cover
Contact Name
Suhanto
Contact Email
suhanto@poltekbangsby.ac.id
Phone
-
Journal Mail Official
mail@poltekbangsby.ac.id
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Penelitian
ISSN : 19786832     EISSN : 26225948     DOI : -
Arjuna Subject : -
Articles 3 Documents
Search results for , issue "9-17" : 3 Documents clear
The Analysis Of Lecturer Knowledge For Implementation To The Effective Classroom Meita Maharani
Jurnal Penelitian 9-17
Publisher : Politeknik Penerbangan Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (326.362 KB) | DOI: 10.46491/jp.v2i1.105

Abstract

The purpose of this study was to implementation lecturers’ knowledge about effective classroom and their classroom practices for teaching English. It was also knowing the correspondence between lecturers’ knowledge and the practices. This study designed using qualitative case study approach. The data was obtained using multiple-choice typed test, observation checklist, and interview. The subjects were four English lecturers and their cadets as supporting subject. The data obtained was analyzed using interactive model proposed by Miles and Huberman. The data revealed that the subjects had variety of knowledge about classroom ; one of them had sufficient knowledge , another one showed average result and the other two were emerging. In their classroom practice, two lecturers performed effective classroom skill, but the other two showed average effort in managing their class. For the correspondence, it was found that there were three group of lecturers; the first group has sufficient knowledge and applied it simultaneously, the second group has average knowledge but applied it in more effective ways, and the third group has emerging knowledge and applied it likely to be the same as their knowledge in the classroom practice.
DESAIN ANTENA MIKROSTRIP RECTANGULAR ARRAY 2X1 UNTUK RADAR KAPAL Bambang Bagus; M. Andra Aditiyawarman; Nyaris Pambudiyatno; Yuyun Suprapto
Jurnal Penelitian 159-172
Publisher : Politeknik Penerbangan Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46491/jp.v6i3.584

Abstract

Antena merupakan salah satu komponen vital dalam suatu pemancar atau penerima. Antena bekerja dengan mentransmisikan dan menerima gelombang elektromagnetik dari dan ke udara. Antena mikrostrip merupakan salah satu jenis antena yang saat ini sering diaplikasikan di beberapa peralatan sebagai salah satu antena alternatif dan inovasi antena dikarenakan proses fabrikasi yang mudah dan murah.Penelitian ini mencoba dan merealisasikan antena mikrostrip recatngular patch untuk radar kapal yang diketahui bekerja pada frekuensi S-Band (2.2 GHz) dengan mengikuti standarisisasi spesifikasi antena radar yang dibutuhkan. Substrat yang digunakan pada antena ini adalah FR-4. Pada penelitian kali ini, penulis akan mencoba untuk mendesain dan menganalisa kinerja antena mikrostrip patch rectangular menggunakan aplikasi CST Studio Suite 2019 sebagai salah satu bentuk media pembelajaran antena alternatif pada frekuensi 2.2 GHz dan diharapkan memiliki nilai parameter VSWR ≤ 2, dan nilai return loss ≤ 10 dB.
ANALISA MANFAAT PEMASANGAN CAPACITOR BANK UNTUK MEMPERBAIKI FAKTOR DAYA DAN MENGURANGI KERUGIAN DAYA DAN ENERGI LISTRIK DI POLITEKNIK PENERBANGAN SURABAYA Hartono Hartono; Heri Sudarmadji; Slamet Hariyadi; Rifdian IS; Siti Julaihah; M. Indra Martadinata
Jurnal Penelitian 159-170
Publisher : Politeknik Penerbangan Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46491/jp.v7i2.919

Abstract

Electric power quality problems include line losses, voltage drops, and the amount of inductive reactive power consumed at load so the power factor is low. Power factor improvement in Politeknik Penerbangan Surabaya electrical system to 0,99 is expected to improve electric power quality by installing a setcapacitorsitor called Capacitor Banks that supply capacitive reactive power. Another benefit is that reduces the load on transformer Poltekbang Surabaya which is now approaching full load. To be able to repair the electric power supply is necessary to measure and calculate the inductive reactive power which can be compensated with witcapacitiveie reactive power by Capacitor Bank. After calculating the capacitor bank value, the location of the capacitor bank installation is then determined so that power improvements can be carried out effectively, The result shows that the compensation needed to improve the power factor on Poltekbang Surabaya is 300 kVAR divided into 5steps, each step requires a 50 kVAR capacitor

Page 1 of 1 | Total Record : 3


Filter by Year

0000


Filter By Issues
All Issue Vol. 8 No. 2 (2023): Jurnal Penelitian Juni 2023 Vol 2 No 2 (2017): Jurnal Penelitian Juni 2017 Vol 1 (2016): Jurnal Penelitian Maret 2016 343-352 332-342 323-331 316-323 312-322 311-320 306-315 305-310 297-311 297-305 295-301 292-304 289-296 289-294 283-296 282-288 278-291 278-288 276-281 273-282 270-277 268-275 264-272 261-267 260-269 257-263 256-269 254-260 250-259 249-253 247-255 246-256 242-248 240-249 237-246 236-241 235-245 232-239 230-235 227-236 224-234 223-229 222 -231 216-223 215-226 214 - 221 212-222 204 - 214 203 - 213 203-211 199-215 197-202 194-203 192 - 202 191-198 188-196 187-193 181 - 191 180-190 180-186 178-187 173-179 171 - 180 171-179 170-177 164 - 170 163-169 159-172 159-170 155 - 163 155-162 151 -158 147-158 142 - 150 138-147 135-146 133 - 141 129-137 125-134 123 - 132 121-128 114 - 122 113-124 110-120 102-112 101 - 113 100-109 90-101 90 - 100 93-99 86-96 84-92 79 - 89 77 - 89 75-85 75-83 71-80 71-77 70-77 69-77 68-77 67-77 66-77 66-74 65 - 76 64-77 64-69 62-70 61-69 60-69 59-70 59-67 58-68 58-66 58-65 57-65 56-65 56-64 56-63 55-63 52-61 52-60 50-59 50-58 49-57 49-56 49-55 48-57 47-57 45 - 54 45-54 45-51 44-48 43-51 42-55 42-49 42-48 41-49 40-48 40-44 38-47 38-46 38-41 37-48 37-44 36-44 36-43 35-41 32-37 31-40 30-41 29-42 29-39 29-37 29-35 28-41 28-34 27-37 27-35 27-31 25-39 25-36 24-36 23-29 21-30 21-28 21-26 20-28 20-27 19-28 18-26 16-27 16-24 15-24 14-28 14-20 13-20 12 - 23 12-22 11-20 11-19 11-14 10-17 9-17 8-13 7-12 1-19 1-15 1-13 1-11 1-10 1-9 1-8 1-7 1-6 More Issue