cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
Kampus Sekaran, Gunungpati, Semarang 50229
Location
Kota semarang,
Jawa tengah
INDONESIA
Jurnal Teknik Sipil dan Perencanaan
ISSN : -     EISSN : 25031899     DOI : https://doi.org/10.15294/jtsp
Core Subject : Engineering,
Jurnal Teknik Sipil dan Perencanaan (JTSP) is a scientific journal which biannualy published in April and October. We firstly published in 1999 as national journal of Department of Civil Engineering, Faculty of Engineering, Universitas Negeri Semarang. In 2016, JTSP was indexed in DOAJ with Green Tick critera. And in 2018, JTSP expands its range of article quality and publication through publishing English-language articles.
Arjuna Subject : -
Articles 8 Documents
Search results for , issue " Vol 17, No 1 (2015): Jurnal Teknik Sipil " : 8 Documents clear
TINJAUAN HOSPITALITY DESIGN PADA PUBLIC OPEN SPACE DI KOTA SEMARANG (Studi Kasus Taman Madukoro) Setiawan, Moch Fathoni; Purnomo, Andi
Jurnal Teknik Sipil dan Perencanaan Vol 17, No 1 (2015): Jurnal Teknik Sipil & Perencanaan
Publisher : Semarang State University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Public open space is part of the city in the form of outer space is used for activities of daily city dwellers. City park is one of the existing public open space in a city. In 2014, the government returned to a park Semarang Madukoro to perform maintenance on the trees and plants that are there. And like a city park that can fulfill its role as a public open space, it should also be noted the feasibility and design for user friendliness or term is a hospitality design. Hospitality design is the design with the principles of feasibility and comfort so as to create a design that is friendly to users. Feasibility and comfort is needed in a public facility. This research is a case study, the steps taken is to collect information and data on each state and the activities that occur in the Madukoro Park. The focus of the case study is to examine the physical condition of the environment in the Madukoro Park. From the results of observations made in the field, it was found that the physical condition Madukoro Park neighborhood in general in good condition, but based on the results of the analysis, there are still some shortcomings in both design, standards compliance and support facilities that did not exist.Ruang terbuka publik merupakan bagian dari kota yang berupa ruang luar digunakan untuk kegiatan penduduk kota sehari-hari. Taman kota merupakan salah satu ruang terbuka publik yang ada pada suatu kota. Pada tahun 2014, pemerintah Kota Semarang kembali memfungsikan taman madukoro dengan melakukan perawatan pada pohon dan tanaman yang ada disana. Dan layaknya sebuah taman kota yang dapat memenuhi perannya sebagai ruang terbuka publik, maka perlu juga diperhatikan tingkat kelayakan dan keramahan disainnya bagi para pengguna atau istilahnya adalah hospitality design. Hospitality design merupakan desain dengan prinsip-prinsip kelayakan dan kenyamanan sehingga dapat menciptakan desain yang ramah terhadap penggunanya. Kelayakan dan kenyamanan sangat diperlukan dalam sebuah fasilitas publik. Penelitian ini termasuk jenis studi kasus, maka langkah yang  ditempuh adalah mengumpulkan informasi dan data pada setiap keadaan dan aktifitas yang terjadi di Taman Madukoro tersebut. Fokus kasus pada penelitian ini untuk mengetahui kondisi fisik lingkungan di Taman Madukoro. Dari hasil observasi yang dilakukan di lapangan,  ditemukan bahwa kondisi fisik lingkungan Taman Madukoro secara umum dalam keadaan baik, Namun berdasarkan hasil analisa, masih terdapat beberapa kekurangan baik dalam desain, kesesuaian dengan standar maupun fasilitas penunjang yang belum ada.
MODEL STRUKTUR BANGUNAN RUMAH SEDERHANA DI DAERAH RAWAN LONGSOR – GUNUNGPATI SEMARANG Indarto, Himawan; Cahyo A., Hanggoro Tri
Jurnal Teknik Sipil dan Perencanaan Vol 17, No 1 (2015): Jurnal Teknik Sipil & Perencanaan
Publisher : Semarang State University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Every rainy season, residents in some residential locations prone to landslides in Gunungpati District of Semarang always concerned about the condition of their home and village roads are constantly shifting due to soil mass movement on the slopes. The movement of soil and foundation of the house that is not followed by the movement of the structure of the building houses on them, have very often result in damage to homes. For that we need a technical solution to ease the burden on the citizens. Technical solutions that will be in the form of a study of the system structure is simple house in accordance with the environmental conditions that are prone to landslides. In principle, the concept of making a safe home building structures to ground movement is to seek and make the whole elements of the foundation of the house and sloop, frame building (beams and columns), as well as the construction of the roof of the house, into a coherent whole and can not be separated on occurs when the ground motion (rigid body movement). The application of this concept, among others, is to create a connection that is strong enough and stiff among the various elements of the house, as well as the selection and implementation of appropriate material. The building houses designed using the principle of non-engineered construction and use of cheap materials and readily available, so that development can be done by local people without involving experts. With the existence of this study is expected to be made to the design of the structural model building simple houses to be built in areas prone to landslides. Setiap musim penghujan, warga di beberapa lokasi pemukiman rawan longsor Kecamatan Gunungpati Semarang selalu khawatir akan kondisi rumah dan jalan kampung mereka yang selalu bergeser akibat gerakan massa tanah pada lereng. Pergerakan tanah dan pondasi rumah yang tidak diikuti dengan pergerakan struktur bangunan rumah diatasnya, sudah sangat sering mengakibatkan terjadinya kerusakan pada rumah warga. Untuk itu perlu adanya solusi teknis untuk meringankan beban warga. Solusi teknis yang akan dilakukan berupa penelitian terhadap sistem struktur bangunan rumah sederhana yang sesuai dengan kondisi lingkungan yang rawan longsor. Pada prinsipnya, konsep membuat struktur bangunan rumah yang aman terhadap pergerakan tanah adalah dengan mengupayakan dan membuat seluruh elemen-elemen rumah yaitu pondasi dan sloof, rangka bangunan (balok dan kolom), serta konstruksi atap rumah, menjadi satu kesatuan yang utuh dan tidak lepas pada saat terjadi gerakan tanah (rigid body movement). Penerapan dari konsep ini antara lain adalah dengan cara membuat sambungan yang cukup kuat dan kaku diantara berbagai elemen rumah tersebut, serta pemilihan material dan pelaksanaan yang tepat. Bangunan rumah dirancang dengan menggunakan prinsip non-engineered construction dan menggunakan material-material yang murah serta mudah didapatkan, sehingga pembangunannya dapat dilakukan sendiri oleh warga setempat tanpa melibatkan tenaga ahli. Dengan adanya kajian ini diharapkan dapat dibuat rancangan model struktur untuk bangunan rumah sederhana yang akan dibangun di daerah rawan longsor.
ANALISIS KAPASITAS DAYA DUKUNG TIANG PANCANG TERHADAP HASIL UJI CALENDERING (Studi Kasus Review Design Pada Overpass Lemah Ireng Sta 20+212 Proyek Jalan Tol Semarang - Bawen Paket V) Saptorini, Takdir Rochjati
Jurnal Teknik Sipil dan Perencanaan Vol 17, No 1 (2015): Jurnal Teknik Sipil & Perencanaan
Publisher : Semarang State University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The potential for a design review becomes a necessity in construction projects and the principle of efficiency to be one of the considerations in conducting a design review at a construction while maintaining the technical factors such as structural safety of the building. Design review can be done to some construction that can not be implemented in the field because encounter some obstacle or structure can be implemented, but because of economic considerations it is necessary to change. As happened at the overpass Lemah Ireng Semarang Toll Road Development Project - Bawen Package V. The presence of excess stake in another overpass (L = 8 m), raises thought to be used in the overpass abutment 2 (OP) Lemah Ireng, where appropriate initial design , needs stake in OP Lemah Ireng are a number of 8 pieces, diameter (D) 50 cm, length of 9 meters. Results analisispondasi abutment piles in 2 Over Pass (OP) Lemah Ireng produce pile needs to be 10 (ten) pile diameter D = 50 cm length L = 8 meters. Analysis of design review is done by calculating the initial design capacity of pile group obtained at 8694.468 Kn, then share it with a capacity of 1 pole on a review of design (L = 8 m) in accordance with the SPT value at a depth of 8 (eight) of the meter. From the analysis of the bearing capacity of piles kalendering results obtained capacity 1 pole (Pcal) = 1527.941kN, while analysis of the bearing capacity of 1 stake on a review of design is determined by the strength of the soil, which amounted Pijin_rd = 1214.74916 kN. Thus the carrying capacity of piles technical design review results declared safe.Potensi adanya review design menjadi sebuah keniscayaan dalam proyek konstruksi dan prinsip efisiensi menjadi salah satu pertimbangan dalam melakukan review design pada sebuah konstruksi dengan tetap mengutamakan faktor teknis berupa keamanan struktur bangunan. Review design bisa dilakukan untuk beberapa konstruksi yang tidak dapat dilaksanakan di lapangan karena menjumpai beberapa kendala atau struktur bisa dilaksanakan tetapi karena pertimbangan ekonomis maka perlu diadakan perubahan. Seperti yang terjadi di  overpass Lemah Ireng Proyek Pembangunan Jalan Tol Semarang – Bawen Paket V. Adanya kelebihan tiang pancang di overpass lain (L = 8 m), memunculkan pemikiran untuk dapat digunakan di abutment 2 overpass (OP) Lemah Ireng, dimana sesuai design awal, kebutuhan tiang pancang di OP Lemah Ireng adalah sejumlah 8 buah, diameter (D) 50 cm, panjang 9 meter. Hasil analisispondasi tiang pancang di abutment 2 Over Pass (OP) Lemah Ireng menghasilkan kebutuhan tiang pancang menjadi 10 (sepuluh) tiang pancang diameter D = 50 cm panjang L = 8 meter. Analisis review design ini dilakukan dengan menghitung kapasitas kelompok tiang design awal yang didapat sebesar 8694,468 Kn, kemudian membaginya dengan kapasitas 1 tiang hasil review design (L = 8 m) sesuai dengan nilai SPT pada kedalaman 8 (delapan) meter tersebut. Dari analisis kapasitas daya dukung tiang pancang hasil kalendering didapat kapasitas 1 tiang (Pcal) = 1527.941kN, sementara analisis kapasitas daya dukung 1 tiang pancang hasil review design ditentukan oleh  kekuatan tanahnya, yaitu sebesar Pijin_rd = 1214.74916 kN. Dengan demikian kapsitas daya dukung tiang pancang hasil review design secara teknis dinyatakan aman.
PERKEMBANGAN SPASIAL PERMUKIMAN DI KAWASAN TUMBUH CEPAT STUDI KASUS DESA UMBULMARTANI, KECAMATAN NGEMPLAK KABUPATEN SLEMAN Sih Handoko, Jarwa Prasetya
Jurnal Teknik Sipil dan Perencanaan Vol 17, No 1 (2015): Jurnal Teknik Sipil & Perencanaan
Publisher : Semarang State University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The village Umbulmartani, Jalan Kaliurang KM 14, District Ngemplak, Sleman as one of the fast growing area in Sleman which are spatially growth. The higher the density of the building from time to time, there are demands that the dilai this area still leaves laha for catching rainwater for the preservation ligkungan. It also appears the phenomenon of a shift in activity or community activities in the area of agriculture to non-agricultural fields. This research receipts Rasioalistik Qualitative research approach, using theoretical basis Yag used to direct the study. Qualitative research methods were used in this study is a historical research methods. Yag theory presented Rapoport (1969) regarding the factors that determine the architectural embodiment of settlements into the main theory in this study. Purpose of this study was to determine and explain what kind of trend in the spatial development of settlements in the region is growing rapidly with case studies Umbulmartani Village, Jalan Kaliurang KM 14, District Ngemplak, Sleman.Desa Umbulmartani, Jalan kaliurang KM 14, Kecamatan Ngemplak, Kabupaten Sleman sebagai salah satu kawasan tumbuh cepat di Kabupaten Sleman yang secara spasial mengalami pertumbuhan. Kepadatan bangunannya semakin tinggi dari waktu ke waktu, dilai pihak ada tuntutan agar kawasan ini masih menyisakan laha guna penangkapan air hujan demi kelestarian ligkungan. Selain itu juga muncul adanya fenomena pergeseran aktivitas atau kegiatan masyarakat pada kawasan ini dari bidang pertanian ke bidang non pertanian. Penelitian ini meggunakan pendekatan penelitian Rasioalistik Kualitatif, dengan menggunakan landasan teori yag digunakan untuk mengarahkan penelitian. Metode penelitian kualitatif yang digunakan dalam penelitian ini adalah metode penelitian historis. Teori yag disampaikan Rapoport(1969) mengenai faktor yang menentukan perwujudan arsitektur permukiman menjadi teori utama dalam penelitian ini.  Tujuan Penelitian ini adalah untuk mengetahui dan menjelaskan seperti apa kecederungan perkembangan spasial permukiman di kawasan tumbuh cepat dengan studi kasus Desa Umbulmartani, Jalan kaliurang KM 14, Kecamatan Ngemplak, Kabupaten Sleman.
PENGARUH BANGKITAN PERJALANAN PEMUKIMAN BARU TERHADAP JARINGAN JALAN AKSES (Studi Kasus Perumahan Bukit Semarang Baru, Mijen Kota Semarang) Sutarto, Agung
Jurnal Teknik Sipil dan Perencanaan Vol 17, No 1 (2015): Jurnal Teknik Sipil & Perencanaan
Publisher : Semarang State University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Bukit Semarang Baru Housing Mijen is one of the housing on the outskirts of the city of Semarang that most of the population works in the city, resulting in the overload trip generation pathways roads leading to the city center of Semarang. Hence it is important for transportation planning efforts conducted as early as possible, in this case directed at the generation characteristics and travel patterns in the residential population Bukit Baru Semarang Mijen. From regression analysis found that variables that influence significantly on the number of trips is the number of families, the number of family members working and family income. While family members berusaia over 7 years, family members of the school, motorbike and car ownership less significant effect on the number of trips that occurred. From the analysis of cross-classification with respect to the chi-square value and the value of existing contingency coefficientterlihat strong relationship that the modal choice of Bukit Semarang Baru Housing residents to travel is influenced by the ownership of the vehicle, the trip destination location and income level. Bukit Semarang Baru Housing residents who use public transport to get to the day-to-day activities is relatively small (8.22% taking public passenger cars and 11.42% using bus). In general, 57.08% of the Bukit Semarang Baru Housing residents prefer to use motorcycles. Public transport is more important role for people who are shopping (27.6% by MUP and 23.9% by buses).Perumahan Bukit Semarang Baru Mijen merupakan salah satu perumahan di pinggiran Kota Semarang yang sebagian besar penduduknya bekerja di Kota Semarang, sehingga terjadi bangkitan perjalanan yang membebani jalur-jalur jalan menuju ke pusat Kota Semarang. Oleh Karena itu penting adanya usaha perencanaan transportasi yang dilakukan sedini mungkin, dalam hal ini diarahkan pada karakteristik bangkitan dan pola perjalanan penduduk di perumahan Bukit Semarang Baru Mijen. Dari analisis regresi diketahui bahwa variabel yang pengaruhnya signifikan terhadap jumlah perjalanan adalah jumlah kepala keluarga, jumlah anggota keluarga yang berkerja dan pendapatan keluarga. Sedangkan anggota keluarga yang berusaia lebih dari 7 tahun, anggota keluarga yang sekolah, kepemilikan sepeda motor dan mobil pengaruhnya kurang signifikan terhadap jumlah perjalanan yang terjadi. Dari analisis Klasifikasi silang dengan memperhatikan pada nilai chi-square dan nilai contingency coefficientterlihat ada hubungan yang kuat bahwa pemilihan moda dari penduduk perumahan Bukit Semarang Baru untuk melakukan perjalanan dipengaruhi oleh kepemilikan kendaraan, lokasi tujuan perjalanan dan tingkat pendapatan. Pendududk Bukit Semarang Baru yang menggunakan angkutan umum untuk menuju tempat aktifitasnya sehari-hari relatif sedikit (8,22% yang menggunakan mobil umum penumpang dan 11,42% menggunakan bis). Secara umum, 57,08% penduduk Bukit Semarang Baru lebih memilih menggunakan sepeda motor. Angkutan umum lebih penting peranannya bagi orang yang berbelanja (27,6% menggunakan MUP dan 23,9% manggunakan bis).
PERKEMBANGAN SPASIAL PERMUKIMAN DI KAWASAN TUMBUH CEPAT STUDI KASUS DESA UMBULMARTANI, KECAMATAN NGEMPLAK KABUPATEN SLEMAN Indrianingrum, Lulut; Azizah, Anis Nur; Prasetya, Gilang Eko; Hidayah, Nurul
Jurnal Teknik Sipil dan Perencanaan Vol 17, No 1 (2015): Jurnal Teknik Sipil & Perencanaan
Publisher : Semarang State University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The existence of the square Kaliwungu very far from the characteristics of such a square. Not only the shape, but the function of the square has also shifted away. Although the existence as public space  was still visible in the morning, but it the afternoon until evening, the square transformed into market. The function of the square as a public open space has been dominated as economic functions. From time to time the role of the square undergone many changes since the days of pre-colonial, colonial, post-colonial and current period. Changes in the role and function of the square as a public open space Kaliwungu basically occurs when the policy was issued regarding the transfer function around the market square into the parking lot of the mosque. It shows that the square as the center of the city has a strategic location that can not be separated from economic activities.Keberadaan alun-alun Kaliwungu sangat jauh dari karakteristik sebuah alun-alun tersebut. Tidak hanya bentuknya, tapi fungsi alun-alun juga sudah bergeser jauh. Walaupun pada pagi hari masih nampak keberadaannya, namun coba kita lihat pada sore hingga malam hari, alun-alun Kaliwungu berubah total menjadi pasar sore kaliwungu. Fungsi alun-alun sebagai ruang terbuka publik telah terdominasi sebagai fungsi ekonomi. Dari waktu ke waktu peran alun-alun mengalami banyak perubahan sejak zaman pra kolonial, kolonial, pasca kolonial dan masa saat ini. Perubahan peran dan fungsi alun-alun Kaliwungu sebagai ruang terbuka publik yang paling mendasar terjadi saat dikeluarkan kebijakan mengenai pengalihan fungsi pasar disekitar alun-alun menjadi tempat parkir masjid. Hal tersebut menunjukan bahwa alun-alun sebagai pusat kota memiliki letak strategis yang tidak dapat dipisahkan dengan kegiatan ekonomis.
UJI KOMPARASI PERENCANAAN TEBAL PERKERASAN LENTUR DAN KAKU METODE AASHTO 1993 (STUDI KASUS PROYEK KBK PENINGKATAN JALAN NASIONAL BANYUMANIK – BAWEN) Apriyatno, Totok
Jurnal Teknik Sipil dan Perencanaan Vol 17, No 1 (2015): Jurnal Teknik Sipil & Perencanaan
Publisher : Semarang State University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

KBK project Tujauan Road Improvement Banyumanik - Bawen besides increasing the capacity of the road, also aims to improve the quality of the pavement in the form of rigid pavement in order to overcome the damage to roads, especially in the area of incline / derivatives and around traffic light .. This is because the pavement in regional incline / derivatives or traffic light is always damage in the form of Ruts (groove). This study analyzes the thick rigid pavement CBC project is implemented and compared with if the use is thick flexible pavement (asphalt). In terms of cost requirements and the design life of pavement, the results of this study might be useful for research studies on the next, remembering of several studies found that for the same length, rigid pavement construction costs more expensive than flexible pavement, but the life of the plan rigid pavement longer than flexible pavement. Thick rigid pavement were implemented in this project is 27 cm, while the results of the analysis, using concrete K-350 and a 20-year design life of rigid pavement thickness obtained by 29 cm and when using flexible pavement with a design life of 10 years obtained a total thickness of 47.5 cm consisting of: (a). Surface layer (AC) 4 cm, (b). Base layers Over 12 cm, and (c). Under the foundation layers of 31.5 cm.Tujauan proyek KBK Peningkatan Jalan Banyumanik – Bawen selain meningkatkan kapasitas jalan, juga bertujuan untuk meningkatkan kualitas perkerasan jalan berupa rigid pavement guna mengatasi kerusakan jalan, terutama di daerah tanjakan/turunan dan di sekitar traffic light.. Hal ini disebabkan karena perkerasan jalan di daerah tanjakan/turunan maupun traffic light selalu mengalami kerusakan berupa ruts (alur). Penelitian ini menganalisis tebal rigid pavement yang dilaksanakan proyek KBK ini serta membandingkannya dengan jika yang digunakan adalah tebal perkerasan lentur (aspal). Dalam hal kebutuhan biaya dan umur rencana perkerasan jalan, hasil penelitian ini barangkali akan bermanfaat  untuk kajian pada penelitian-penelitian berikutnya, mengingat dari beberapa kajian didapat bahwa untuk panjang jalan yang sama, biaya konstruksi perkerasan kaku lebih mahal dari perkerasan lentur,akan tetapi umur rencana perkerasan kaku lebih panjang daripada perkerasan lentur. Tebal rigid pavement yang dilaksanakan di proyek ini adalah 27 cm, sementara dari hasil analisis, dengan menggunakan beton K-350 dan umur rencana 20 tahun didapat tebal rigid pavement  sebesar 29 cm dan jika menggunakan perkerasan lentur dengan umur rencana 10 tahun didapat ketebalan total 47.5 cm yang terdiri dari : (a). Lapis permukaan (AC) 4 cm, (b). Lapis Pondasi Atas 12 cm, dan (c). Lapis Pondasi Bawah 31.5 cm. 
ANALISIS KENAIKAN TEKANAN AIR PORI CLEAN SAND MENGGUNAKAN METODE CYCLIC SHEAR-STRAIN CONTROLLED Kusumawardani, Rini; ., Lashari; Nugroho, Untoro; Cahyo A, Hanggoro Tri
Jurnal Teknik Sipil dan Perencanaan Vol 17, No 1 (2015): Jurnal Teknik Sipil & Perencanaan
Publisher : Semarang State University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Liquefaction phenomenon could be analysed using strain-controlled loading method where informations about sands pore water pressure build-up were presented. Maintaining small deformation values whenever the soil was subjected to cyclic loading, this non-destructive method presents clearly the information about the increasing sands pore water pressure. It is concluded that liquefaction occurs whenever the pore water pressure reaches the same value with the soil effective stress (σ3’). Strain-controlled loading method introduces a fundamental parameter for undrained cyclic loading tests on fully saturated sands: shear strain treshhold (γt). This parameter divides the pore water pressure into two distinct zones, namely the constant pore water pressure and the increasing one. When cyclic shear strain amplitude (γ) is set up lesser than γt then pore water pressure stays constant. Contrastly, a larger set up of γ than γt results the increasing pore water pressure. Laboratory test on clean sand using relative density (Dr) 25%, 60 % and 80%, with effective pressure σ3’ = 100 kPa and frequency (f) applied 0.05 Hz and 0.1 Hz,  shows that γt = 1,5. 10-2  %. Whilst other test using Dr = 60% and f = 0.1 Hz confirms that γt = 1,5. 10-2  %  (50 ≤ σ3’ (kPa) ≤ 100) and γt = 5. 10-2  % (σ3’ = 200kPa). Last test using Dr = 60% and f = 0.05 Hz reveals γt = 1,2. 10-2  %  (50 ≤ σ3’ (kPa) ≤ 100) and γt = 2. 10-2  % (σ3’ = 200kPa).Fenomena likuifaksi dapat dianalisis menggunakan metode strain-controlled loading method. Metode ini merupakan metode non destruktif pada benda uji yang dapat menyajikan seluruh informasi kenaikan tekanan air pori secara lengkap. Metode ini dilakukan dengan cara mempertahankan nilai small deformation ketika diterapkan pembebanan secara siklis. Dari hasil pengujian diperoleh hasil bahwa likuifaksi terjadi ketika tekanan air pori mencapai nilai sebanding tekanan efektif tanah (σ3’). Metode ini menghasilkan parameter cyclic shear strain treshhold (γt). Parameter ini membagi grafik tekanan air pori menjadi dua zona yaitu zona konstan dan zona kenaikan tekanan air pori. Ketika amplitudo cyclic shear strain (γε) lebih rendah dari γt maka tidak akan ditemui kenaikan tekanan air pori. Tetapi sebaliknya jika γε > γt maka akan muncul kenaikan tekanan air pori. Berdasarkan hasil pengujian pada pasir murni dengan kepadatan relatif (Dr) sebesar 25%, 60% dan 80% dengan penerapan tekanan kekang sel σ3’ = 100 kPa dan frekuensi pembebanan (f) = 0.05 Hz dan 0,1 Hz tampak bahwa nilai γt sebesar 1,5. 10-2  %. Uji lain dengan menggunakan kondisi batas Dr = 60% dan f = 0.1 Hz menghasilkan nilai γt sebesar 1,5. 10-2  %  (50 ≤ σ3’ (kPa) ≤ 100) dan γt = 5. 10-2  % (σ3’ = 200kPa). Serta pengujian dengan kondisi batas Dr = 60% dan f = 0.05 Hz menunjukan hasil  γt sebesar 1,2. 10-2  %  (50 ≤ σ3’ (kPa) ≤ 100) dan γt = 2. 10-2  % (σ3’ = 200kPa).

Page 1 of 1 | Total Record : 8


Filter by Year

2015 2015


Filter By Issues
All Issue Vol 25, No 1 (2023): April 2023 Vol 24, No 2 (2022): Jurnal Teknik Sipil dan Perencanaan Vol 24, No 1 (2022): Jurnal Teknik Sipil dan Perencanaan Vol 23, No 2 (2021): Jurnal Teknik Sipil dan Perencanaan Vol 23, No 1 (2021): Jurnal Teknik Sipil dan Perencanaan Vol 22, No 2 (2020): Jurnal Teknik Sipil & Perencanaan Vol 22, No 1 (2020): Jurnal Teknik Sipil & Perencanaan Vol 21, No 2 (2019): Jurnal Teknik Sipil & Perencanaan Vol 21, No 1 (2019): Jurnal Teknik SIpil & Perencanaan Vol 20, No 2 (2018): Jurnal Teknik Sipil & Perencanaan Vol 20, No 1 (2018): Jurnal Teknik Sipil & Perencanaan Vol 19, No 2 (2017): Jurnal Teknik Sipil & Perencanaan Vol 19, No 1 (2017): Jurnal Teknik Sipil & Perencanaan Vol 19, No 1 (2017): Jurnal Teknik Sipil & Perencanaan Vol 18, No 2 (2016): Jurnal Teknik Sipil & Perencanaan Vol 18, No 2 (2016): Jurnal Teknik Sipil & Perencanaan Vol 18, No 1 (2016): Jurnal Teknik Sipil & Perencanaan Vol 18, No 1 (2016): Jurnal Teknik Sipil & Perencanaan Vol 17, No 2 (2015): Jurnal Teknik Sipil & Perencanaan Vol 17, No 2 (2015): Jurnal Teknik Sipil & Perencanaan Vol 17, No 1 (2015): Jurnal Teknik Sipil & Perencanaan Vol 17, No 1 (2015): Jurnal Teknik Sipil & Perencanaan Vol 16, No 2 (2014): Jurnal Teknik Sipil & Perencanaan Vol 16, No 2 (2014): Jurnal Teknik Sipil & Perencanaan Vol 16, No 1 (2014): Jurnal Teknik Sipil & Perencanaan Vol 16, No 1 (2014): Jurnal Teknik Sipil & Perencanaan Vol 15, No 1 (2013): Jurnal Teknik Sipil & Perencanaan Vol 15, No 1 (2013): Jurnal Teknik Sipil & Perencanaan Vol 14, No 2 (2012): Jurnal Teknik Sipil & Perencanaan Vol 14, No 2 (2012): Jurnal Teknik Sipil & Perencanaan Vol 14, No 1 (2012): Jurnal Teknik Sipil & Perencanaan Vol 14, No 1 (2012): Jurnal Teknik Sipil & Perencanaan Vol 13, No 2 (2011): Jurnal Teknik Sipil & Perencanaan Vol 13, No 2 (2011): Jurnal Teknik Sipil & Perencanaan Vol 13, No 1 (2011): Jurnal Teknik Sipil & Perencanaan Vol 13, No 1 (2011): Jurnal Teknik Sipil & Perencanaan Vol 12, No 2 (2010): Jurnal Teknik Sipil & Perencanaan Vol 12, No 2 (2010): Jurnal Teknik Sipil & Perencanaan Vol 12, No 1 (2010): Jurnal Teknik Sipil & Perencanaan Vol 12, No 1 (2010): Jurnal Teknik Sipil & Perencanaan Vol 11, No 2 (2009): Jurnal Teknik Sipil & Perencanaan Vol 11, No 2 (2009): Jurnal Teknik Sipil & Perencanaan Vol 11, No 1 (2009): Jurnal Teknik Sipil & Perencanaan Vol 11, No 1 (2009): Jurnal Teknik Sipil & Perencanaan Vol 10, No 2 (2008): Jurnal Teknik Sipil & Perencanaan Vol 10, No 2 (2008): Jurnal Teknik Sipil & Perencanaan Vol 10, No 1 (2008): Jurnal Teknik Sipil & Perencanaan Vol 10, No 1 (2008): Jurnal Teknik Sipil & Perencanaan Vol 9, No 2 (2007) Vol 9, No 2 (2007): Jurnal Teknik Sipil & Perencanaan Vol 9, No 2 (2007): Jurnal Teknik Sipil & Perencanaan Vol 9, No 1 (2007): Jurnal Teknik Sipil & Perencanaan Vol 9, No 1 (2007): Jurnal Teknik Sipil & Perencanaan Vol 8, No 2 (2006) More Issue