cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota medan,
Sumatera utara
INDONESIA
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING
Published by Universitas Medan Area
ISSN : 25496328     EISSN : 25496336     DOI : -
Core Subject : Engineering,
JIME (Journal of Industrial and Manufacturing Engineering) is a journal of scientific work in the Industrial Engineering Study Program, Faculty of Engineering, Medan Area University which presents research results in the fields of Manufacturing, Ergonomics, and Industrial Management. The accepted journal is expected to be related to increasing productivity and current issue
Arjuna Subject : -
Articles 12 Documents
Search results for , issue "Vol 2, No 2 (2018): EDISI NOVEMBER" : 12 Documents clear
Analisa Jaringan Kerja dengan Metode CPM pada Proyek Pembangunan Gedung Balai Diklat BPK RI Perwakilan Provinsi Sumatera Utara di Medan Hermanto, Hermanto; Mustafa, Kamil; Banjarnahor, Banjarnahor
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 2, No 2 (2018): EDISI NOVEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1118.794 KB) | DOI: 10.31289/jime.v2i2.2437

Abstract

Research was conducted at the training center bulding projec RI BPK Representative in Medan, North Sumatera, where the purpose of this research is to create a complex framework of activities based on project completion time and human resources available for job creation building structures manager. The framewwork presented in the form of work flow diagram (Network Diagram). From the data obtainned by the completion of the project structure has been estimated tim required to finish the job thus structure with the critical path method (Critical Path Method – CPM). After the calculation of forward and backward calculation is obtained : fastest tim starting and completion activities, no later than beginning and completion of, the lenght of the interval delay /postponement of activities. With the CPM method, completion building structure mnagement training center of RI BPK representative of North Sumatera Province is known than the sum of time critical activities. These critical activities each time interval did not have to delay the implementation of activities. The activities that are on the critical path is the activity with the notation : A-C-E-F-I-L-MQ-U-V-W-X-Y-Z-AA-AC-AD gained 4+9+6+6+1+3+6+1+1+6+1+6+6+1+6+1 = 64 days.
Analisis Dan Evaluasi Jabatan Dengan Metode Point Sistem Untuk Menentukan Upah Pada PT Astra Internasional Auto 2000 Cabang Medan Purba, Maulidani; Singh, Raspal; Banjarnahor, Banjarnahor
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 2, No 2 (2018): EDISI NOVEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (990.287 KB) | DOI: 10.31289/jime.v2i2.2438

Abstract

PT Astra International 2000 Cabang Medan, dalam memperhatikan kesejahteraan adalah dengan analisis jabatan yang dapat menyeimbangkan antara tanggung jawab yang diemban  kepada karyawan dengan upah yang diterima karyawan tersebut. Studi ini bertujuan untuk mendapatkan nilai-nilai relative dari kelompok jabatan pelaksana didepartemen service yang berstatus karyawan tetap. Metode evaluasi jabatan yang dipergunakan untuk menentukan gaji/ upah karyawan adalah dengan metode point sistem (Metode Angka) karena metode ini lebih objektif dibandingkan metode lain yang ada. Dari hasil analisis dan evaluasi jabatan ini penulis memperoleh nilai point terendah yaitu 139 dengan gaji yang disarankan 1.131.606,04 untuk jabatan lubing dan nilai point jabatan yang tertinggi yaitu 334 dengan gaji yang disarankan 2.686.407,34 untuk jabatan mekanik. Berdasarkan nilai point yang diperoleh maka ditentukan besar gaji yang disarankan dengan metode least square atau jumlah kuadrat terkecil dengan persamaan regresi Y= 23311,78 + 7973,34 (X)
Penerapan Sistem Antrian Pada Stasiun Pengisian Bahan Bakar Umum (SPBU) 14.203.1165 PT. Kawasan Industri Medan II Polewangi, Yudi Daeng
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 2, No 2 (2018): EDISI NOVEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (924.774 KB) | DOI: 10.31289/jime.v2i2.2439

Abstract

Sistem antrian adalah suatu himpunan pelanggan, pelayan dan aturan yang mengatur kedatangan para pelanggan. SPBU 14.203.1165 PT. Kawasan Industri Medan II (Persero) merupakan salah satu stasiun pengisian bahan bakar umum Kota Medan yang memiliki 5 jalur pengisian bahan bakar untuk pengendara motor, mobil, truck dll dengan jenis bahan bakar Pertamax, Premium, Pertalite dan Solar. Setiap jalur terdapat bahan bakar solar. Permasalahan yang terjadi di SPBU tersebut yaitu banyaknya jumlah pelanggan (container) yang melakukan pengisian bahan bakar yang mempengaruhi sistem antrian yang ada dan menyebabkan antrian yang panjang. Hasil penelitian yang dilakukan di SPBU 14.203.1165 yaitu tingkat kedatangan pelanggan di SPBU 14.203.1165 selama 10 hari adalah 2.129 kendaraan. Tingkat pelayanan fasilitas di SPBU ini adalah 266 kendaraan per jam. Tingkat kemampuan pelayanan per jalur adalah 53 kendaraan. Model antrian yang paling tepat diterapkan di SPBU 14.203.1165 adalah Multi Channel- Single Phase. Karakteristik dari sistem antriannya adalah populasi tak terbatas, disiplin antrian, pola kedatangan dan panjang antrian tidak terbatas.
Peramalan Tingkat Permintaan LPG PT. Pertamina (Persero) Di Elpiji Tandem Wijono, Joko; Siregar, Ninny; Banjarnahor, M
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 2, No 2 (2018): EDISI NOVEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (958.275 KB) | DOI: 10.31289/jime.v2i2.2434

Abstract

LPG that produced by PT. Pertamina (Persero) unit Pengolahan I Pangkalan Brandan cames from natural gas. LPG usually used by people for industry and home needs. Most of high-end community prefer to consume to fuel oil, outfil legible job decay (durable) bat need big investment(because the storages of LPG or LPG bottle is expensive). Most of LPG consumption for north sumatera consumer supplied by PT. Pertamina (Persero) Unit Pengolahan I Pangkalan Berandan. For maintaining LPG continuity, so demand forecasting is a neccessary for the future. Considering the decline of LPG production, which caused by natural trend linier gas reserver. To predict the demand in the demand in the future, it can count using and Exponential Smoothing forecasting method. Exponential Smoothing forecasting method that used is double Exponential Smoothing forecasting method and then parameter estimate to get the minimum (Mean Square Error).  From the calculation forecasting method, Double Exponential Smoothing forecassting method can give the minimum MSE price with one parameter 0,1 and for Depot Tandem UPMS I Medan in 2010 is79.740,414 kiloliter.Keywords : Eksponential Smoothing Methode , forecasting
Analisis Metode Antrian Terhadap Peningkatan Efisiensi dan Efektifitas Pelayanan Laboratorium Klinik Kesehatan pada PT. Prodia Widyahusada Damayanti, Annatia Kristin; Haniza, Haniza; Siregar, Ninny
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 2, No 2 (2018): EDISI NOVEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1175.406 KB) | DOI: 10.31289/jime.v2i2.2435

Abstract

Public awareness about the importance of a medical examination in the laboratory are increase, the more also increased the number of customers in the Clinical Laboratory Health PT. Prodia Widyahusada The influence of queuing method is needed to provide effective and efficient health laboratory service. Queuing method used in the Clinical Laboratory Health PT. Prodia Widyahusada is a service system with Multiple Channel Single Phase System (3/3/1). Service system at the Health Clinic Laboratorium PT. Prodia Widyahusada more better when there is the addition of a service station from three to four service station service station. After the addition of station, the service becomes more effective and efficient, but the evaluation needs to be sustainable because of the level of public awareness about health will continue to increase and needs to be balanced with increased facilities and befter infrastructure.
Perencanaan Penjualan Dan Persediaan Optimal Di PT. Interyasa Sedaya Medan Surbakti, Emita Sri Ulina; Mustafa, Kamil; Banjarnahor, Maruli
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 2, No 2 (2018): EDISI NOVEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1124.972 KB) | DOI: 10.31289/jime.v2i2.2436

Abstract

Based on development, the enterprise often gets problem in stock of goods, because has not planning for sales and stock of goodsfor the future accuratelly.Method which be used to determine the quantity of sales for the future is “least Square Line Method” because this method is more significance to the result that be hoped and there is also the past data quantitatively. Stock of goods are determined from the quantity of sales for the future with economic order quantity = EOQ.Based on the result of the research that has been done, where the goods that will be are television and refrigerator with the long one month. Increasing of Total sales for TV = 28.7 %.  EOQ of TV = 18 units/ order and is performed 1 (one) time is week. Increasing of Total sales for refrigerator = 32.2 %.  EOQ of refrigerator = 16 units/ order and is performed 1 (one) time is week.
Perencanaan Penjualan Dan Persediaan Optimal Di PT. Interyasa Sedaya Medan Emita Sri Ulina Surbakti; Kamil Mustafa; Maruli Banjarnahor
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 2, No 2 (2018): EDISI NOVEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31289/jime.v2i2.2436

Abstract

Based on development, the enterprise often gets problem in stock of goods, because has not planning for sales and stock of goodsfor the future accuratelly.Method which be used to determine the quantity of sales for the future is “least Square Line Method” because this method is more significance to the result that be hoped and there is also the past data quantitatively. Stock of goods are determined from the quantity of sales for the future with economic order quantity = EOQ.Based on the result of the research that has been done, where the goods that will be are television and refrigerator with the long one month. Increasing of Total sales for TV = 28.7 %.  EOQ of TV = 18 units/ order and is performed 1 (one) time is week. Increasing of Total sales for refrigerator = 32.2 %.  EOQ of refrigerator = 16 units/ order and is performed 1 (one) time is week.
Analisa Jaringan Kerja dengan Metode CPM pada Proyek Pembangunan Gedung Balai Diklat BPK RI Perwakilan Provinsi Sumatera Utara di Medan Hermanto Hermanto; Kamil Mustafa; Banjarnahor Banjarnahor
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 2, No 2 (2018): EDISI NOVEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31289/jime.v2i2.2437

Abstract

Research was conducted at the training center bulding projec RI BPK Representative in Medan, North Sumatera, where the purpose of this research is to create a complex framework of activities based on project completion time and human resources available for job creation building structures manager. The framewwork presented in the form of work flow diagram (Network Diagram). From the data obtainned by the completion of the project structure has been estimated tim required to finish the job thus structure with the critical path method (Critical Path Method – CPM). After the calculation of forward and backward calculation is obtained : fastest tim starting and completion activities, no later than beginning and completion of, the lenght of the interval delay /postponement of activities. With the CPM method, completion building structure mnagement training center of RI BPK representative of North Sumatera Province is known than the sum of time critical activities. These critical activities each time interval did not have to delay the implementation of activities. The activities that are on the critical path is the activity with the notation : A-C-E-F-I-L-MQ-U-V-W-X-Y-Z-AA-AC-AD gained 4+9+6+6+1+3+6+1+1+6+1+6+6+1+6+1 = 64 days.
Analisis Dan Evaluasi Jabatan Dengan Metode Point Sistem Untuk Menentukan Upah Pada PT Astra Internasional Auto 2000 Cabang Medan Maulidani Purba; Raspal Singh; Banjarnahor Banjarnahor
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 2, No 2 (2018): EDISI NOVEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31289/jime.v2i2.2438

Abstract

PT Astra International 2000 Cabang Medan, dalam memperhatikan kesejahteraan adalah dengan analisis jabatan yang dapat menyeimbangkan antara tanggung jawab yang diemban  kepada karyawan dengan upah yang diterima karyawan tersebut. Studi ini bertujuan untuk mendapatkan nilai-nilai relative dari kelompok jabatan pelaksana didepartemen service yang berstatus karyawan tetap. Metode evaluasi jabatan yang dipergunakan untuk menentukan gaji/ upah karyawan adalah dengan metode point sistem (Metode Angka) karena metode ini lebih objektif dibandingkan metode lain yang ada. Dari hasil analisis dan evaluasi jabatan ini penulis memperoleh nilai point terendah yaitu 139 dengan gaji yang disarankan 1.131.606,04 untuk jabatan lubing dan nilai point jabatan yang tertinggi yaitu 334 dengan gaji yang disarankan 2.686.407,34 untuk jabatan mekanik. Berdasarkan nilai point yang diperoleh maka ditentukan besar gaji yang disarankan dengan metode least square atau jumlah kuadrat terkecil dengan persamaan regresi Y= 23311,78 + 7973,34 (X)
Peramalan Tingkat Permintaan LPG PT. Pertamina (Persero) Di Elpiji Tandem Joko Wijono; Ninny Siregar; M Banjarnahor
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING Vol 2, No 2 (2018): EDISI NOVEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31289/jime.v2i2.2434

Abstract

LPG that produced by PT. Pertamina (Persero) unit Pengolahan I Pangkalan Brandan cames from natural gas. LPG usually used by people for industry and home needs. Most of high-end community prefer to consume to fuel oil, outfil legible job decay (durable) bat need big investment(because the storages of LPG or LPG bottle is expensive). Most of LPG consumption for north sumatera consumer supplied by PT. Pertamina (Persero) Unit Pengolahan I Pangkalan Berandan. For maintaining LPG continuity, so demand forecasting is a neccessary for the future. Considering the decline of LPG production, which caused by natural trend linier gas reserver. To predict the demand in the demand in the future, it can count using and Exponential Smoothing forecasting method. Exponential Smoothing forecasting method that used is double Exponential Smoothing forecasting method and then parameter estimate to get the minimum (Mean Square Error).  From the calculation forecasting method, Double Exponential Smoothing forecassting method can give the minimum MSE price with one parameter 0,1 and for Depot Tandem UPMS I Medan in 2010 is79.740,414 kiloliter.Keywords : Eksponential Smoothing Methode , forecasting

Page 1 of 2 | Total Record : 12