 35 M Oktaviani Kendri; Naufal Abdurrahman Prasetyo; Hendra Saputra; Mega Gemala; Mufti Fathonah Muvariz
ABEC Indonesia Vol. 10 (2022): 10th Applied Business and Engineering Conference
Publisher : Politeknik Caltex Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

A schedule is crucial to the success of a project so that it is completed within the specifiedtimeframe. Construction of a block on a tugboat is one of the projects used as a case study. The aim of timeestimation is to determine the length of time required to complete a block with the stages of work involved. Inorder to ensure the work process runs on a schedule, a time estimation is done before the work is performed.This data is processed via a computer program. Microsoft Project is a familiar application used in projectmanagement or to assist in the processing of a project. The purpose of this study is to estimate the constructiontime of Block 1 and the work in the critical path on the 35-meter ASD tug ship. In this study, researchersobserve and participate in the construction of a ship block using the observation method. The results obtainedfrom this study are the estimated construction time of one ship block which is built in stages from marking,cutting, fitting, quality assurance, welding and grinding, to the final inspection by the Quality Controldepartment.
Design and Fabrication of 6 Meter Fiberglass Boat for Coastal Water Tourism in Batam Hendra Saputra; Danang Cahyagi; Veryawan Nanda Perkasa; Dedi Purnama; Oxa Nurmannsyah; Rangga Saputra; Regita Ferari; Faaza Ibnu Al Fauzy; Muhammad Fadillah
International Journal of Marine Engineering Innovation and Research Vol 9, No 2 (2024)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j25481479.v9i2.20342

Abstract

As an area with geographical conditions consisting of many islands, marine tourism in Batam has become a special attraction which has been developed through hotel investment, and coastal water tourism and travel-related services. Even though the demand is quite high, the availability of tourism boats to support coastal water tourism has low participation of the domestic industry. Therefore, this study aims to develop a tourism boat prototype designed and fabricated for coastal water tourism and travel-related services in Batam. This study began by studying the characteristics of coastal water, characteristics of tourism needs, design and development, and fabrication activities. Fiberglass is the material in shipbuilding because of the ease of the manufacturing process, and produces less waste and emissions. Based on the study results, it was found that the tourism boat needed is a 5 person capacity tourism boat with a length of 6 meters which can require 1 x 45 HP of power to reach a speed of 25 knots.As an area with geographical conditions consisting of many islands, marine tourism in Batam has become a special attraction which has been developed through hotel investment, and coastal water tourism and travel-related services. Even though the demand is quite high, the availability of tourism boats to support coastal water tourism has low participation of the domestic industry. Therefore, this study aims to develop a tourism boat prototype designed and fabricated for coastal water tourism and travel-related services in Batam. This study began by studying the characteristics of coastal water, characteristics of tourism needs, design and development, and fabrication activities. Fiberglass is the material in shipbuilding because of the ease of the manufacturing process, and produces less waste and emissions. Based on the study results, it was found that the tourism boat needed is a 5 person capacity tourism boat with a length of 6 meters which can require 1 x 45 HP of power to reach a speed of 25 knots.