Claim Missing Document
Check
Articles

Found 23 Documents
Search

REKLAMASI LAHAN BEKAS PENAMBANGAN BATUGAMPING KAB. TUBAN, PROVINSI JAWA TIMUR Avellyn Shinthya Sari; Ahmad Betras Ediwana; Arlida Dwi Pangestika
Jurnal Sumberdaya Bumi Berkelanjutan (SEMITAN) Vol 1, No 1 (2019): Prosiding
Publisher : Institut Teknologi Adhi Tama Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31284/p.semitan.2019.822

Abstract

Tuban Regency is a provider of raw materials for limestone and clay for PT. Semen Indonesia (Persero) Tbk in Tuban. Limestone mining caused by environmental damage. Therefore it is expected to be able to improve or improve the benefits of the original land for mining, so that the negative impact of mining activities can reduce.  The results of the research can be published in 2014-2018, plants planted with 130,186 are in limestone quarries. However, the area studied is only on the limestone floor area which is 7.66 ha, where the land is planted with staple plants (teak trees), fillers (johar trees), edge plants (mahogany and trembesi trees) and intercropping plants (lamtoro tree). On a land area of 7.66 hectares, it has been planted with 14,444 plants.Kabupaten Tuban merupakan penyedia bahan baku berupa batu kapur dan tanah liat untuk PT. Semen Indonesia (Persero) Tbk yang ada di Tuban. Penambangan batugamping menyebabkan terjadinya kerusakan lingkungan. Oleh karena itu diharapkan agar memperbaiki atau mengembalikan kemanfaatan tanah semula akibat usaha-usaha penambangan, sehingga dampak negatif dari kegiatan penambangan dapat berkurang. Dari hasil penelitian dapat dijelaskan bahwa reklamasi dari tahun 2014-2018, tanaman yang sudah ditanam sejumlah 130.186 yang berada pada quarry batu gamping. Namun daerah yang di teliti hanya pada bagian lantai batugamping yang luasnya 7,66 Ha, dimana pada lahan tersebut di tanami dengan tanaman pokok (pohon jati), tanaman pengisi (pohon johar), tanaman tepi (pohon mahoni dan trembesi) dan tanaman sela (pohon lamtoro). Pada lahan seluas 7,66 Ha ini sudah di tanami sejumlah 14.444 tanaman.  
STUDI KASUS EFEK EPIDEMI COVID - 19 TERHADAP PENAMBANGAN DAN KARYAWAN PT. PERTAMINA DI MIGAS CEPU KAB. BOJONEGORO, JAWA TIMUR Fitri Indah Dwi Suci; Priskilla Latekay; Abdan Said Halim Limtar; Wendy Muhammad Ibnu Farid; King Christ Majesty Spencer Assa; Iksan Iksan; Angga Pratama Putra Kobba; Moch. Fahni Mahindra; Martinus Lousiano Geri; Poppy Paulina Miru; Avellyn Shinthya Sari
Jurnal Sumberdaya Bumi Berkelanjutan (SEMITAN) Vol 2, No 1 (2020): Prosiding
Publisher : Institut Teknologi Adhi Tama Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31284/p.semitan.2020.988

Abstract

PPSDM Migas Cepu merupakan tempat proses pengelohan minyak yang ada di daerah cepu, selain itu tempat ini juga digunakan sebagai tempat pelatihan untuk mendapatkan berbagai macam sertifikat yang berhubungan dengan perminyakan dan pertambangan. Sehingga dapat dikatakan PPSDM Migas Cepu ini merupakan tempat penting dalam dunia perminyakan di indonesia selain itu PPSDM Migas ini juga memiliki tempat pengeborannya sendiri yang berada di daerah Bojonegoro Disinilah kami akan membahas nasib pekerja PPSDM Migas Semenjak terjadinya pandemi covid-19 ini.
KAJIAN SISTEM HIDROGEOLOGI DAN RANCANGAN MINE DRAINAGE PT. BUKIT KALISARI ARTA MAKMUR KAB. SITUBONDO PROVINSI JAWA TIMUR Avellyn Shinthya Sari; Arie Fadjar Saputro
Prosiding Seminar Teknologi Kebumian dan Kelautan (SEMITAN) Vol 3, No 1 (2021): Prosiding
Publisher : Institut Teknologi Adhi Tama Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31284/j.semitan.2021.1983

Abstract

Perusahaan PT. Bukit Kalisari Arta Makmur merupakan salah satu perusahaan yang bergerak pada bidang pertambangan dengan komoditas utamanya ialah batuan andesit terletak di Desa Kalisari Kecamantan Banyuglugur Kabupaten Situbondo Provinsi Jawa Timur. Kegiatan penyaliran merupakan hal penting dalam salah satu kegiatan pertambangan dimana dalam kegiatan penyaliran ini perlu dilakukannya kajian untuk mengetahui kondisi pada lapangan. Tujuan dilakukannya penelitian ini adalah untuk mengkaji dan merancang metode penyaliran yang tepat untuk diterapkan pada PT. Bukit Kalisari Artha Makmur dengan mengetahui keadaan pada lapangan maka akan diperoleh hitungan serta desain penyaliran yang cocok pada kondisi lapangan tersebut. Metode penelitian dengan melakukan metode kuantitatif yang meliputi: data topografi,data kondisi lapangan dan data curah hujan. Berdasarkan pengambilan data, perhitungan serta pengolahan penyaliran yang diterapkan antara lain pembuatan paritan, sump, dan settling pond hasil yang didapatkan intensitas curah hujan maksimum pada lokasi sebesar 42,491 mm/jam, debit air hujan sebesar 54334,03 m3/hari dan debit air limpasan sebesar 4531,458 m3/hari, dari hasil tersebut maka debit total air yang masuk adalah sebesar 58.865,488 m3/hari. Pada kolam pengendapan lumpur  debit air yang masuk kedalam kolam sebesar 0,468 m3/detik dengan kerapatan partikel padatan sebesar 1900 kg/m3 dan persen padatan sebesar 20% sedangkan presentasi padatan sebesar 97,02% maka pengerukan lumpur dilakukan dengan interval selama 11 hari sekali. Dari hasil pengamatan kondisi topografi pada lapangan relatif datar sehingga air relatif tidak menggenang , kapasitas saluran drainase telah memadai sehingga cukup untuk menampung air
STUDI KASUS PENOLAKAN WARGA TERHADAP PENGEBORAN BARU PT LAPINDO BRANTAS KAB. SIDOARJO, PROVINSI JAWA TIMUR Marshellino Azry Gowarno; Wilbert Hamongan purba; Seftian Mahendra; Ahmad Jefri Al Bukhari; Anastasia Nadia Gaidah; Osfaldo Try Sa’ban; Nakhlah Amiroh Risyda Chaq; Arya Fernando; Sherina Manopo; Ikal Don Lelewa; Avellyn Shinthya Sari
Jurnal Sumberdaya Bumi Berkelanjutan (SEMITAN) Vol 2, No 1 (2020): Prosiding
Publisher : Institut Teknologi Adhi Tama Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31284/p.semitan.2020.1078

Abstract

Pengeboran merupakan salah satu kegiatan untuk membuat lubang yang bertujuan untuk mencapai meterial yang ada didalam bumi, demi kepentingan tertentu. PT Lapindo Brantas merupakan suatu perusahaan kontraktor kontrak kerjasama yang ditunjuk oleh BPMIGAS untuk melakukan pengeboran minyak dan gas bumi di indonesia. Indonesia sendiri memiliki banyak titik yang berpotensi memiliki kandungan minyak bumi dan gas bumi yang dimana titik-titik tersebut tersebar di pulau-pulau indonesia. Proses pengeboran disuatu wilayah akan memberikan dampak positif dan negatif pada sekitarnya sehingga diperlukan tahapan-tahapan yang perlu dilakukan sebelum melakukan proses pengeboran tersebut untuk mengurangi terjadinya dampak negatif.
The mined mass measurement by using drone technology approach in the local scale mining in Tumiyang area, Kebasen District, Banyumas Regency, Central Java, the observation area of CV. Sinergi Karya Solutif Adi Reski Surya Patioran; Avellyn Shinthya Sari; Muhammad Abdurrozak Siamashari; Ahmad Ubaidillah Fathoni; Ika Justitia Julita; Nazario Gomes
Journal of Earth and Marine Technology (JEMT) Vol 2, No 2 (2022)
Publisher : Lembaga Penelititan dan Pengabdian kepada Masyarakat - Institut Teknologi Adhi Tama Suraba

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31284/j.jemt.2022.v2i2.2882

Abstract

In this study, the objective or focal point is the number of reserves that have been mined and how to calculate the volume mined using the Unmanned Aerial Vehicle (UAV) method. In the evaluation of the volume mined using the UAV approach in Tumiyang village, Kebasen sub-district, Banyumas regency, Central Java province, this research was conducted using qualitative and quantitative methods related to the characteristics and modeling of sediment distribution from prospect block exploration. This research was conducted in the even semester of the 2020-2021 academic year, which is between October 2020 to March 2021. Based on the results of the study, it can be concluded that the data collection process using the UAV method requires a short time and complete initial information regarding the condition of the research area is very important for success. aerial photography data collection. The data obtained is aerial photo data and with supporting data such as topography and geology. Based on data processing, the mined volume obtained using supporting software is 32,313.55 m3, while the volume obtained when we calculate manually is 247,050.65 m3.
Analysis of The Relationship of Shipment Time and Productivity of Drilling Equipment and Transportation, Java Province Eko Purnomo; Yazid Fanani; Avellyn Shinthya Sari
Journal of Earth and Marine Technology (JEMT) Vol 2, No 1 (2021)
Publisher : Lembaga Penelititan dan Pengabdian kepada Masyarakat - Institut Teknologi Adhi Tama Suraba

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31284/j.jemt.2021.v2i1.2172

Abstract

PT. Agung Satriya Abadi is engaged in mining sand and stone which is formed by weathering deposits, located in Wonosunyo village, Gempol District, Pasuruan Regency, East Java. Companies that run in this category of rock mining generally have quite complex problems, one of which is in terms of time management which is considered less attention by some rock mining companies. In this study, several analyzes will be carried out and run the scientific method.The analysis carried out in this study uses statistical methods by displaying mathematical modeling and analysis of the relationship between circulation time and productivity in linear regression analysis. The data values that arise from the use of this mathematical-statistical method are the value (R2) = 0.8597 or 85% of the Doosan Giant Dx 520 Lca, then the value (R2) = 0.8459 or 84% of the Doosan Giant 300 Class, then Hino Ranger 500 Fm 260 Ti paired with Doosan Giant Dx 520 Lca has a value of (R2) = 0.9868 or 98%. And lastly, the Hino Ranger 500 Fm 260 Ti paired with the Doosan Giant 300 Class has a value of (R2) = 0.9886 or 98%.The data generated from each distribution time and productivity relationship from Doosan Giant Dx 520 Lca generates a difference value = 13,031 m3/hour, Doosan Giant 300 Class gives a difference value = 31.347 m3/hour, Hino Ranger 500 Fm 260 Ti against Doosan Giant Dx 520 Lca raises the difference value = 1,659 m3/hour, Hino Ranger 500 Fm 260 Ti against Doosan Giant 300 Class raises the difference value = 1,492 m3/hour.
Kajian Teknis Alat Muat dan Alat Angkut Untuk Pencapaian Target Produksi Batugamping Sebesar 24.500 Ton/Hari Pada Crusher Tuban I PT. Semen Indonesia (Persero) Tbk. Kabupaten Tuban Provinsi Jawa Timur Avellyn Shinthya Sari; Destyagung Febyeta; Budiarto Budiarto; Hardi Wahono
Prosiding Seminar Nasional Sains dan Teknologi Terapan Inovasi Teknologi Infrastruktur Berwawasan Lingkungan
Publisher : Institut Teknologi Adhi Tama Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Batugamping merupakan salah satu bahan galian yang tergolong sangat banyak digunakan dalam berbagai kegiatan industri salah satu diantaranya adalah industri semen. Dan seiring bertambahnya permintaan maka bertambah pula kebutuhan raw material yang disiapkan sehingga harus dilakukan analisa agar target produksi mampu terpenuhi sehingga tidak menganggu proses selanjutnya. Kegiatan penambangan di kuari batugamping PT. Semen Indonesia (Persero) Tbk. banyak mengalami kendala salah satunya merupakan ketidaktercapaian produksi batugamping untuk memenuhi kebutuhan pabrik. Salah satu analisa yang akan dilakukan adalah dengan menganalisa kegiatan pemuatan dan pengangkutan antara dalam hal ini alat muat (backhoe) dan alat angkut (dumptruck). Untuk target produksi yang diinginkan adalah sebesar 24.500 ton/hari tetapi kondisi nyata dilapangan tidak mampu untuk memenuhi target tersebut. Maka dari itu penulis menganalisa secara langsung kegiatan pengangkutan (hauling) dan Pemuatan (loading) dan merumuskan pemecahan masalah antara lain, pertama dengan melakukan peningkatan waktu efektif karena temuan dilapangan dari total waktu yang tersedia hanya ±73% waktu efektif yang digunakan sehingga perlu ditingkatkan agar mampu mencapai produksi, tetapi dengan kondisi Efective Utility (EU) yang hanya 58% maka total capaian maksimal yang bisa dilakukan hanya sekitar 60% dari total target yang diinginkan dan kondisi tersebut sudah sangat baik. Kondisi untuk produksi alat muat saat ini adalah 9.676,83 ton/hari dan dari hasil analisa pemecahan masalah didapat bahwa dengan penambahan waktu efektif untuk alat muat Komatsu PC 400 dari sebelumnya sebesar 74,28% menjadi 86,11% meningkat sebesar 1.541,63 ton/hari menjadi 11.218,47 ton/hari. Kemudian untuk alat angkut dumptruck Scania P-360 adalah dengan panambahan waktu efektif dari 73,33 % menjadi 88,22% produksi meningkat 1.906,31 ton/hari menjadi 11.295,61 ton/hari.
Kajian Teknis Sistem Penyaliran Tambang Dan Rancangan Sumuran Pada Pit Majapahit PT. Prolindo Cipta Nusantara, Kabupaten Tanah Bumbu, Kalimantan Selatan Suis Edi Haryanto; Budiarto Budiarto; Avellyn Shinthya Sari; Fajar Rizki Widiatmoko
Prosiding Seminar Nasional Sains dan Teknologi Terapan 2019: Menuju Penerapan Teknologi Terbarukan pada Industri 4.0: Perubahan Industri dan Transformasi P
Publisher : Institut Teknologi Adhi Tama Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. Prolindo Cipta Nusantara merupakan perseroan terbatas yang bergerak di bidang pertambangan batubara. Metode penambangan yang diterapkan adalah open pit mining. Sumber air yang masuk Pit Majapahit berasal dari air limpasan dan air hujan. Berdasarkan analisa curah hujan 2008-2017 periode ulang 10 tahun, curah hujan rencana adalah 170,17 mm/hari dengan intensitas 25,15 mm/jam dan jam hujan rata-rata 3,593 jam/hari. Terdapat empat saluran berbentuk trapesium, saluran I dan II terletak disebelah timur Pit Majapahit, saluran III disebelah selatan, saluran IV di utara Pit Majapahit. Sistem pemompaan menggunakan 2 pompa, pompa sykes HH160i digunakan di genangan air Pit Majapahit, sedangkan pompa sykes HH220i digunakan di sumuran 2. Debit aktual pompa sykes HH160i 464,4 m3/jam, sedangkan pompa sykes HH220i 590,4 m3/jam. Total debit air yang masuk ke Pit Majapahit sebesar 19.302,1 m3/hari. Berdasarkan debit pompa sykes HH160i yang direkomendasikan yaitu 500 m3/ jam, maka dimensi sumuran 1 adalah luas atas 50 m2, luas bawah 42 m2, kemiringan 60°, dan kedalaman 6 meter. Total debit air yang masuk ke sumuran 2 sebesar 79.673,6 m3/hari dengan penambahan 1 pompa yang sama dan peningkatan operating speed yaitu 1800 rpm maka debit yang dihasilkan adalah 750 m3/jam setiap pompanya maka debit air yang masuk mampu di imbangi dengan debit yang dikeluarkan pompa sesuai dengan dimensi sumuran 2. Kolam pengendapan lumpur memiliki panjang 95 m, lebar 20 m, kedalaman 6 m, dan jumlah kompartemen 4 buah. Volume padatan per detik sebesar 0,022 m3/detik dengan presentase pengendapan 96,8% sehingga waktu kolam penuh adalah 7 hari.
Pemanfaatan Sistem Informasi Geografis Untuk Zonasi Kawasan Pertambangan Kabupaten Ngawi Yazid Fanani; Avellyn Shinthya Sari
PROMINE Vol 6 No 2 (2018): PROMINE
Publisher : Jurusan Teknik Pertambangan, Fakultas Teknik, Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1398.435 KB) | DOI: 10.33019/promine.v6i2.781

Abstract

Ngawi regency has large potential of mining resources. However, there is no detailed data in mining arearegulation to optimalization of mining resources in Ngawi Regency. This research focus to identify miningresources in Ngawi Regency and making mining zonation used GIS aplication. Ngawi Regency Mining zonationmake with weighting and scoring in mining parameters than processing with overlay method. Based on thisresearch, Ngawi has 6 potential distribution mining resources, tehre is : Clay, Andesite, Limestone, Hard Soil,Sandstone, and Breccia. In Mining Parameters Ngawi Regency have 9 Parameters. Ngawi regency miningzonation can be divided into can be permitted to mined in 197 location, can be permitted to mined with certaincondition in 91 location , and can’t be permitted to mined in 254 location.
Analisis Kebutuhan Airflow Budget Di Level Extraction Pada Tambang Bawah Tanah Di Area Deep Mill Level Zone (Dmlz) PT. Freeport Indonesia Timika Papua Yudho Dwi Galih Cahyono; Avellyn Shinthya Sari; Billi Hanok Wambukomo
PROMINE Vol 9 No 1 (2021): PROMINE
Publisher : Jurusan Teknik Pertambangan, Fakultas Teknik, Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/promine.v9i1.2272

Abstract

Freeport Indonesia (PTFI) is a mining company that is an affiliate of Freeport-McMoran Copper & Gold Inc. (FCX) and PT Indonesia Asahan Aluminum (Persero) (Inalum). As of 2019, the Government of Indonesia has taken over 51.23% of shares (41.23% Inalum, 10% Regional Government of Papua). The research methods used in this activity are observational and comparative methods. In analyzing the calculation factors of design budget criteria. The data obtained will be used to compare direct field observation data with monthly report data from the company and equalize it with the air standard for underground mine ventilation based on the Decree of the Minister of Mines and Energy No. 1827 K / 30 / MEM / 2018. Calculation of airflow budget for the equipment used In the calculation and processing of airflow budget data is the R1600 LHD loader, the results of the Utilization Factor for 1 year are obtained by regulation of the Government of PT. Freeport itself uses in accordance with the regulations, namely 0.067 multiplied by 208Kw from the R 1600 LHD tool, obtaining an average 0.302 Maximum 0.482 Minimum 0.033 With a total air supply into the DMLZ mine of 1338 m3 / s, this is very sufficient from the results of the total air demand based on the airflow buget design in accordance where is 1095.6 m3 / s. In underground mining, DMLZ is in accordance with the regulation of the Decree of the Minister of Energy and Mineral Resources of the Republic of Indonesia Number 1827 K / 30 / MEM / 2018
Co-Authors Abdan Said Halim Limtar Adi Reski Surya Patioran Ahmad Betras Ediwana Ahmad Jefri Al Bukhari Ahmad Ubaidillah Fathoni Anastasia Nadia Gaidah Angga Pratama Putra Kobba Arie Fadjar Saputro Arlida Dwi Pangestika Arya Fernando Assa, King Christ Majesty Spencer Billi Hanok Wambukomo Budiarto Budiarto Budiarto Budiarto Budiarto Budiarto Bukhari, Ahmad Jefri Al C. Prasetyadi Casimiro Orleans Martins Chaq, Nakhlah Amiroh Risyda Destyagung Febyeta Dewy Belavista Saleky Ediwana, Ahmad Betras eko purnomo Eko Purnomo Fajar Rizki Widiatmoko Fanani, Yazid Farid, Wendy Muhammad Ibnu Febyeta, Destyagung Fernando, Arya Fitri Indah Dwi Suci Freeda Inggrit Ulviandri Gaidah, Anastasia Nadia Geri, Martinus Lousiano Gowarno, Marshellino Azry Hardi Wahono Haryanto, Suis Edi Ika Justitia Julita Ikal Don Lelewa Iksan Iksan Iksan, Iksan King Christ Majesty Spencer Assa Kobba, Angga Pratama Putra Kusdarini, Esthi Latekay, Priskilla Lelewa, Ikal Don Limtar, Abdan Said Halim Mahendra, Seftian Mahindra, Moch. Fahni Manopo, Sherina Marshellino Azry Gowarno Martinus Lousiano Geri Minto Basuki Minto Basuki Miru, Poppy Paulina Moch. Fahni Mahindra Muhammad Abdurrozak Siamashari Nakhlah Amiroh Risyda Chaq Nazario Gomes Osfaldo Try Sa’ban Pangestika, Arlida Dwi Poppy Paulina Miru Priskilla Latekay purba, Wilbert Hamongan Putri, Fairus Atika Redanto Ratih Hardini Kusuma Putri Sa’ban, Osfaldo Try Saputro, Arie Fadjar Sari Bahagiarti Kusumayudha Sari Bahagiarti Kusumayudha Satria Ambara Iriawan Satria Ambara Iriawan, Satria Ambara Seftian Mahendra Sherina Manopo Suci, Fitri Indah Dwi Suharsono Suharsono Suis Edi Haryanto Wahono, Hardi Wendy Muhammad Ibnu Farid Widiatmoko, Fajar Rizki Wilbert Hamongan purba Yazid Fanani Yudho Dwi Galih Cahyono