Chandra Wijaya
1). Radioisotope and Radiopharmaceutical Center, BATAN, Serpong. 2). Faculty of Pharmacy, University of Pancasila, Jakarta.

Published : 8 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search
Journal : Jurnal Titra

PENINGKATAN KAPASITAS PRODUKSI MELALUI PENGHITUNGAN WAKTU BAKU, TATA LETAK FASILITAS, SERTA PEMBERIAN KOMPENSASI DI PT SURYA PUTRA BARUTAMA Wijaya, Chandra; Sutapa, Nyoman
Jurnal Titra Vol 2, No 1 (2014)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT Surya Putra Barutama was not able to meet the market demand i.e. 500 units/month, since their production capacity was only 300 units/month. Therefore, to solve that problem we need to improve that capacity by calculating the standard time, production facility layouting, and calculating a new reward standard. At the end of this project, we found that, now the production capacity is 600 units/month.