cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Prima Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir
ISSN : -     EISSN : -     DOI : -
Core Subject : Science,
Jurnal Prima Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir, Jurnal ilmiah diterbitkan oleh Pusat Rekayasa Perangkat Nuklir - BATAN Alamat Rekaksi: Pusat Rekayasa Perangkat Nuklir (PRPN) - BATAN
Arjuna Subject : -
Articles 228 Documents
RANCANGAN SISTEM TRANSMISI RAK SUMBER RADIASI IRRADIATOR GAMMA UNTUK STERILISASI HASIL PERTANIAN Sanda Sanda
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 7, No 13 (2010): Juni 2010
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (847.996 KB)

Abstract

RANCANGAN SISTEM TRANSMISI RAK SUMBER IRADIASI UNTUK IRRADIA TOR GAMMA ISG-500. Telah dirancang sistem transmisi rak sumber radiasi irradiator gamma ISG- 500 yang digunakan untuk sterilisasi hasil pertanian. Rak sumber radiasi adalah salah satu perangkat irradiator gamma yang digunakan untuk meradiasi hasil pertanian yang berada di dalam carrier dengan berat 150 kg. Rak sumber radiasi dari dalam kolam ditarik ke atas permukaan kolam atau diturunkan ke dalam kolam dengan perantara tali sling baja tahan karat. Proses naik dan turunnya rak sumber dikendalikan oleh motor induksi dengan daya 2,5 kW yang dikopel oleh gigi reduksi dan kopling tetap. Sistem transmisi ini juga mempertimbangkan aspek gagal listrik dan gagal UPS ketika gagal listrik solusinya adalah dengan menggerakan motor induksi secara manual. Sedangkan gerak rak sumber menuju posisi iradiasi dilakukan dengan kecepatan 1,57 m/detik dengan dua pertimbangan, yaitu agar diperoleh gerakan yang halus ketika rak sumber sampai pada teralis dan mencegah terjadinya shutdown akibat terbenturnya teralis dengan rak sumber atau carrier. A DESIGN OF TRANSMISSION SYSTEM FOR A RACK SOURCE OF IRRADIATION OF ISG-500 GAMMA IRRADIA TOR. A transmission system has been designed for a gamma source rack of irradiator ISG-500 for sterilization of agricultural products. Radiation source rack is an equipment used for the gamma irradiator to irradiate agricultural products which reside in a carrier having weight of 150 kg. The rack sources of irradiation will be pulled up or down from the pond by stainless steel sling. The process of the up and down of the sources rack is controlled by a 2.5 kW induction motor which is coupled by a gear reduction and permanent couplings. This transmission system is also considering of any electrical failure, both central electric source and UPS system, by manual system. The speed of the rack toward its position for ready for operation is 1,57 m / second with two constderstions, namely in order to obtain a smooth movement when the rack until the bars of the source and to prevent shutdown due to any collision between the bar and the rack or the carrier.  
PERANCANGAN PERANGKAT LUNAK REKONSTRUKSI CITRA 3 DIMENSI DARI LEMBARAN CITRA HASIL REKONSTRUKSI 2 DIMENSI Mohamad Amin; Fitri Suryaningsih; Demon Handoyo
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 12, No 2 (2015): November 2015
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (754.084 KB)

Abstract

ABSTRAKPERANCANGAN PERANGKAT LUNAK REKONSTRUKSI CITRA 3 DIMENSI DARI  LEMBARAN CITRA HASIL REKONSTRUKSI 2 DIMENSI. Perancangan perangkat lunak rekonstruksi citra 3 dimensi (3D) dari lembaran-lembaran citra hasil rekonstruksi 2 dimensi (2D) adalah suatu bagian perekayasaan perangkat lunak untuk memvisualsasi citra hasil radiografi sinar x pada laboratorium Non Destructive Evaluation yang sedang dikembangkan di PRFN BATAN. Metode perancangan yang digunakan yaitu dengan menghitung nilai koefisien atenuasi linier per piksel dari  masing-masing lembaran citra hasil rekonstruksi 2D. Kemudian koefisien atenuasi linier perpiksel dari masing-masing lembaran tadi diurutkan bedasarkan nomor lembarannya dan dijumlahkan mengikuti sudut arah dari berkas sinar x. Nilai total dari masing-masing koefisien atenuasi linier tersebut selanjutnya ditransformasikan ke dalam bentuk citra 3D. Proses rekonstruksi dari citra 2D ke dalam bentuk citra 3D direpresentasikan dalam bentuk diagram alir. Hasil perancangan adalah suatu diagram alir yang menggambarkan aliran proses untuk mendapatkan citra hasil rekonstruksi 3D dari citra hasil rekonstruksi 2D.Kata kunci: perancangan, rekonstruksi citra 3D, koefisien atenuasi linier, lembaran citra ABSTRACT DESIGNING 3D IMAGE RECONSTRUCTION SOFTWARE FROM THE SLICES OF 2D IMAGE RECONSTRUCTION.Designing 3 image reconstruction software from the slices of 2D  reconstructed image is a part of software engineering to visualize an image resulted from x ray radiography in the Non Destructive Evaluation (NDE)  laboratory that is being developed in PRFN BATAN.The design method used is by calculating the linier attenuation of each pixel of image from every 2D image slice.The linier attenuation coefficient of each pixel of each slice is ordered based on its slice number and then added by following the x ray direction angle. The total value of linier attenuation coefficient of pixels is then transformed into gray values of 3D image. The reconstruction process from 2D to 3D is presented in a flowchart. The design results are some flowcharts that describe the process flow to get 3D reconstruction image from 2D image.    Keywords: designing,3D image reconstruction, linier attenuation coefficient, image slice.
REKAYASA ISOLATOR PANAS PERALATAN UJI SAMPEL PASIR ZIRKON Tukiman Tukiman
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 5, No 9 (2008): Juni 2008
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2459.626 KB)

Abstract

ABSTRAK REKAYASA    ISOLATOR  PANAS  PERALATAN  UJI  SAMPEL  PASJR ZIRKON,   Telah dibuat isolator panas peralatan  uji sampel pasir zirkon dalam bentuk padat dari bahan campuran batu tahan api,   tanah liat dan silikat yang dibentuk menjadi agregat dengan perbandingan  volume 1 : 1 : 0.2.  Isolator   dibagian   luarnya  ditambahkan  lapisan glass  wol setebal  150 mm dan serat asbes,   yang  berfungsi  untuk pengungkung  panas  dan  mengurangi  perpindahan  panas  yang terjadi pada  waktu operasi. Keberadaan  peralatan tungku pemanas  sebagai  peralatan utama dalam  penelitian   ini,  digunakan   untuk  pemanasan   sampel  hingga  suhu   1000o C.   Metode pembuatan agregat   menjadi   isolator   dilakukan   dengan   cara  mendiamkan   agregat,    dan memanaskan pada suhu 300 ° C konstan selama 6 jam. Dari hasil percobaan yang dilakukan selama 8 jam pemanasan  terus menerus isolator pemanas dapat berfungsi dengan baik. Kata kunci:   Isolator padat,  tungku pemanas.  ABSTRACT HEATER ISOLA TOR ENGINEERING  ON TEST EQUEPMENT  OF ZIRCON-SAND  SAMPLE. A heater isolator  for a test equipment  of solid zircon -sand,   which is made by an aggregate  of refractory  brick,  clay,  and silicate  with volume composition  1  :   1  :  0,2  respectively,   was made. The Isolator has been made by heating the aggregate at    300 °C constant temperature  for six hours.   A  layer  of glass-wall  with  150 mm  thickness  and  asbestos-fiber  are provided  at  the outside  of  the  isolator  to isolate  the  heat  produced  by  the  furnace  filament.   The operation temperature  of  the  furnace  will  be  1000 °C.  From  the  experiment  conducted  at  8 hours  of furnace operation shows that the isolator works propely.Keyword:  Solid isolator,  electric furnace
PEMODELAN REAKTOR RISET KARTINI MENGGUNAKAN MODEL ARX Arjoni Amir
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 3, No 6 (2006): November 2006
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2333.697 KB)

Abstract

ABSTRAKPEMODELAN   REAKTOR   RISET  KARTINI  MENGGUNAKAN   MODEL  ARX. Telah dilakukan penelitian  pemodelan   reaktor  riset  nuklir  Kartini  dengan  menggunakan   metode  identifikasi sistim.   Proses  identifikasi   sistim  menggunakan  pasangan   data  input-output   secara  off-line. Reaktor  penelitian  diasumsikan  sebagai  plant  black-box  dengan  input  adalah  reaktivitas  dan output   adalah   daya   linier   reaktor.    Struktur   model   yang   dipilih   adalah   struktur      model AutoRegressive    eXogenous    (ARX)   dengan   Single   Input   Single   Output   (SISO).     Untuk mengestimasi  parameter  ARX  tersebut digunakan  kriteria prediction  error seperti Akaike Final Prediction  Error (FPE),   Loss Function (LF) dan Best Fit (BF).   Sedangkan  untuk validasi model reaktor  digunakan   input  step  response,    frequency  response,   pole  -zero,   noise  spectrum, autocorrelation  dan crosscorrelation  pengan level convidence  99 %. ABSTRACTMODELLING  OF  KARTINI  RESEARCH  REACTOR  BY  USING  ARX  MODEL.  Modelling  of Kartini nuclear research reactor  has been done by using methods of system identification.  Process of system identification uses a set of data couple of input-output with off-line condition.   Research reactor assumed  as black-box  plant with input is reaktivity and output is linear energy of reactor. Model structure  selected is model structure A.utoregressive  eXogenous (ARX) with Single Input Single Output (SISO). To estimate parameter of ARX uses criteria of prediction error like Akaike Final of Predictjon Error (FPE), Loss Function (LF) and Best Fit (BF).  While for model validation reactor used input of step response, frequency response, pole - zero, noise spectrum, autocorrelation  and  crosscorrelation  with convidence level 99 %. Keyword  :   identifikasi   sistim,   autoregressive   exogenous   (ARX),  single  input  single  output(SISO), reaktor.
RANCANGAN MODUL PENGANALISA TINGGI PULSA SALURAN TUNGGAL DENGAN MENGGUNAKAN MONOSTABLE MULTIVIBRATOR Wiranto Budi Santoso; Joko Sumanto
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 1, No 2 (1999): Oktober 1999
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2926.861 KB)

Abstract

ABSTRAKRANCANGAN MODUL PENGANALISA TINGGI PULSA SALURAN TUNGGAL DENGAN MENGGUNAKAN MONOSTABLE MULTIVIBRATOR. Telah dirancang sebuah modul penganalisa tinggi pulsa saluran tunggal (Single Channel Analyzer-SCA) yang berfungsi sebagai penyeleksi pulsa masukan dan kemudian menerusken pulsa terseleksi tersebut ke  subsistem  selanjutnya..   Rancangan  ini dimaksudkan untuk membantu penelitian perekayasaan sistem elektronik kamera gama planar yang dihubungkan dengan komputer PC..  Penggunaan monostable multivibrator dalam rancangan ini dimaksudkan untuk penyederhanaan rangkaian.SCA terdahulu menggunakan banyak komponen diskret sehingga rangkaian elektroniknya menjadi  rumit.   Sedangkan SCA yang dirancang menggunakan komponen yang lebih sederhana dan  telah disesuaikan  dengan kondisi rangkaian  selanjutnya.  Hasil pengujian  rancangan  modul  SCA ini  hanya  melewatkan  pulsa  yang  puncaknya  berada  pada  daerah jendela dE yang telah ditetapkan. ABSTRACTDESIGN OF SINGLE CHANNEL ANALYZER MODULE USING MONOSTABLE MULTIVIBRATOR.  It has been designed a Single Channel Analyzer (SCA) module which has function as a selector of input signals and then pass the selected signals to next sub-systems. The design of SCA   module is intended to support  the research on electronic systems of  a planar gamma camera which is connected to PC computer   The use of monostable multivibrator in this design is intended to  simplify  the electronic circuit.  The previous SCA  modules use a lot of discrete components so that its electronic circuit is complex. On the other hand the designed SCA  module uses simple components and it has already adjusted to suit with the next circuits.  The result of evaluation the SCA  modules.  they only pass pulses which have the pulse peak  lied in the range of dE window's setting
ALIH TEHNOLOGI KEGIATAN MANAJEMEN KONSTRUKSI MENUJU PERSIAPAN PEMBANGUNAN PLTN DI INDONESIA Utomo Utomo
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 8, No 1 (2011): Juni 2011
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (972 KB)

Abstract

TRANSFER OF TECHNOLOGY CONSTRUCTION MANAGEMENT ACTIVITIES TOPREPARATION OF NPP DEVELOPMENT IN INDONESIA (An Experience Of Mul ti Propose Reactor 30 Devel opment at Serpong). Management and development of a nuclear installati on coul d not be separated from the role of Construction Management in the pl anning stages of the project start until  the commissioni ng. On the construction of nuclear install  tions MPR 30 Serpong, the rol e of human resource  of Indonesia particularly Batan has recei ved a lot of knowl edge and experiences i n the development process, the ongoing process of transfer of technology from the foreign consultants (Bechtel -USA) to Batan has been conducted at theti me, and at l east we are abl e to absorb knowledge and prove i t  hrough to completi on development incl udi ng commissioni ng activiti es. In the course of the time human resource chal lenges are requi red to have individual skil ls and expertise suffici ent to handle a mega project such as nuclear power plants. Constructi on Management is managi ng a maj or project stages from planning, construction, procurement, i nstall ation commissioni ng until handover to the owner. Based on the experience of the construction of the RSG-LP, it  i s expected that  human resources that meet to the standards requi red competencies for the preparation of NPP i n Indonesia are fulfill ed. PROSES ALIH TEHNOLOGI KEGIATAN  MANAJEMEN KONSTRUKSI MENUJUPERSIAPAN PEMBANGUNAN PLTN DI INDONESIA (Pengalaman Pembangunan Reaktor Serba Guna Serpong).Pengelolaan pembangunan i nstalasi nukli r tidak lepas dari peran Manajemen Konstruksi dal am  ahapan proyek mulai perencanaan sampai kommisioning. Pada pembangunan i nstal asi  nuklir RSG-LP Serpong peran SDM Indonesi a khususnya Batan telah banyak menimba pengalaman dal am proses pembangunan, pada saat it u proses  alih tehnologi sedang berlangsung dari pihak konsul tan asing ( Bechtel-USA ) kepada  Batan, setidaknya kit a mampu menyerap ilmu dan membuktikannya  sampai sel esai  pembangunan  termasuk kegi atan kommisioning. Dalam perjalanan waktu tantangan SDM dituntut untukmemiliki kemampuan indifidual dan keahl ian yang memadai dal am menangani  suatu mega proyek seperti pembangki t tenaga nuklir. Manaj emen Konstruksi  merupakan tahapanpengel ol aan suatu proyek besar dari perencanaan, konstruksi ,  pengadaan ,kommisioni ng hingga serah terima instalasi  kepada pemilik. Berdasarkan  pengalaman pembangunan RSGLP, di harapkan kebutuhan SDM yang memiliki  persyaratan standar kopetensi  dapat terpenuhi menyongsong persiapan  pembangunan PLTN di Indonesia
PEREKAYASAAN PERANGKAT LUNAK PORTAL MONITOR RADIASI DENGAN LabVIEW™ Joko Triyanto; Dian Fitri Atmoko; Ahmad Rifai
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 11, No 2 (2014): November 2014
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1597.532 KB)

Abstract

ABSTRAKPEREKAYASAAN   PERANGKAT LUNAK PORTAL MONITOR RADIASI DENGAN LabVIEW™. Telah dilakukan pembuatan   perangkat lunak portal monitor radiasi dengan menggunakan  LabVIEW™.  Perangkat  lunak  ini  mampu  mendeteksi  adanya  sumber  radiasi standard di dalam model kendaraan. Pada saat model kendaraan melewati Portal Monitor Radiasi (PMR) akan terjadi  alarm karena hasil cacahan  melebihi ambang batas yang sudah ditetapkan. Semua   alarm yang terjadi, data   pemindaan, data latar   dan   kendaraan   disimpan di dalam database. Dari sepuluh kali percobaan PMR, adanya sumber pada model kendaraan tersebut selalu dapat dikenali. Bentuk profil hasil pemindaian belum dapat    menunjukkan  letak sumber didalam model kendaraan.Katakunci: Portal Monitor Radiasi (PMR) ,  LabVIEW™ ABSTRACTAN ENGINEERING OF RADIATION PORTAL MONITOR PROGRAM USING LabVIEW™. A computer program package for radiation portal monitor (RPM) using LabVIEW has been developed. This program is able to detect the presence of a standard source in a modeled vehicle. When the modeled vehicle passes through an RPM, the sensor is alarmed because the count exceeds the alarm threshold previously set. All data on the alarm occurrence, scanning process, background counts, and vehicles are stored in a database. The experiment was repeated ten times. The results indicate that the RPM is able to detect the presence of the standard source located in the modeled vehicle. However, the program still needs an improvement in the scanning profile to make it able to identify the precise location of the source in the vehicle.Keywords: Radiation Portal Monitor (RPM), LabVIEW™
BUDAYA KESELAMATAN DALAM INSTALASI NUKLIR Benar Bukit
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 5, No 10 (2008): Nopember 2008
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1887.249 KB)

Abstract

BUDAYA KESELAMATAN DALAM INSTALASI NUKLIR. Tujuan budaya keselamatan adalah agar seluruh personil berkonstribusi dan bertanggungjawab atas keselamatan instalasi dimana personil tersebut melakukan kegiatan. Budaya keselamatan ini penting karena banyak kecelakaan yang terjadi akibat kurangnya kepedulian terhadap keselamatan, seperti kejadian pada kecelakaan instalasi nuklir three Mile Island (1979) dan Chernobyl (1986), kejadian seperti ini memunculkan kesadaran bahwa faktor manusia memberikan konstribusi signifikan terhadap kegagalan suatu pengoperasian suatu sitem yang berpengaruh terhadap keselamatan. Batan adalah salah satu institusi yang mempunyai instalasi nuklir wajib menerapkan budaya keselamatan untuk menjamin pengoperasian instalasi nuklir yang aman, selamat dan handal, sehingga personil, masyarakat dan Iingkungan terlindung dari bahaya radiasi dari zat radioaktif yang dihasilkan. Budaya keselamatan mempunyai dua komponen utama, komponen yang pertama adalah kerangka kerja yang diperlukan dalam suatu organisasi, hal ini merupakan tanggungjawab manajemen. Komponen yang kedua adalah sikap personil pada semua tingkat dalam merespon dan memanfaatkan kerangka kerja tersebut Culture safety in the Nuclear instalation. Culture safety is aimed to empower all the personnels to contribute and responsible to the instalation safety where they work in. Culture safety is important as there were so many accidents happened due to the little attention given to the safety, take as examples of what happened in Three Mille Island instalation (1979) and Chernobyl (1986). These remind us that human factor gives a significant contribution to the failure of operational system which influences the safety. Therefore, as one of intitutions which has nuclear instalation. National Nuclear Energy Agency must apply the culture safety to guarantee the safety operation of nuclear instalation to protect- the personnels, community and environment from the hazard of radioactive radiation. Culture safety has two mian components. The first component under the management responsiblity is a framework needed in an organisation. The second component is the personnels attitude in al/ levels to respond and optimize those framework.
ANALISIS POLA-GERAKAN DI KERANGKA-GERAK INSTALASI IRADIATOR GAMMA MERAH PUTIH Achmad Suntoro; Sigit Bachtiar; Rissa Damayanti
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 14, No 1 (2017): Juni 2017
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (637.848 KB)

Abstract

ABSTRAKANALISIS POLA-GERAKAN DI KERANGKA-GERAK INSTALASI IRADIATOR GAMMA MERAH PUTIH. Pola-gerakan tote di kerangka-gerak instalasi iradiator gamma Merah Putih (IMP) dianalisis. Tote adalah kotak aluminium yang berisi obyek yang akan diiradiasi. Analisis pola-gerak difokuskan pada karakteristik waktu siklusnya yang terbentuk dari rangkaian langkah-gerak tote ketika mengitari sumber radiasi menggunakan kerangka-gerak. Kerangka-gerak dengan penggerak tote secara teoritis digunakan dalam analisis untuk menghasilkan pola-gerak potensi dengan karakteristik tertentu sebagai pembanding dari desain yang digunakan oleh IMP. Instalasi IMP tidak menggunakan potensi waktu siklus dengan jumlah langkah-gerak minimum, sehingga potensi waktu iradiasi minimum dan kecepatan produksi maksimum dari kerangka-gerak tidak digunakan. Perancang IMP kemungkinan memiliki alasan tertentu untuk tidak menggunakan potensi tersebut.Kata kunci : Pola-gerakan, waktu-siklus-minimum, waktu-iradiasi-minimum, kecepatan produksi. ABSTRACTMOTION-PATTERN ANALYSIS IN THE MOTION-FRAMEWORK OF MERAH-PUTIH GAMMA IRRADIATOR INSTALLATION. Tote motion patterns on the motion-framework of the Merah-Putih gamma irradiator installation (IMP) has been analyzed. Tote is an aluminum box containing the object to be irradiated. The motion-pattern analysis focuses on the cycle time characteristics formed by a series of tote-motion steps as the totes encircle the radiation source using the motion-framework. Theoritical tote-drive on the motion-framework is used in the analysis to generate potential motion patterns with certain characteristics as a benchmark of the design used by the IMP. The IMP installation does not use the potential minimum cycle time of the motion-famework that has minimum number of motion-step, so both the potential for minimum irradiation time and maximum production rate of the motion-framework are not utilized. The IMP designer may have some reasons not to utilize them.Key words: Motion-pattern, minimum-cycle-time, minimum-irradiation-time, production-rate
PERANCANGAN SEPARATOR UNTUK MEMISAHKAN FLUIDA PADAT DAN CAIR Sanda Sanda
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 4, No 8 (2007): November 2007
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2204.596 KB)

Abstract

ABSTRAK PERANCANGAN   SEPARATOR  UNTUK  MEMISAHKAN  FLUIDA  PADA T DAN  CAIR. Salah   satu   tahapan    dalam   proses   transesterifikasi    dalam   pembuatan    bioaditif   adalah pemisahan  bahan hasil produksi  berupa bioaditif sebagai produk  cair dan gliserin yang bersifat padat..  Untuk  mendukung  proses  tersebut  telah dirancang  "Separator"  (pemisah)  fluida padat dengan  metode penggerak  putar centrifugal  (centrifuge)  dengan  memanfaatkan  bilah pemutar yang mempunyai  sudut kemiringan  posisi bilah terhadap  spindel 45o dan kemiringan  bilah 10o. Putaran bilah digerakan  dengan motor pada kecepatan  putar yang bisa divariasi  antara 500 - 2900 rpm.  Hasil perhitungan  menunjukan  bahwa  kecepatan  maksimal  bilah1  =  26.56   m/detik dan kecepatan  maksimal    bilah 2 = 53.12 m/detik.  Gaya sentrifugal  yang terjadi di dalam fluida adalah 9.573,  74 -  19.147,48    .N,   Gaya tersebut  akan mampu  menekan  fluida di dalam bejana dan memisahkan  fluida padat dari fluida cair.       Berdasarkan  hasil pengujian  diperoleh jumlah fluida yang  keluar  dari  bibir  bejana  bersifat  proporsional,  yaitu  semakin  tinggi  putaran  motor semakin  banyak  fluida  yang  keluar. Pengujian   berdasarkan  sedimentasi  paksa  oleh putaran bilah  menunjukan   bahwa,   pada  putaran  rendah  diperlukan   waktu  yang  lama,  (n  500  rpm, diperoleh  waktu produksi  35 menit),   sedangkan   pada  putaran  tinggi  waktu produksi  menjadi lebih cepat (n 2900 rpm, waktu produksi  15 menit). kata kunci :  separator,  bioaditif, centrifugal.ABSTRACT A  DESIGN  OF  SEPARATOR  FOR  SEPARATING  LIQUID  AND  CRAMMING  FLUID. One of steps in transesterification  process in producing  bioaditive is separation  of product result material namely  bioaditive  as  liquid  product  and  gliserin  as  cramming  fluid.   To support  this process  has  be  designed  a  separator  cramming  by  centrifugal  force  that  uses  blade  driver having inclination  45o and blade slope  10o.The blade has been spun by an electric motor with the speed  in between  500 up to 2900 rpm.. The calculation  shows  that the blade 1   maximum speed is 26.56   m/s and and maximal speed blade 2 is 53.12 m/s.   The centrifugal  force in fluid was in between  9,573. 74 up to  19, 147.48 N.   The force  will be able to press  the fluid get out from the vessel  and separate  the liquid from cramming fluid.   Based on the testing results,  the amount of fluid get out from the vessel are proportionality,   increasing  the speed of the electric motor  will  increase  the  flow  out  of  the  fluid  from  the  vessel.   Other testing based  on  the sedimentation  force by the blades shows that the low speed requires longer time for production (n =  500 rpm requires 35 minutes) while at the high speed the time will be shorter (n = 2900 rpm requires  15 minutes for production). key words :  separator,  bioadditive,   centrifugal.

Page 5 of 23 | Total Record : 228