Rian Trikomara Iriana
Unknown Affiliation

Published : 11 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 11 Documents
Search

Analisa Besarnya Kontribusi Biaya Tak Langsung Terhadap Harga Jual Rumah Pada Perumahan Jenis Cluster Tipe 45 Di Kota Pekanbaru (Studi Kasus : Perumahan Mini Cluster Nirwana Cipta) Iriana, Rian Trikomara
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 2, No 1 (2015): Wisuda Februari Tahun 2015
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The growth of property business in Pekanbaru creates a good economic growth. In 2011, this sector gives 27,72% income and improve the house demand indirectly. People ask for a good, healthy, safe, and well organized housing for midle people. Mini cluster is one of the choice for the housing, since this type of house combine a simple house with cluster concept, fully equipped with infrastructure facility and a full utility. There are two main fund in building a housing; direct and indirect costs. Direct costs is costs that we need for buiding the physic of the house, while the other costs is costs that we need for facility costs, legal permission costs, planning and economic costs. Indirect costs will be paid by buyers. So, the price paid by the buyers include facility building, legal permission, planning, and economic costs. In this research, writer has identified that the contribution of indirect costs give a big impact in house price and the profit. In percentage, the contribution of indirect costs is bigger than the profit. We can see that from 45/112 type house has 65, 75% for direct costs, 19% indirect costs, and 15, 25% for the profit. While for 45/143 type house, the percentage is 64, 13% for direct costs, 20, 19% for indirect costs, and 15, 68% for the profit. Facilities offered in mini cluster Nirwana Cipta housing are neighborhood street, closed drainage, small park in every unit, street lamp, and gate (one gate system).Key words : direct costs, indirect costs, selling price house, mini cluster.
Analisis Biaya Pemakaian Alat Berat Pada Proyek Rekontruksi Jalan Batas Kota Pariaman – Manggopoh Kabupaten Padang Pariaman Provinsi Sumatera Barat Syauki, Ilham Ahmad; Iriana, Rian Trikomara; Malik, Alfian
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 5, No 1 (2018): Wisuda April Tahun 2018
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This research is aimed to analyze and identify the minimum cost of heavy equipment usage on the reconstruction Pariaman-Manggopoh border area Padang Pariaman Regency West Sumatera Province and to give the alternative manufacture and the effective enforcement method in the use of excavator. The calculation is analyzed using Bina Marga method. Based on the result, it is found that building the Aggregate Foundation Layer class A needs minimum cost Rp. 1.587.698.428,60 and building the Asphalt Pavement Layer needs minimum cost Rp. 4.954.643.081,75. The project enforcement can be done through several manufacture alternatives.Keywords : cost analysis, productivity, heavy equipment, and enforcement method
Analisis Produktivitas Pekerjaan Struktur Beton Bertulang Pada Proyek Gedung Polda Riau 2018 Putra, Muhammad Oki Pirdana; Iriana, Rian Trikomara; Malik, Alfian
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 6 (2019): Edisi 1 Januari s/d Juni 2019
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Productivity affects the project progresses between actual field and the planned schedule of the construction project. Therefore, the level of productivity at crisis activity in a schedule planning project which in this case is structure project needs to be analyzed. This study aims to analyze actual productivity on the field and determine the factors affecting productivity towards the construction project of Regional Police Department of Riau. The value of actual work productivity is obtained through direct observation on the field using the method of Time Study. The data is analyzed and converted into field index, then compared with SNI 7394 : 2008 index as standard reference. Base on result of calculation, the work productivity value of plate, column, and beam formwork respectively are 19.99 m2/hour, 10.91 m2/hour, and 4.89 m2/hour with their index values respectively are 0.10 MH, 0.26 MH, and 0.37 MH. Next, the work productivity value of plate, column, and beam reinforcement respectively are 516.77 kg/hour, 187.61 kg/hour, and 187.91 kg/hour with their index values respectively are 0.01 MH, 0.03 MH, and 0.02 MH. For plate, column, and beam casting, their work productivity value respectively are 13.21 m3/hour, 12.98 m3/hour, and 13.53 m3/hour with their index value respectively are 0.28 MH, 0.24 MH, and 0.26 MH. In conclusion, the field index value are less compared than SNI 2008 index.Keywords: Productivity, Crisis activity, Time study, Index, SNI 7394 : 2008
PERBANDINGAN RENCANA ANGGARAN BIAYA PADA PERHITUNGAN TEBAL LAPIS TAMBAH (OVERLAY) DENGAN METODE PD T-05-2005-B DAN ASPHALT INSTITUTE MS-17 J.M, Satria Agung Mulia; Iriana, Rian Trikomara; Shalahuddin, M
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 4, No 1 (2017): Wisuda Februari Tahun 2017
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The purpose of this study is to analyze the budget plan obtained from the overlay calculation using Pd T-05-2005-B and the Asphalt Institute MS-17. Studies were conducted on roadsections of Jurong-Mandau in Bengkalis, regency using design life of 5 years and 10 years with traffic development rate 5.165%, which is projected from the linear regression. Theresults of this study with Pd T-05-2005-B methods design life of 5 years, segment 1 sta 00+000 s/d 00+500 by 7.770 cm, segment 3 sta 02+500 s/d 03+000 by 8.467 cm with a total cost of Rp. 2,873,439,898.00 and a design life of 10 years obtained overlay, segment 1 sta 00+000 s/d 00 + 500 by 10.624 cm, segment 3 sta 02+500 s/d 03+000 by 11.201 cm, the segment 9 sta 06+000 s/d 06+500 by 3,810 cm with a total cost of Rp. 4,003,870,931.00.And then with Asphalt Institute MS-17 method design life of 5-year and 10 years does not require an overlay and budget plan calculations, because from the calculations obtained overlay value is 0. Based on the results of the study indicate that working on overlay design life of 10 years is more economis and effective than the design life of 5 years.Keywords: Overlay, Budget Plan, Design Life, Pd T-05-2005-B Method, Asphalt Institute MS-17 Method.
VARIAN TEBAL LAPIS TAMBAH (OVERLAY) BERDASARKAN FAKTOR KESERAGAMAN (FK) PADA JALAN KELAKAP TUJUH DUMAI-RIAU Elianora Elianora; Ermiyati Ermiyati; Rian Trikomara Iriana
Prosiding SNST Fakultas Teknik Vol 1, No 1 (2017): PROSIDING SEMINAR NASIONAL SAINS DAN TEKNOLOGI 8 2017
Publisher : Prosiding SNST Fakultas Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (547.933 KB)

Abstract

Salah satu cara untuk meningkatkan atau mengembalikan kemampuan dan pelayanan jalan adalah dengan melakukan tebal lapis tambah (overlay). Pada penelitian ini perencanaan overlay secara non destruktif berdasarkan lendutan balik, dilakukan menggunakan Manual Desain Perkerasan Jalan Nomor 02/M/BM/2013. Hasil analisis menunjukan nilai ekivalen beban sumbu standar selama umur rencana 10 tahun sebesar 6.546.500,63 ESA. Dengan melakukan pembagian segmen untuk mendapatkan variasi faktor keseragaman (FK) dan tebal lapis tambah (overlay)  yang berbeda  maka diperoleh hasil pada segmen 1 Sta 00+000 s/d Sta 00+550 FK 24% overlay 4,1 cm, segmen 2 Sta 00+550 s/d Sta 01+200 FK 19% overlay 7,2 cm, segmen 3 Sta 01+200 s/d Sta 01+750 FK 19% overlay 8 cm dan segmen 4 Sta 01+750 s/d Sta 02+300 FK 11% overlay 9 cm.Kata kunci:  lapis tambah, lendutan balik, Faktor Keseragaman
Analisis Lokasi Dan Jumlah Stasiun Pemadan Kebakaran Kota Pekanbaru Jasriadi Jasriadi; Rian Trikomara Iriana; Sri Djuniati
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 2, No 1 (2015): Wisuda Februari Tahun 2015
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Fire Company is an active protektif system in building structure. Pekanbaru is an area which is gristle to fire danger. Population of Pekanbaru City pertained is multitude, this affect to movement systems and development expanding everywhere. Location of effective post is an effort to minimize fire impact which possibly will happened. The research methodology consists of three phases: data collection, network analisys using network analyst extention, and discussion. Analyse optimation of station which have in Pekanbaru City conducted by using principle of service area to the stations which have been placed in one location. Service area in this study is defined as the minimum area that can be reached by fire station on the fire occur. Service area is generated using the network analisys extention in ArcGIS software. The results of this study indicate that stations still are not able to cover all of Pekanbaru areas. Station allocated by government in this time not enough served all region of Pekanbaru when at any times fire occur. On scenario 1-4 (existing station scenario with assumption speed of extinguisher car is 50-65 km/hour), stations cannot include all region of Pekanbaru. It means that Pekanbaru city still requires the addition of a new station building allocated to the areas not yet covered service area that is counted 5 (five) new stations.Keywords: optymal location, network analyst, service area , fire station
Analisis Biaya Dan Produktivitas Pemakaian Alat Berat Pada Kegiatan Pembangunan Jalan Akses Siak IV Pekanbaru Devid Nugraha; Rian Trikomara Iriana; Sri Djuniati
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 5, No 1 (2018): Wisuda April Tahun 2018
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Road construction requires heavy equipment in its work, one of them is road layer. Heavy equipments which currently use is dump truck, excavator, motor greder, water tank truck, tandem roller and wheel loader. The number of heavy equipment to itemized work selected heap, Class B aggregate and A class aggregate are 1 unit excavator, 1 unit wheel loader, 15 unit dump trucks, 1 unit grader motor, 2 unit tandem rollers, 1 unit water tank, selected heap work which use the provisions of the owner is 9 days and the contractor 11 days, class B aggregate work using the provisions of the owner are 7 days and 9 days contractor, A class aggregate work using the provisions of the owner are 5 days and 7 days contractor. The differences in the cost of heavy equipment is Rp.121.650.532 or higher by using contractor's heavy equipment. To determine the heavy equipment with a more efficient cost with a saving percentage of 12.93% then, the contractor must meet the provisions made by the owner with the economical life tool, the condition of the machine and eligible labor.Keywords : Cost analysis, heavy equipment, productivity, road layer
Analisa Besarnya Konstribusi Biaya Tak Langsung terhadap Harga Jual Rumah Pada Perumahan Jenis Cluster Tipe 45 Di Kota Pekanbaru (Studi Kasus : Perumahan Mini Cluster Nirwana Cipta) Sepri Nardi; Rian Trikomara Iriana
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 1, No 2 (2014): Wisuda Oktober Tahun 2014
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The growth of property business in Pekanbaru creates a good economic growth. In 2011, this sector gives 27,72% income and improve the house demand indirectly. People ask for a good, healthy, safe, and well organized housing for midle people. Mini cluster is one of the choice for the housing, since this type of house combine a simple house with cluster concept, fully equipped with infrastructure facility and a full utility.There are two main fund in building a housing; direct and indirect costs. Direct costs is costs that we need for buiding the physic of the house, while the other costs is costs that we need for facility costs, legal permission costs, planning and economic costs. Indirect costs will be paid by buyers. So, the price paid by the buyers include facility building, legal permission, planning, and economic costs.In this research, writer has identified that the contribution of indirect costs give a big impact in house price and the profit. In percentage, the contribution of indirect costs is bigger than the profit. We can see that from 45/112 type house has 65, 75% for direct costs, 19% indirect costs, and 15, 25% for the profit. While for 45/143 type house, the percentage is 64, 13% for direct costs, 20, 19% for indirect costs, and 15, 68% for the profit. Facilities offered in mini cluster Nirwana Cipta housing are neighborhood street, closed drainage, small park in every unit, street lamp, and gate (one gate system).Key words : direct costs, indirect costs, selling price house, mini cluster.
Evaluasi Risiko Konstruksi Pada Proyek Pembangunan Sadira Plaza Dan Tangram Hotel Pekanbaru Ardi Wiranata Hutasoit; Alfian Malik; Rian Trikomara Iriana
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 5, No 1 (2018): Wisuda April Tahun 2018
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Risk is an uncertain condition or event. A risk has a cause and if the risk occurs, there will be consequences so that an identifiable system must be established to reduce it to a minimum to the acceptable limit. The focus of this research is the risk of the construction of Sadira Plaza and Tangram Hotel Pekanbaru. The purpose of the research is to know the risk variables that affect the project and the design formula of risk management strategy. The research step with the distribution of questionnaires consisting of 9 variables or 50 risk indicators compiled with the dichotomy scale to the employees involved in the project is PT. Waskita Karya (Persero) Tbk as the contractor and PT.Target Optimal System Solutions as Construction Management Consultant obtained a total of 29 respondents with a valid questionnaire. Then the results of the questionnaire processed by using Cochran Q-Test, obtained 6 variables or 17 indicators that cause project risk. Furthermore, to analyze the fish bone diagram used to see the process of project implementation activities so as to know the root cause of the risk and make the formulation of the risk of development project of Sadira Plaza and Tangram Hotel Pekanbaru.Keywords: Fishbone Diagram, Risk, Dichotomy Scale, Cochran Q-Test
Analisis Pengaruh Biaya Fasilitas Terhadap Harga Jual Rumah Pada Perumahan Jenis Cluster Di Kota Pekanabru (Studi Kasus : Perumahan Harmoni Residence) Vemby Mailino; Rian Trikomara Iriana
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 1, No 1 (2014): Wisuda Februari Tahun 2014
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Construction and property business prospects in the city of Pekanbaru is still quite promising when viewed by 2011 the building sector/construction accounted for the largest Pekanbaru City Regional Income ie 27.71 % of the other sectors. As the economic development increase rapidly in Pekanbaru indirectly cause an increase of housing need that is no exception for the luxury housing for the middle and upper classes. Housing type of cluster to be one of the preferred type of luxury residential facility offers infrastructure, facilities and utilities are complete. In a facilities construction cost housing projects included in indirect costs, while the construction of housing units included in direct costs. The cost of the facility housing development project will be charged to the home buyer on the housing. In other words, the price paid by the buyer during the purchase of the house was added to the cost of construction of such facilities. In this study identified what are the facilities offered by the Residence Housing harmony and how much influence the cost of the facility to the price of the total cost of construction per each type of home. The results of this study have been identified as for the facilities offered by The Harmoni Residence cluster housing types are roads, drainage, club house, swimming pool, green garden, fountain, office management, shade trees, street lighting, garbage cans, doors gate (one gate system), as well as CCTV security post. As well known the availability of the facility , facility costs charged to the type of 65/112 is equal to 7.70%, type 105/154 of 5.59 %, and type 135/180 of 4.62 % of the selling price per house type . Keywords : Direct Cost , Indirect Cost , Cluster , Facilities , Housing