This Author published in this journals
All Journal Rekayasa Sipil
Agus Suharyanto
Jurusan Teknik Sipil Fakultas Teknik Universitas Brawijaya

Published : 10 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 10 Documents
Search

Pengaruh Faktor Internal Dan Eksternal Terhadap Kinerja Sumber Daya Manusia Pada Pabrik Kontruksi Beton Nawang Aji Sasongko; Yulvi Zaika; Agus Suharyanto
Rekayasa Sipil Vol 11, No 3 (2017)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (665.413 KB) | DOI: 10.21776/ub.rekayasasipil/2017.011.03.7

Abstract

This study aims to determine the factors that affect the performance of human resources in the factory of PT. Wijaya Karya Beton PPB Pasuruan. From all these factors will be searched the most dominant factors that influence and then proceed with corrective action. Research is needed to do to find out what are the factors that highly affect the performance of human resources, more expecialy on the human resources factory. The method used is SEM method and IPA analysis. SEM analysis is used to find out that are the factors that higher affect the performance of factory human resources. While the IPA analysis, used to determine the step of improving human resource management in the implementation of the next project. The sampling of the research was conducted by distributing questionnaires to the entire population of permanent factory employees with 35 respondents. External factors of HR are known to be a factor that is very influential on the performance of factory HR, compared with internal factors. This is evident from the SEM analysis, where internal HR factors are more dominant in affecting the HR performance of the project, especially those associated with coworkers and resources of permanent employees.
Studi Perencanaan Bangunan Utama Embung Guworejo Dalam Pemenuhan Kebutuhan Air Baku Di Kabupaten Kediri Alwafi Pujiraharjo; Suroso Suroso; Agus Suharyanto; Faris Afif Octavio
Rekayasa Sipil Vol 10, No 1 (2016)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (385.146 KB)

Abstract

Embung Guworejo direncanakan dibangun di desa Guworejo, Kabupaten Kediri, Jawa Timur. Kabupaten Kediri adalah salah satu daerah di Privinsi Jawa Timur dengan perkembangan yang cepat baik dari pertambahan jumlah penduduk maupun dalam pertumbuhan pertanian dan ekonomi. Namun perkembangan tersebut masih menemui hambatan-hambatan yang dapat mengganggu jalannya proses tersebut, yaitu adanya permasalahan kekurangan air pada saat musim kemarau untuk kebutuhan irigasi dan permasalahan banjir pada musim penghujan. Salah satu upaya dalam mengatasi permasalahan tersebut adalah dengan membangun embung (bendungan) yang dapat memberikan solusi pemanfaatan air permukaan dari daerah hulu yang dapat berfungsi sebagai tampungan air pada saat musim penghujan. Dalam kajian ini dilakukan analisis perencanaan tubuh utama embung, stabilitas rembesan, stabilitas lereng dan simulasi embung tersebut. Analisis perencanaan tubuh utama embung dilakukan guna mengetahui dimensi embung yang akan direncanakan tersebut. Perhitungan stabilitas rembesan dilakukan guna mengidentifikasi faktor kehilangan air melalui tubuh embung, sedangkan stabilitas lereng dilakukan guna mengidentifikasi faktor keamanan tubuh embung dari bidang longsor yang potensial pada bagian hulu dan hilir. Dan simulasi embung adalah untuk mengetahui apakah embung tersebut layak dibangun atau tidak. Berdasarkan hasil desain tubuh embung sesuai dengan data penunjang yang didapat, maka didapatkan bahwa tubuh embung Guworejo aman terhadap bahaya yang mungkin ditimbulkan pada bendungan dan sesuai dengan hasil simulasi embung tersebut, embung Guworejo layak dibangun karena dapat menyalurkan ketersediaan air untuk kebutuhan irigasi. 
Evaluasi Dan Perencanaan Ulang Saluran Drainase Pada Kawasan Perumahan Sawojajar Kecamatan Kedungkandang Kota Malang Suroso Suroso; Agus Suharyanto; M. Ruslin Anwar; Pudyono Pudyono; Dewa Hari Wicaksono
Rekayasa Sipil Vol. 8 No. 3 (2014)
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (457.484 KB)

Abstract

Evaluasi dan perencanaan ulang saluran drainase dilakukan dengan memperhatikan tata guna lahan, luas daerah dan intensitas hujan pada kawasan perumahan Sawojajar, dimana area kawasan tersebut sebagian besar adalah area permukiman dan perdagangan. Mengingat Kota Malang adalah kota yang terus berkembang dalam waktu yang cepat, maka dalam perencanaan digunakan perhitungan Banjir Rencana dengan kala ulang 5, 10 dan 25 tahun.Berdasarkan pada hasil evaluasi saluran, didapatkan saluran B, D’, L, dan L’ masih aman untuk debit banjir rancangan kala ulang 5 tahun, hanya saluran B dan L’ masih aman untuk debit banjir rancangan kala ulang 10 tahun dan 25 tahun, sedangkan saluran lainnya masih diperlukan perencanaan ulang karena kapasitasnya tidak memenuhi debit banjir rencana. 
Peningkatan Produktivitas Pada Proses Produksi Pracetak Dengan Penerapan Metode Lean Construction Untuk Eliminasi Waste Yunita Dwi Setyastuti; Sri Murni Dewi; Agus Suharyanto
Rekayasa Sipil Vol 11, No 3 (2017)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (724.765 KB) | DOI: 10.21776/ub.rekayasasipil/2017.011.03.3

Abstract

PT. X is one of the largest precast concrete industry in Indonesia, where to realize the vision, they continue to develop products and improve productivity performance by trying to improve quality of service, production process, and delivery product to customer with minimal cost and on time. To reach that purpose, needed Lean Construction method to eliminate waste and identify activities that can affect the products value-added.Research begins with description of the company's condition using Value Stream Mapping. Waste was identified by questionnaires, then analyzed by selection of mapping tools on Value Stream Analysis Tools and analyzed the root cause for suggestion of improvement. The results showed that the most critical waste that affectted productivity were defects (37.50%), unnecessary inventory (25%), and inappropiate processing (15%). Lead time required for overall of the process was 479.56 minutes and after improvement was reduced to 463.83 minutes by unification T.III / T.IV (fixing and tightening of the bolt plate) which reduced non-value added 15.73 minutes.
Faktor-Faktor Yang Mempengaruhi Tingkat Kepuasan Hunian Perumahan Bersubsidi Di Kota Malang Agus Inter Arma Caritas; Wisnumurti Wisnumurti; Agus Suharyanto
Rekayasa Sipil Vol 11, No 1 (2017)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (472.397 KB) | DOI: 10.21776/ub.rekayasasipil.2017.011.01.6

Abstract

The city of Malang is one of the largest cities in East Java will not be separated from the problem of housing needs. However, there are still many people who do not have homes, especially for low-income people. In meeting the needs of homes, low-income residents find it difficult to have cash in house and limited costs. Therefore, the government provides a program to facilitate the residents in meeting the needs of the house that is with the program Housing Financing Liquidity Facility (FLPP). This study aims to increase the role of stakeholders in building subsidized housing as measured by the level of satisfaction of residents in subsidized housing in Malang. Analyzes for the support used include descriptive analysis to explain the occupants' satisfaction for each housing sample. And the method used is the importance-performance analysis (IPA), Customer Satisfaction Index (CSI) and Regression. After the results of data processing, obtained the results of the level of customer satisfaction assessing the performance of subsidized housing developers in Malang included into the category either, Index Performance) totaling 67.02%. And where variable of location factor, building quality factor, and completeness factor of facility and infrastructure have positive influence to satisfaction of subsidized housing resident in Malang City. 
Analisis Monitoring Pelaksanaan Pekerjaan Proyek Pasar Rakyat Bareng Kota Malang Faris Rizal Andardi; Wisnumurti Wisnumurti; Agus Suharyanto
Rekayasa Sipil Vol 11, No 1 (2017)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (829.877 KB) | DOI: 10.21776/ub.rekayasasipil.2017.011.01.7

Abstract

Curve-S, Earned Value, and Tracking. The results of the analysis using the curve method S, week 1 to 6 project acceleration took place, while at week 17, 18, and 19 projects too late. At week 20 the work is accelerated until the last week of the 22nd week, and the duration of the last project is 22 weeks. The result of analysis using Earned Value method, week 17,18,19 late, and other week happened acceleration. Cost deviations occur in weeks 1-4,6,7,15,16,17, and 18. To estimate the final cost of the total final cost, and the prediction for the total project completion time is 22 weeks. The analysis result using tracking shows that the actual duration is 158 days, and the estimated duration is 2 calendar days. The project prediction is completed on January 28, 2017. The total cost incurred is less than the final project cost plan. So the recommendation of the appropriate monitoring method for the People's Market is Tracking. 
Integrasi Sistem Data Kecelakaan Lalu Lintas Di Kabupaten Jember Kuntoro Bayu Ajie; Harnen Sulistio; Agus Suharyanto
Rekayasa Sipil Vol 11, No 1 (2017)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (560.287 KB) | DOI: 10.21776/ub.rekayasasipil.2017.011.01.8

Abstract

The rapid development of technology can help people solve their problems faced every day. One of them is the problem in transportation sector related traffic accident data often occur in Jember. Many agencies and institutions that play a role, making the existing data to be different. Traffic accident report from police and patient report in emergency room from hospital is collected from 2012 to 2014. The result of this research is a good integration traffic accident database system between police and hospital using PostgreSQL, an information system about traffic accident recording with the location can be presented in digital map using Microsoft Visual Basic 6.0, and a recommendations to improve the accuracy of existing traffic accident data. 
Studi Dampak Rencana Reklamasi Di Teluk Lamong Propinsi Jawa Timur Terhadap Pola Arus Pasang Surut Dan Angkutan Sedimen Alwafi Pujiraharjo; Arief Rachmansyah; Pudyono Pudyono; Agus Suharyanto; Yatnanta Padma Devia; Dwi Ratna Nur F.
Rekayasa Sipil Vol 7, No 2 (2013)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (659.115 KB)

Abstract

Rencana pengembangan Teluk Lamong yaitu peningkatan kapasitas bongkar muat dan terminal peti kemas, pengembangan water front city, dan terminal multi purpose dikhawatirkan akan berdampak negative terhadap pola arus dan sedimentasi di Teluk Lamong, kondisi lingkungan, dan kondisi social masyarakat di sekitar Teluk Lamong. Dampak dari sedimentasi ini dikhawatirkan akan menyebabkan pendangkalan alur pelayaran sungai di Selat Madura. Selain itu juga dikhawatirkan akan mengganggu habitat satwa di Pulau Galang yang merupakan wilayah konservasi. Penelitian ini hanya mengkaji dampak dari rencana reklamasi terhadap perubahan pola arus pasang surut dan sedimentasi di Teluk Lamong. Studi dilakukan dengan menggunakan bantuan simulasi model numerik untuk memprediksi perubahan pola arus dan perubahan pola angkutan dan endapan sedimen di Teluk Lamong dengan adanya reklamasi. Data yang diperlukan dalam penelitian ini adalah data batimetri dan topografi Teluk Lamong, data karakteristik sedimen, data detail rencana reklamasi, data debit sungai dan data pasang surut. Data topografi, batimetri dan detail rencana reklamasi digunakan sebagai input geometri Teluk Lamong. Sedangkan data pasang surut, karakteristik sedimen, dan debit sungai digunakan sebagai kondisi batas dalam simulasi pola arus dan sedimen. Analisis hasil simulasi dilakukan terhadap 5 skenario model yang dipilih. Dari hasil simulasi diketahui pola arus pasang surut dan pola penyebaran sedimen di Teluk Lamong. Berdasarkan hasil simulasi ini juga diperoleh prediksi ketebalan endapan sedimen di Teluk Lamong berikut dampaknya terhadap alur pelayaran Selat Madura. Hasil simulasi menunjukkan bahwa perlu perbaikan bentuk, posisi dan luas area reklamasi terhadap rencana reklamasi yang sudah ada. Perbaikan bentuk area reklamasi disarankan mengikuti Model 5. 
Evaluasi Efektifitas Implementasi Lajur Sepeda Motor (Studi Kasus Jalan Raya Darmo Kota Surabaya) Asep Akbar Hikmana; Ludfi Djakfar; Agus Suharyanto
Rekayasa Sipil Vol. 8 No. 3 (2014)
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (237.621 KB)

Abstract

Kota Surabaya merupakan kota terbesar kedua setelah Ibu Kota Jakarta. Sebagai kota pendidikan dan industri, jalan-jalan yang ada di Surabaya termasuk kota yang mengalami kemacetan. Untuk menekan terjadinya kecelakaan lalu lintas khususnya yang menimpa pengendara sepeda motor di Surabaya, maka dibangunlah jalur khusus, dengan harapan jalur khusus tersebut dapat meminimalisir terjadinya kecelakaan lalu lintas dan untuk mewujudkan kenyamanan dan perlindungan dari kecelakaan bagi pengendara roda dua. Penelitian ini bertujuan untuk Evaluasi Efektivitas Implementasi Lajur Sepeda Motor menggunakan metode Analisis Statistika Deskriptif serta metode Importance Performance Analysis (IPA) dan metode SWOT untuk mengetahui kinerja dan strategi. Hasil penelitian menunjukka bahwa implementasi penggunaan lajur khusus sepeda motor pada ruas Jalan Raya Darmo Surabaya memberikan pengaruh positif terhadap kelancaran lalu lintas. Kinerja jalan pada ruas Jalan Raya Darmo Surabaya cenderung stabil, dengan LOS C baik sebelum maupun sesudah dilakukannya penerapan lajur khusus sepeda motor. Berdasarkan persepsi pengguna lajur khusus sepeda motor pada ruas Jalan Raya Darmo, tingkat kesesuaian efektivitas implementasi lajur khusus sepeda motor di Jalan Raya Darmo sudah cukup optimal dengan 1,13 serta pengguna merasa puas dengan pelayanan dan kinerja lajur khusus di ruas Jalan Raya Darmo. Berdasarkan hasil perhitungan analisis SWOT dan IFAS EFAS, strategi pengembangan terdapat pada kuadran IV yang artinya strategi pengembangan internal dan eksternal dapat dilakukan secara bersamaan tanpa harus menunggu penyelesaian program lain secara bertahap. 
Prediksi Titik Banjir Berdasarkan Kondisi Geometri Sungai Agus Suharyanto
Rekayasa Sipil Vol. 8 No. 3 (2014)
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (508.431 KB)

Abstract

Banjir merupakan salah satu fenomena alam yang terjadi pada saat musim hujan. Pada umumnya banjir terjadi karena ketidakmampuan sungai dalam menampung debit aliran permukaan yang masuk kedalam sungai. Kemampuan sungai dalam menampung debit aliran permukaan disebut dengan kapasitas aliran sungai. Besar kecilnya kapasitas aliran sungai tergantung dari dimensi penampang melintang sungai dan kecepaatan aliran sungai. Kecepatan aliran sungai tergantung dari kemiringan memanjang dasar sungai, kekasaran badan sungai, dan jari-jari penampang basah sungai. Dengan kata lain kapasitas aliran sungai tergantung dari geometri sungai. Apabila debit aliran permukaan yang masuk ke sungai melebihi kapasitas aliran sungai, maka akan terjadi luapan aliran dari sungai. Luapan aliran sungai inilah merupakan salah satu penyebab terjadinya banjir di suatu wilayah. Analisis debit aliran permukaan yang terjadi akibat curah hujan yang turun di suatu wilayah dilakukan dengan HHS Nakayasu. Penelusuran banjir yang di badan sungai dianalisa dengan persamaan kontinuitas dua dimensi. Hasil analisis menunjukkan bahwa ada tiga lokasi yang luapan aliran sungai yang disebabkan oleh tinggi aliran melebihi tanggul sungai. Konsekuensinya, lokasi sekitar titik luapan akan terjadi banjir. Bedasarkan data lapangan, lokasi-lokasi yang terjadi luapan memang terjadi banjir pada saat terjaddi hujan pada hari dan tanggal yang sama.Â