cover
Contact Name
Ahmad Ashifuddin Aqham
Contact Email
ahmad.ashifuddin@gmail.com
Phone
+6285726173515
Journal Mail Official
katon@politeknikpratama.ac.id
Editorial Address
Politeknik Pratama Purwokerto Alamat : Komplek Purwokerto City Walk (PCW) Jl. H.R. Bunyamin Blok A 11-12 Purwokerto 53121 email : admisi@politeknikpratama.ac.id, website : www.politeknikpratama.ac.id
Location
Kab. banyumas,
Jawa tengah
INDONESIA
Jurnal Penelitian Rumpun Ilmu Teknik
ISSN : 29638178     EISSN : 29637813     DOI : 10.55606
Sistem Komputer / Teknik Komputer Sistem Informasi Teknik Perangkat Lunak Teknologi Informasi Teknik Informatika / Ilmu Komputer Bidang-bidang lainnya yang termasuk ke dalam rumpun ilmu tersebut.
Articles 87 Documents
PERBAIKAN MOTOR INDUKSI WINDER MC EXTRUDER DI PT.MURNI MAPAN MANDIRI Panji Anom Respati; Endi Permata
Jurnal Penelitian Rumpun Ilmu Teknik Vol. 1 No. 4 (2022): November : Jurnal Penelitian Rumpun Ilmu Teknik
Publisher : POLITEKNIK PRATAMA PURWOKERTO

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (675.065 KB) | DOI: 10.55606/juprit.v1i4.566

Abstract

Di masyarakat saat ini kebutuhan terhadap karung, terpal, serta jaring paranet masih banyak diniminati untuk kebutuhan sehari-hari terlebih masyarakat saat ini memerlukan karung sebagai tempat untuk membawa berbagai hasil tani maupun hasil produksi di berbagai jenis usaha .para pelaku industri karung, terpal, dan jaring paranet tidak henti-hentinya terus melakukan produksi agar bisa memenuhi segala kebutuhan masyarakat baik di dalam negri maupun di luar negri seperti PT. Murni Mapan Mandiri. Metode yang digunakan yaitu dengan observasi dan wawancara untuk mengetahui cara perbaikan motor induksi winder yang mengalami kerusakan terbakarnya gulungan kawat pada bagian stator, yang melewati langkah-langkah untuk melakukan perbaikannya seperti tahap awal yaitu memisahkan bagian rotor dengan statornya sampai dengan permberian sirlak pada kawat di bagian stator motor induksi.
Pengaruh Keselamatan dan Kesehatan Kerja serta Beban Kerja terhadap Kinerja Pekerja Proyek Konstruksi Mohammad Djaelani; Didit Darmawan
Jurnal Penelitian Rumpun Ilmu Teknik Vol. 1 No. 4 (2022): November : Jurnal Penelitian Rumpun Ilmu Teknik
Publisher : POLITEKNIK PRATAMA PURWOKERTO

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (774.016 KB) | DOI: 10.55606/juprit.v1i4.567

Abstract

The performance of workers is one part of being able to develop a business. Not only demanding from the side of workers, companies also need to pay attention to work facilities to improve worker performance. Occupational Health and Safety is one part of the labor law. Every employer organization is required to implement Occupational Health and Safety in the implementation of work. Occupational Health and Safety is an important element to build worker performance. In addition, the perceived workload will determine the performance of workers. This study aims to determine the role of Occupational Health and Safety and workload on the performance of construction workers. This study uses 89 respondents who are construction workers. Data were obtained using a questionnaire which was distributed to the research sample. This study uses regression analysis. The results showed that Occupational Health and Safety had a significant influence on the formation of worker performance. Furthermore, the performance of workers is also known to be significantly influenced by workload. The two variables, namely Occupational Health and Safety and workload, are known to have a significant influence together on the formation of worker performance.
Rancang Bangun Alat Pengisi Saos Otomatis Berbasis Arduino UNO Muhammad Fauzi Alfikri; Arie Atwa Magriyanti; Danang Danang
Jurnal Penelitian Rumpun Ilmu Teknik Vol. 1 No. 2 (2022): Mei : Jurnal Penelitian Rumpun Ilmu Teknik
Publisher : POLITEKNIK PRATAMA PURWOKERTO

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1549.288 KB) | DOI: 10.55606/juprit.v1i2.580

Abstract

Mengisi saos ke dalam botol secara manual adalah pekerjaan yang cukup merepotkan. Proses produksi yang seharusnya bisa lebih efektif dan efisien menjadi sedikit terhambat. Keadaan ini menimbulkan kekhawatiran bagi perusahaan yang memerlukan proses produksi secara singkat dan akurat demi memenuhi kebutuhan konsumen agar tepat waktu. Hal ini membuat perusahaan yang bergerak di bidang F&B bernama JJCOW sedikit mengalami kewalahan. Perusahaan ini bergerak di bidang barbeque home service. Salah satu produk JJCOW yang populer adalah saos signature JJCOW. Kebutuhan konsumen akan produk ini cukup tinggi. Saat ini, JJCOW masih memproduksi saos signature ke dalam botol menggunakan cara manual sehingga membuat proses produksi sedikit terhambat dan memakan waktu yang cukup lama. Berdasarkan latar belakang di atas, penulis ingin memudahkan proses produksi di JJCOW dengan membuat alat pengisi saos otomatis berbasis Arduino UNO agar lebih efektif dan efisien. Untuk membuat alat ini, komponen yang diperlukan yaitu mikrokontroller Arduino UNO, kabel jumper, breadboard, sensor infrared, relay 1 channel, lcd 16x2, i2c 1206, push button, pompa diafragma 12v 2a, dan adaptor 12v 3a. Setelah melakukan uji coba, waktu yang diperlukan untuk pengisian satu botol saos sangat sedikit. Untuk pengisian satu botol saos, waktu yang diperlukan tidak sampai 2 detik.
Re-Layout Tata Letak Bagian Percetakan Menggunakan Calullar Manufacturing System Yohanes Anton Nugroho
Jurnal Penelitian Rumpun Ilmu Teknik Vol. 1 No. 4 (2022): November : Jurnal Penelitian Rumpun Ilmu Teknik
Publisher : POLITEKNIK PRATAMA PURWOKERTO

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1595.868 KB) | DOI: 10.55606/juprit.v1i4.613

Abstract

Material handling in the production division of publisher X encountered several obstacles, including the transfer of material between production processes having cross-movement flows. This condition occurs as a result of an irregular engine layout. The impact of the conditions in the transfer of material in the production process is the distance of the transfer to be 968.6 m/day. This condition causes some machines to be repositioned, so that material transfer can run faster and more efficiently. One of the efforts to reduce material transfer is to re-plan the placement of production facilities by adopting the concept of a cellular manufacturing system or cellular manufacturing system that is feasible to be applied to the production process of publisher X. The cellular manufacturing system was chosen because it is in accordance with the number of characteristics of the publishing industry that requires the ability to anticipate changes. This rapid demand suits a particular market. This article describes how the results of rearranging and minimizing the distance of moving raw materials in the production section of publisher X by adopting the concept of a cellular manufacturing system and rearranging the layout of production facilities by using sorting using Sorting Algorithms. The selection of the Sorting Algorithms is based on consideration of the order of the output which is not coherent, so it needs to be sorted. Efficient sorting is needed to determine the part-machine incidence matrix which is then used in the development of cellular manufacturing systems. Program development on Visual Studio 2012 software shows the results of facility layout planning by grouping 20 machines and 11 products with this layout change, the total material handling distance is reduced by 371.8 m or by 61.61%
Rencana Anggaran Biaya dengan Metode BOW pada Pembangunan Ruang Kelas Baru Universitas Sunan Giri Surabaya Mochamad Djaelani; Ella Anastasya Sinambela
Jurnal Penelitian Rumpun Ilmu Teknik Vol. 1 No. 3 (2022): Agustus : Jurnal Penelitian Rumpun Ilmu Teknik
Publisher : POLITEKNIK PRATAMA PURWOKERTO

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (145.764 KB) | DOI: 10.55606/juprit.v1i3.615

Abstract

The need for space to carry out human activities is increasing day by day. One of them is for teaching and learning activities that require better classrooms. With the growth in the number of students, the need for classrooms cannot be avoided. Classroom construction is a form of labor-intensive construction work. To start construction activities, start by budgeting construction costs. Cost budgeting is required so that the contractor can provide information to the client regarding the required costs. This study aims to determine the budget for building classrooms. The study used the BOW method. The BOW method is considered sufficient because it makes the building labor intensive. The research was conducted on an area of ​​5 x 7 meters. The results showed that to build a classroom on vacant land, Rp. 74.567.534. Contractors strengthen foundation work such as concrete work, wall work, and floor work. These three jobs use higher construction costs.
Dampak Stres, Lingkungan Kerja dan Masa Kerja terhadap Produktivitas Pekerja Konstruksi Rahayu Mardikaningsih; Ella Anastasya Sinambela; Eli Retnowati; Didit Darmawan; Arif Rachman Putra; Samsul Arifin; Louise Elizabeth Radjawane; Fayola Issalillah; Rafadi Khan Khayru
Jurnal Penelitian Rumpun Ilmu Teknik Vol. 1 No. 4 (2022): November : Jurnal Penelitian Rumpun Ilmu Teknik
Publisher : POLITEKNIK PRATAMA PURWOKERTO

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (143.315 KB) | DOI: 10.55606/juprit.v1i4.616

Abstract

Industri konstruksi dengan jumlah pekerja yang relatif banyak menyebabkan munculnya tantangan keamanan, kesejahteraan dan produktivitas pekerja. Penyelesaian terkait produktivitas pekerja tentu membutuhkan beberapa faktor yang turut mendukungnya seperti stres kerja, lingkungan kerja dan masa kerja. Oleh karena itu penelitian deskriptif ini akan menggambarkan masalah untuk mengembangkan produktivitas melalui pengamatan stres, lingkungan kerja, dan masa kerja. Studi dilakukan di salah satu perusahaan konstruksi berpusat di Jakarta dan tertuju pada salah satu proyek pengerjaan di Kota Malang. Ada 214 pekerja dijadikan responden. Pengumpulan data menggunakan angket. Hipotesis diuji setelah melakukan analisis regresi. Hasil penelitian menunjukkan terdapat pengaruh yang positif dan signifikan dari stres terhadap produktivitas pekerja konstruksi. Terdapat pengaruh yang positif dan signifikan dari lingkungan kerja terhadap produktivitas pekerja konstruksi. Terdapat pengaruh yang positif dan signifikan dari masa kerja terhadap produktivitas pekerja konstruksi. Terdapat pengaruh yang positif dan signifikan dari stres, lingkungan kerja dan masa kerja kerja terhadap produktivitas pekerja konstruksi.
Analisa Performansi Mesin Diesel MAK 8M453 Tipe 4 Langkah dengan Daya Terpasang 2500 kW Yufitriani Littik
Jurnal Penelitian Rumpun Ilmu Teknik Vol. 1 No. 4 (2022): November : Jurnal Penelitian Rumpun Ilmu Teknik
Publisher : POLITEKNIK PRATAMA PURWOKERTO

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (775.284 KB) | DOI: 10.55606/juprit.v1i4.630

Abstract

In actual diesel engine work cycle is part of the heat input that occurs at constant volume and partly at constant pressure. Therefore, in the calculation of the design of the modern diesel motor cycle, a limited pressure air cycle (combined cycle) is used. The purpose of this study is to analyze the performance of the diesel engine in the PLTD Tenau-Kupang and to find out the deviations or losses that occur in the diesel motor work cycle. From the results of the research in the form of an analysis of calculations at 600 rpm engine speed, it can be concluded that the basic factors of the performance of an engine include the average effective pressure (MEP), piston speed, ratio of stroke length and cylinder diameter, number of cylinders, and calculations for power. The resulting motor is close to the actual motor power.
Studi Tentang Perilaku Pembelian Rumah Tipe 36 di Kabupaten Sidoarjo yang Ditinjau dari Faktor Harga, Lokasi dan Promosi Arif Rachman Putra; Samsul Arifin; Jahroni Jahroni; Misbachul Munir; Didit Darmawan; Rahayu Mardikaningsih; Ella Anastasya Sinambela
Jurnal Penelitian Rumpun Ilmu Teknik Vol. 1 No. 3 (2022): Agustus : Jurnal Penelitian Rumpun Ilmu Teknik
Publisher : POLITEKNIK PRATAMA PURWOKERTO

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (695.657 KB) | DOI: 10.55606/juprit.v1i3.658

Abstract

. An appropriate marketing strategy is definitely needed by companies from small to large scale, there are no companies engaged in the property sector. This is because currently there are many similar property businesses with their respective attractiveness and advantages in the minds of the people. This study focuses on factors such as price, location and promotion. The method in this study is descriptive associative, namely analyzing the data by describing the data and knowing the relationship between variables. The research location is in Sidoarjo Regency. Samples were taken by accidential technique. There are 100 respondents involved in this study. Regression analysis for analysis uses SPSS version 26. This study proves that purchasing behavior is significantly affected by price partially. Location has a significant role in buying behavior. The role of promotion can significantly influence buying behavior. Likewise, buying behavior is influenced by price, location and promotion simultaneously.
Perancangan UI/UX Aplikasi MinaTani Sistem Informasi Agriculture Technology Menggunakan Metode Design Thinking Aas Aisyiah; M. Naufal Muhadzib Al-Faruq; Nur Aini
Jurnal Penelitian Rumpun Ilmu Teknik Vol. 1 No. 4 (2022): November : Jurnal Penelitian Rumpun Ilmu Teknik
Publisher : POLITEKNIK PRATAMA PURWOKERTO

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (496.456 KB) | DOI: 10.55606/juprit.v1i4.780

Abstract

Hampir separuh dari jumlah rakyat Indonesia bekerja di sektor pertanian. Namun, perkembangan teknologi yang begitu pesat menyebabkan perubahan drastis bagi kehidupan saat ini, tak terkecuali pada sektor pertanian. Hal ini menyebabkan tertinggalnya industri pertanian Indonesia dalam bidang teknologi. Maka dari itu, dibutuhkan sebuah platform yang dapat menjadi jalur pemahaman akan teknologi dalam bidang pertanian yang dapat diakses oleh masyarakat luas. MinaTani merupakan sebuah aplikasi sistem informasi di bidang pertanian secara online. Fitur yang terdapat pada aplikasi meliputi kelas online, toko online, program mentorship, dan masih banyak lainnya. Penelitian ini menggunakan metode penelitian pendekatan Design Thinking. Metode Design Thinking merupakan sebuah metode desain produk perangkat lunak berbasis inovasi yang bertumpu pada pencarian solusi untuk menyelesaikan permasalahan tertentu. Setelah menemukan dan memahami permasalahan yang didapat melaui proses Identify the problem, Describe Solution, Empathize to User, Appeal to Business, Lock in Agreement (IDEAL) dan Prototype serta Test. Sehingga Aplikasi MinaTani mampu menjadi solusi dari permasalahan yang terjadi di masyarakat saat ini.
Analisis Tarif Pelayanan Tunda Di Pelabuhan ParePare Berdasarkan Pengguna Jasa Rahmawati Djunuda; Samaluddin Samaluddin
Jurnal Penelitian Rumpun Ilmu Teknik Vol. 1 No. 2 (2022): Mei : Jurnal Penelitian Rumpun Ilmu Teknik
Publisher : POLITEKNIK PRATAMA PURWOKERTO

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (941.542 KB) | DOI: 10.55606/juprit.v1i2.801

Abstract

Jasa tunda merupakan jasa yang diberikan oleh pelabuhan untuk mendorong atau menarik kapal keluar atau menuju dermaga. Tujuan penelitian ini untuk mengetahui kesesuaian tarif pelayanan tunda kapal yang berlaku saat ini di Pelabuhan ParePare dengan kemampuan dan kemauan bayar pengguna jasa. Data dianalisa dengan menggunakan metode ATP dan WTP. Hasil analisis diperoleh tarif variable pelayanan tunda yang berlaku saat ini sudah sesuai dengan kemampuan bayar pengguna jasa karena ATP responden lebih besar dari tarif yang berlaku saat ini, tetapi belum sesuai dengan kemauan bayar pengguna jasa karena WTP responden lebih kecil dari tarif yang berlaku saat ini. Tarif tetap untuk kapal 500 GT – 3500 GT sudah sesuai dengan kemampuan bayar pengguna jasa karena ATP responden sama dengan tarif yang berlaku saat ini, tetapi belum sesuai dengan kemauan bayar pengguna jasa karena WTP responden lebih kecil dari tarif yang berlaku sekarang ini. Kapal berukuran 3501 GT – 8000 GT, tarif yang berlaku saat ini sudah sesuai dengan kemampuan dan kemauan bayar pengguna jasa karena ATP dan WTP responden sama dengan tarif yang berlaku saat ini. Kapal berukuran 14.001 GT – 18.000 GT, tarif yang berlaku saat ini sudah sesuai dengan kemapuan dan kemauan bayar pengguna jasa karena ATP responden sama dengan tarif yang berlaku saat ini, tetapi belum sesuai dengan kemauan bayar penguna jasa.