Claim Missing Document
Check
Articles

Found 4 Documents
Search
Journal : Jurnal Teknik Sipil

ANALISIS KARAKTERISTIK DAN KEBUTUHAN RUANG PARKIR PADA AREAL PUSAT PERBELANJAAN SUZUYA MALL BANDA ACEH Muhammad Isya; Cut Mutiawati; Handayani Handayani
JURNAL TEKNIK SIPIL Vol 3, No 2 (2014): Volume 3, Nomor 2, Januari 2014
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Suzuya Mall Banda Aceh is one of the shopping center in the city of Banda Aceh. This mall is located onJln. Teuku Umar street. Daily activities of community cause the increasing of trip, including the attraction trip to this mall. However, the availabililty of parking space can not be accommodated by the mall, especially during the peak hours. The purpose of this study are to analyze the characteristics, capacity and demand parking of Suzuya mall.The results analysis of this study are showed: for motorcycles, peak hour vehicle arrival is on Saturday 20.00-21.00 pm at 285 veh/h with a volume of 1751 veh/day. The average length of the highest parking on Sundays at 0.96 h/veh. The highest accumulation on Sunday of 219 veh between 16:00-17:00 pm. The highest parking capacity on Thursday by 517 Unit Parking Space.
PENYEBAB PERUBAHAN DESAIN RUMAH STANDAR OLEH KONSUMEN (STUDI KASUS: PERUMAHAN VILLA CITRA DI BUMI PERMATA LAMNYONG) Cut Mutiawati; Buraida Buraida
JURNAL TEKNIK SIPIL Vol 2, No 1 (2012): Volume 2, Nomor 1, September 2012
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Consumer seldom redesign their property from developer. Therefor need a study to get dominant factors cause of redesign. The location for this research is Villa Citra and Bumi Permata Lamnyong Residence in Banda Aceh and Aceh Besar. Based on research, the dominant factor cause of redesign in Bumi Permata Lamnyong Residence are house size (type 36 and type 70), “availibility of fund” (type 45 and tipe 50) and need of family (type 130). the dominant factor cause of redesign in Villa Citra residence are need of family ( type 36), amount of room (type 50), house size (type 70) and esthetics factor (type 130).Keywords : Redesign, houseAbstrak: Pembeli (konsumen) rumah sering melakukan perubahan desain rumah yang dibeli dari developer. Untuk itu perlu suatu studi yang bertujuan untuk mencari faktor-faktor dominan yang menjadi penyebab perubahan desain yang sering dilakukan oleh konsumen perumahan. Penelitian dilakukan pada komplek perumahan Villa Citra dan Bumi Permata Lamnyong yang berlokasi di wilayah Banda Aceh dan Aceh Besar. Hasil diperoleh faktor dominan penyebab terjadinya perubahan desain untuk masing-masing tipe rumah pada Perumahan Bumi Permata Lamnyong  adalah perubahan karena ukuran ruang (tipe 36 dan tipe 70), perubahan karena ketersediaan dana (tipe 45 dan tipe50) dan perubahan karena keinginan keluarga (tipe 130). Sedangkan pada Perumahan Villa Citra faktor yang dominan adalah perubahan karena keinginan keluarga (tipe 36), karena jumlah ruang (tipe 50), karena ukuran ruang (tipe 70) dan karenaestetika/keindahan/tampak (tipe 130).Kata kunci : perubahan desain, rumah standar.
STUDI KARAKTERISTIK PEMILIHAN MODA ANGKUTAN MAHASISWA MENUJU UNIVERSITAS SYIAH KUALA BANDA ACEH Lulusi Lulusi; Fitrika Mita Suryani; Cut Mutiawati; Teuku Mustaqim Waqas
JURNAL TEKNIK SIPIL Vol 4, No 3 (2015): Volume 4, Nomor 3, Mei 2015
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PENYEBAB COST OVERRUN PADA PROYEK KONSTRUKSI Cut Mutiawati
JURNAL TEKNIK SIPIL Vol 1, No 3 (2012): Volume 1, Nomor 2, Mei 2012
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Cost control is one of the important thing in construction project. If the cost of construction is uncontrollable, it will cause cost overrun. Cost overrun can be caused by many factors such as material, man power and heavy equipment cost. This research want to investigate the dominant factor that cause cost overrun. Data was collected by  questionaires that consists of 66 Variables. The variables were divided in 3 phases, 33 variables in planning phase, 23 variables in implementation phase and 2 variables in maintenance phase. Assesment of dominant level on this research were carried out in 5 measurement scale: 1 (very not dominan), 2 (less dominant), 3 (rarely dominant), 4 (dominant)  and 5 (very dominant). The  questionaires were distributed to contractor  grade 5, 6 and 7 that execute the construction project in Aceh. Data analysis were done by calculating the  average value (mean). The results shown that there are 51 variables cause of cost overrun with “dominant”  category  consisting of 13 variables at planning phase, 37 variables at implementation phase and 1 variable at maintenance phase with mean of 3,75 ≥ x ≥ 2,5. While 15 variables is categoried as " less dominant". Further more, this research found that there are additional 18 cost overrun variables beyond the questionaires.Keywords : Construction Project, Cost Overrun, ContractorAbstrak: Pengendalian biaya adalah salah satu hal penting dalam proyek konstruksi. Bila biaya konstruksi ini tidak dapat dikendalikan, maka akan menyebabkan cost overrun atau pembengkakan biaya.  Peningkatan biaya dapat disebabkan oleh banyak faktor seperti biaya material, biaya upah dan biaya peralatan berat yang tidak terkontol. Penelitian ini bermaksud  untuk mengetahui penyebab dominan terjadinya cost overrun. Pengumpulan data dilakukan dengan metode penyebaran kuesioner yang berisi 66 variabel penyebab cost overrun. Variabel-variabel tersebut dibagi dalam 3 tahapan yaitu tahap perencanaan, tahap pelaksanaan dan tahap pemeliharaan. Penilaian dilakukan dalam 5 skala pengukuran dari 1 (sangat tidak dominan) sampai 5 (sangat dominan). Kuesioner diisi oleh perusahaan kontraktor grade 5, 6 dan 7 yang menangani proyek konstruksi di Aceh. Analisa data dilakukan dengan cara mencari nilai rerata (mean). Hasil pengolahan data diperoleh variabel yang “dominan” menjadi penyebab cost overrun sebanyak 51 variabel dengan rincian 13 variabel pada tahap perencanaan, 37 variabel pada tahap pelaksanaan dan 1 variabel pada tahap pemeliharaan dengan nilai mean 3,75 ≥ x  ≥ 2,5. Sedangkan 15 variabel termasuk dalam kategori “cukup dominan”. Lebih lanjut terdapat 18 variabel lain yang menjadi penyebab cost overrun selain variabel yang ada pada kuisioner.Kata kunci : Proyek Konstruksi, Cost Overrun, Kontraktor