Claim Missing Document
Check
Articles

Found 1 Documents
Search
Journal : JEEMECS (Journal of Electrical Engineering, Mechatronic and Computer Science)

TRANSIENT STABILITY ANALYSIS FOR DETERMINING CRITICAL CLEARING TIME IN ULUMBU GEOTHERMAL POWER PLANT Aventus Wagur; Abraham Lomi; Irrine Budi Sulistiawati
JEEMECS (Journal of Electrical Engineering, Mechatronic and Computer Science) Vol 1, No 2 (2018): August 2018
Publisher : Merdeka Malang University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (634 KB) | DOI: 10.26905/jeemecs.v1i2.2353

Abstract

The presence of 3 comparable phases in the Ulumbu geothermal power plant affects the existing system, so it is necessary to conduct stability analysis to be able to find out the Critical Clearing Time (CCT) of the Circuit Breaker system that can maintain its synchronous condition. The results of the transient system analysis to determine the Critical Clearing Time were carried out when the 3 phases of the Ulumbu geothermal power plant were 0.4 seconds and showed that the level of voltage, frequency, and rotor angle would be faster DOI :  https://doi.org/10.26905/jeemecs.v1i2.2353