cover
Contact Name
Lie Jasa
Contact Email
liejasa@unud.ac.id
Phone
+6282247015205
Journal Mail Official
miteudayana@unud.ac.id
Editorial Address
PS Magister Teknik Elektro Fakultas Teknik Unud Jalan PB Sudirman, Denpasar, Bali, Indonesia
Location
Kota denpasar,
Bali
INDONESIA
Majalah Ilmiah Teknologi Elektro
Published by Universitas Udayana
ISSN : 16932951     EISSN : 25032372     DOI : https://doi.org/10.24843/MITE
Majalah Ilmiah Teknologi Elektro (MITE) is peer review journal, published twice a year by the Study Program of Magister Electrical Engineering, Faculty of Engineering, Universitas Udayana. This journal discusses the scientific works containing results of research in the field of electrical, include power systems, telecommunications, informatics, and electronics. Authors are expected to include original scientific papers in accordance with the scope of the discussion of this journal including all aspects of the theory and practice are used.
Articles 21 Documents
Search results for , issue "Vol 16 No 2 (2017): (May - Agustus) Majalah Ilmiah Teknologi Elektro" : 21 Documents clear
Metode Contrast Stretching untuk Perbaikan Kualitas Citra pada Proses Segmentasi Video I Made Dwi Putra Asana; I Made Oka Widyantara; N.M.A.E.D Wirastuti; Ida Bagus Putu Adnyana
Jurnal Teknologi Elektro Vol 16 No 2 (2017): (May - Agustus) Majalah Ilmiah Teknologi Elektro
Publisher : Program Studi Magister Teknik Elektro Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/MITE.2017.v16i02p01

Abstract

Paper ini mengusulkan contrast stretching sebagai perbaikan kualitas citra untuk meningkatkan hasil segmentasi pada proses segmentasi video. Data video yang digunakan merupakan video pemantauan aktifitas pergerakan garis pantai. Frame dari video yang digunakan memiliki komposisi cahaya matahari berbeda-beda sesuai dengan waktu akuisisi data. Dibutuhkan suatu teknik untuk mengatasi pengaruh cahaya matahari pada frame video. Contrast stretching diimplementasikan untuk memperbaiki nilai kontras pada frame sehingga obyek pada frame terlihat jelas. Dengan obyek yang terlihat jelas pada frame dapat meningkatkan hasil dari proses segmentasi. Pengujian implementasi contrast stretching sebagai preprocessing pada proses segmentasi dilakukan dengan metode silhouette coefficient. Implementasi contrast stretching sebagai preprocessing dalam segmentasi citra dapat menghasilkan segmentasi lebih baik dibandingkan tanpa preprocessing. Hal tersebut dinyatakan berdasarkan nilai silhouette width dari masing-masing hasil segmentasi citra.
Analisis Penataan Sel Untuk Layanan Sistem WCDMA Di Area Jalan Tengah I Kerobokan Alit Winaya; Gede Sukadarmika; Linawati Linawati
Jurnal Teknologi Elektro Vol 16 No 2 (2017): (May - Agustus) Majalah Ilmiah Teknologi Elektro
Publisher : Program Studi Magister Teknik Elektro Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/MITE.2017.v16i02p17

Abstract

In WCDMA system, signal service coverage determines quality service of telecommunication network . To give maximum network service at Jl. Tengah I Kerobokan area, thus requiring the study of the arrangement of the cell coverage on BTS Protpeliatan Sector ? and BTS AnyarKaja Sektor ?. The method used is calculation the distance of base station with proper propagation model which suits the condition of both base stations, also antenna azimuth and tilting were given, and simuation using Atoll software to see the predicted coverage area of BTS. As the result, suitable propagation for BTS Protpeliatan Sector ? is Okumurra Hatta model and BTS AnyarKaja Sektor ? is Cost 231 Hatta model, maximum coverage signal service of BTS Protpeliatan Sector ? is 1,17 km and for BTS AnyarKaja Sektor ? is 1,11 km. Requirement of antenna tilt change from 0º to 0,95º for BTS Protpeliatan Sektor ? and for pada BTS AnyarKaja Sektor ?, antenna tilt change from 0º to 1º and change of 30º antenna sector direction from 180º to 210º. From simulation using Atoll software with above parameters, acknowledge that area of Jl. Tengah I Kerobokan already get maximum service with received signal level pass the KPI (Key Performance Indicator) standard.
Audit Infrastruktur Aplikasi Pelayanan Publik Pemerintah Kota Denpasar Cokis Ratih Kumbara; Linawati Linawati; I Made Oka Widyantara
Jurnal Teknologi Elektro Vol 16 No 2 (2017): (May - Agustus) Majalah Ilmiah Teknologi Elektro
Publisher : Program Studi Magister Teknik Elektro Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/MITE.2017.v16i02p14

Abstract

Salah satu Tugas Pokok dan Fungsi utama Dinas Komunikasi dan Informatika Kota Denpasar adalah sebagai pengelola infrastruktur aplikasi pelayanan publik di Pemerintah Kota Denpasar. Pelayanan publik berupa pelayanan kependudukan di Kota Denpasar menggunakan aplikasi Sistem Informasi Administrasi Kependudukan (SIAK) yang meliputi pembuatan KTP, KK, dan Akta Kelahiran. Jika infrastruktur aplikasi pelayanan publik ini mengalami permasalahan, maka akan sangat menghambat semua proses yang berujung kepada komplain masyarakat dan berdampak pada menurunnya tingkat kepercayaan publik. Oleh karena itu dilakukan suatu evaluasi internal berupa audit dalam pengelolaan infrastruktur aplikasi pelayanan publik agar pihak pengelola dapat melakukan perencanaan untuk perbaikan serta peningkatan dan pengembangan infrastruktur yang telah dibangun. Audit dilakukan dengan menggunakan COBIT 4.1 sebagai kerangka kerja kontrol. Berdasarkan hasil audit dengan menggunakan Maturity Model COBIT 4.1, diperoleh tingkat kematangan pada proses AI3 (Mendapatkan dan Memelihara Infrastruktur Teknologi) yaitu berada pada level 3 (defined). Untuk penilaian secara objektif, tingkat kematangan berada diantara level 3 (defined) dan level 4 (managed and measurable) yaitu sebesar 3,53. Rekomendasi diberikan secara bertahap berdasarkan tingkat kematangan yang diperoleh dari hasil evaluasi yaitu tingkat kematangan 3 (defined) untuk dapat ditingkatkan ke tingkat kematangan 4 (managed and measurable), kemudian ditingkatkan lagi menuju tingkat kematangan ideal yaitu 5 (optimized).
STUDI ANALISA KOORDINASI RELAI GFR INCOMING BUSBAR 20 KV DAN GFR SALURAN UNTUK MENGAMANKAN GANGGUAN SATU PHASA KETANAH DI TRANSFORMATOR 3 GARDU INDUK KAPAL I Gede Krisnayoga Kusuma; I Gede Dyana Arjana; I Wayan Arta Wijaya
Jurnal Teknologi Elektro Vol 16 No 2 (2017): (May - Agustus) Majalah Ilmiah Teknologi Elektro
Publisher : Program Studi Magister Teknik Elektro Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/MITE.2017.v16i02p04

Abstract

Disruption of the distribution system is generally caused by a short circuit that causes overcurrent, one single phase short circuit to ground. Single phase to ground disturbances that occurred at the feeder should be secured by a ground fault relays in feeders. However, due to an error of coordination, interference with the feeder perceived also to the incoming side of the transformer so that ground fault relays on the incoming 20 kV ordered PMT 20 kV at the transformer side open. Working time ground fault relays in feeders Peguyangan is for 0.25 seconds. While working time ground fault relays in the incoming 20 kV is for 0.5 seconds. This indicates that differences in work time relay by 0.25 seconds is considered selective. The event of disruption of the ground phase, GFR relay coordination in securing the area of ??interference must be gradual. Where the value of working time ground fault relays in the base should be longer than the time ground fault relays working on a feeder. It aims to work ground fault relays working order, so that errors can be avoided in the security and do not lead to the spread of disturbed areas.
RANCANG BANGUN PEMODELAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) MENGGUNAKAN KINCIR OVERSHOT WHEEL I Wayan Budiarsana Saputra; Antonius Ibi Weking; Lie Jasa
Jurnal Teknologi Elektro Vol 16 No 2 (2017): (May - Agustus) Majalah Ilmiah Teknologi Elektro
Publisher : Program Studi Magister Teknik Elektro Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/MITE.2017.v16i02p09

Abstract

Ketergantungan pembangkit listrik terhadap sumber energi seperti minyak solar, gas alam dan batubara yang hampir mencapai 75%, mendorong dikembangkannya energi terbarukan sebagai upaya untuk memenuhi pasokan listrik. Pada penelitian ini telah dirancang pemodelan PLTMH menggunakan kincir overshot wheel dengan bentuk sudu setengah lingkaran, diameter kincir 50cm, dan 16 jumlah sudu. Pada pemodelan ini debit air 0,1 lt/s dan head 0,6 meter. Pengukuran yang dilakukan berdasarkan posisi jatuhnya air terhadap kincir, dari posisi sudut nozzle 00, 50, 100, 150, 200, 250, 300, 350 dan 400.
OPTIMASI PEMASANGAN DAN KAPASITAS KAPASITOR SHUNT PADA JARINGAN DISTRIBUSI PENYULANG MENJANGAN Chandra Wimartono Manurung; I Wayan Sukerayasa; Rukmi Sari Hartati
Jurnal Teknologi Elektro Vol 16 No 2 (2017): (May - Agustus) Majalah Ilmiah Teknologi Elektro
Publisher : Program Studi Magister Teknik Elektro Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/MITE.2017.v16i02p02

Abstract

Optimasi pemasangan dan kapasitas kapasitor shunt pada Penyulang Menjangan dilakukan untuk kompensasi daya reaktif pada jaringan distribusi primer sehingga dapat memperbaiki faktor daya, mengurangi rugi-rugi jaringan dan memperbaiki profil tegangan pada jaringan distribusi Penyulang Menjangan setelah dilakukan pemasangan kapasitor shunt. Untuk mendapatkan nilai yang optimum dari parameter-parameter tersebut, menggunakan proses optimasi dengan metode Capacitor Sizing – Radial Network. Dari hasil studi simulasi optimasi kapasitor shunt pada Penyulang Menjangan, diperoleh letak optimum dari kapasitor shunt pada jarak 92.724 ft (27,82 km) dari sumber atau jika digambarkan pada diagram segaris berada sebelum Bus 28 (GR 122) dengan kapasitas 1.800 kVAR. Setelah dilakukan pemasangan kapasitor shunt tersebut, faktor daya naik dari kondisi awal simulasi 0,79 menjadi 0,91, tegangan pada Bus 91 (GR 115) mengalami peningkatan sebesar 16,4% (dimana kondisi awal simulasi 75,05% naik menjadi 91,42%) serta penurunan rugi-rugi jaringan sebesar 29,3%.
STUDI PENGARUH PEMASANGAN NGR 40 OHM PADA UPRATING TRANSFORMATOR 2 GI GIANYAR TERHADAP GANGGUAN HUBUNG SINGKAT 1 PHASA TANAH Arya Surya Darma; I Gede Dyana Arjana; A.A Gede Maharta Pemayun
Jurnal Teknologi Elektro Vol 16 No 2 (2017): (May - Agustus) Majalah Ilmiah Teknologi Elektro
Publisher : Program Studi Magister Teknik Elektro Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/MITE.2017.v16i02p19

Abstract

Along with the development of ever-increasing burden on the GI Gianyar then the transformer unit 2 with a capacity of 30 MVA will be uprating with a capacity of 60 MVA transformer. To maintain the continuity and reliability of the flow of electrical power to the consumer , NGR (Neutral Grounding Resistance) and relay SBEF is used as the safety equipment of the short circuit 1 phase to ground was not in to the neutral point of the transformer. Uprating of transformers that have been done changes on 1 phase fault current to ground when using a direct earthing systems with a value to become 1838.21 A. While the value of the short-circuit current 1 phase to ground after pairing NGR 40 Ohm value is fixed at 288.675 A, so that the current setting and time relay SBEF fixed at 90 A and 7.067 seconds. The analysis result from the effect of installation NGR and rele SBEF on the transformer 60 MVA against short circuit 1 phase to ground has the ability good protection for the value of the fault current is able to be reduced from 1838,21 A into 288.675 A after pairing NGR 40 Ohm and time is needed SBEF to handle distractions 7.067 seconds. Intisari- Seiring dengan perkembangan beban yang terus meningkat di GI Gianyar maka transformator unit 2 berkapasitas 30 MVA akan di lakukan uprating (penggantian) dengan transformator berkapasitas 60 MVA. Untuk menjaga kontinyuitas dan keandalan aliran daya listrik sampai ke konsumen (beban), NGR (Neutral Grounding Resistance) dan rele SBEF dipergunakan sebagai peralatan pengaman dari gangguan hubung singkat phasa tanah agar arus gangguan 1 phasa ke tanah tidak sampai mengalir ke titik netral transformator. Dari uprating transformator yang sudah di lakukan terjadi perubahan pada arus gangguan 1 phasa ke tanah jika menggunakan sistem pentanahan langsung (solid grounding) menjadi 1838,21 A. Sedangkan nilai dari arus hubung singkat 1 phasa ke tanah setelah dipasangkan NGR 40 Ohm nilainya tetap sebesar 288,675 A, sehingga setting arus dan waktu rele SBEF tetap sebesar 90 A dan 7,067 detik. Hasil analisis pengaruh pemasangan NGR dan rele SBEF pada transformator 60 MVA terhadap gangguan hubung singkat 1 phasa ke tanah menghasilkan kemampuan proteksi yang lebih baik karena nilai arus gangguan yang mampu di kurangi dari 1838,21 A menjadi 288,675 A setelah dipasangkan NGR 40 Ohm dan waktu yang di butuhkan SBEF untuk menangani gangguan 7,067 detik.
Estimator Parameter Tegangan Jaringan Tiga Fasa Berbasis D-SOGI PLL Iwan Setiawan; Mochammad Facta; Ardyono Priyadi; Mauridhi Hery Purnomo
Jurnal Teknologi Elektro Vol 16 No 2 (2017): (May - Agustus) Majalah Ilmiah Teknologi Elektro
Publisher : Program Studi Magister Teknik Elektro Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/MITE.2017.v16i02p15

Abstract

Phase locked loop (PLL) adalah sebuah sistem umpan balik yang memegang peran penting dalam sistem-sistem konverter terkoneksi jaringan listrik. Fungsi utama PLL adalah mendapatkan beragam informasi parameter jaringan yaitu seperti phase dan magnitude tegangan. Informasi-informasi tersebut selanjutnya digunakan sebagai dasar proses sinkronisasi peralatan dengan jaringan listrik. Tujuan utama paper ini adalah memodelkan sekaligus membandingkan unjuk kerja salah satu jenis PLL yang dikenal dengan nama Dual Second Order Generalized Integrator Phase-Locked Loop dengan SRF-PLL yaitu sebuah PLL yang relatif standar. Berdasarkan hasil simulasi, unjuk kerja D-SOGI PLL dalam keadaan tunaknya lebih unggul dibandingkan SRF-PLL terutama untuk kondisi jaringan listrik tiga phase tidak seimbang.
EVALUASI LAYANAN BROADBAND CAMPUS DENGAN MENGGUNAKAN FRAMEWORK COBIT 4.1 Fajar Tri Prabowo; NMAE Dewi Wirastuti; I Nyoman Satya Kumara
Jurnal Teknologi Elektro Vol 16 No 2 (2017): (May - Agustus) Majalah Ilmiah Teknologi Elektro
Publisher : Program Studi Magister Teknik Elektro Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/MITE.2017.v16i02p06

Abstract

Abstract - Broadband campus is a high speed internet service with high transfer rate that implemented within the campus area. The sole purpose of this service is to optimize the internet network in certain area that is still lack of a high speed internet connection. This paper will ellaborate more on the evaluation of certain ongoing broadband campus service at Mahasaraswati University in Denpasar by using COBIT 4.1 Framework. This evaluation is intended to enhance the user effectiveness through existing services. This evaluation was conducted through certain mini-survey by using the broadband campus IT service by examining the university students satisfaction through series of interviews and questionnaires. The conclusion that was inferred through the surveys is that the broadband services within the university gain a subsequently low existing maturity level with 1.9 mark in the COBIT Framework scale. One of the major reason of why the service acquire low satisfaction level within the university is due the students in Mahasaraswati University did not manage to optimize the broadband campus service in the first place
Implementasi Pengendali Logika Fuzzy pada Navigasi Robot Penjejak Dinding Gunawan Dewantoro; Deddy Susilo; Prabata Pideksa Adi
Jurnal Teknologi Elektro Vol 16 No 2 (2017): (May - Agustus) Majalah Ilmiah Teknologi Elektro
Publisher : Program Studi Magister Teknik Elektro Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/MITE.2017.v16i02p13

Abstract

Navigasi merupakan salah satu kendala utama dalam perancangan robot otomatis. Metode kontrol berbasis PID yang popular dipakai menemui sejumah kendala pada sistem yang tidak pasti dan nonlinier. Keunggulan logika fuzzy sebagai metode kontrol dibandingkan kontroler konvensional adalah fleksibilitas dan kemudahan perancangan untuk sistem yang kompleks. Pada penerapan metode kontrol logika fuzzy, robot dirancang agar mampu bernavigasi secara otomatis dan dapat menelusuri peta lapangan pengujian dengan segala kondisi serta variasi secara efektif dan efisien. Peta lapangan yang digunakan sebagai pengujian adalah peta lapangan yang digunakan dalam Trinity College Fire-Fighting Home Robot (TCFFHR) Contest 2016. Untuk perangkat pemroses robot memakai mikrokontroller tipe ATMega128. Robot ini memakai sensor Sonar Range Finder (SRF) sebagai sensor utama serta menggunakan sensor infrared dan sensor garis. Dari hasil pengujian robot yang menggunakan metode kontrol fuzzy mampu bernavigasi dengan rasio kontak per putaran yang lebih baik dibandingkan metode kontrol Propotional-Derivative dan sangat efektif dalam menghadapi berbagai situasi lingkungan yang terjadi ketika bernavigasi.

Page 2 of 3 | Total Record : 21


Filter by Year

2017 2017


Filter By Issues
All Issue Vol 23 No 1 (2024): (Januari - Juni ) Majalah Ilmiah Teknologi Elektro Vol 22 No 2 (2023): (Juli - Desember) Majalah Ilmiah Teknologi Elektro Vol 22 No 1 (2023): (Januari - Juni) Majalah Ilmiah Teknologi Elektro Vol 21 No 2 (2022): (Juli - Desember) Majalah Ilmiah Teknologi Elektro Vol 21 No 1 (2022): (Januari - Juni) Majalah Ilmiah Teknologi Elektro Vol 20 No 2 (2021): (Juli-Desember) Majalah Ilmiah Teknologi Elektro Vol 20 No 1 (2021): (Januari - Juni ) Majalah Ilmiah Teknologi Elektro Vol 19 No 2 (2020): (Juli - Desember) Majalah Ilmiah Teknologi Elektro Vol 19 No 1 (2020): (Januari - Juni ) Majalah Ilmiah Teknologi Elektro Vol 18 No 3 (2019): (September - Desember) Majalah Ilmiah Teknologi Elektro Vol 18 No 2 (2019): (Mei-Agustus) Majalah Ilmiah Teknologi Elektro Vol 18 No 1 (2019): (Januari - April) Majalah Ilmiah Teknologi Elektro Vol 17 No 3 (2018): (September - Desember) Majalah Ilmiah Teknologi Elektro Vol 17 No 2 (2018): (May - Agustus) Majalah Ilmiah Teknologi Elektro Vol 17 No 1 (2018): (Januari - April) Majalah Ilmiah Teknologi Elektro Vol 16 No 3 (2017): (September - December) Majalah Ilmiah Teknologi Elektro Vol 16 No 2 (2017): (May - Agustus) Majalah Ilmiah Teknologi Elektro Vol 16 No 1 (2017): (January - April) Majalah Ilmiah Teknologi Elektro Vol 15 No 2 (2016): (July - December) Majalah Ilmiah Teknologi Elektro Vol 15 No 1 (2016): (January - June) Majalah Ilmiah Teknologi Elektro Vol 14 No 2 (2015): (July - December) Majalah Ilmiah Teknologi Elektro Vol 14 No 1 (2015): (January - June) Majalah Ilmiah Teknologi Elektro Vol 13 No 2 (2014): (July - December) Majalah Ilmiah Teknologi Elektro Vol 13 No 1 (2014): (January - June) Majalah Ilmiah Teknologi Elektro Vol 12 No 2 (2013): (July - December) Majalah Ilmiah Teknologi Elektro Vol 12 No 1 (2013): (January - June) Majalah Ilmiah Teknologi Elektro Vol 11 No 2 (2012): (July - Decenber) Majalah Ilmiah Teknologi Elektro Vol 11 No 1 (2012): (January - June) Majalah Ilmiah Teknologi Elektro Vol 10 No 2 (2011): (July - December) Majalah Ilmiah Teknologi Elektro Vol 10 No 1 (2011): (January - June) Majalah Ilmiah Teknologi Elektro Vol 9, No 2 (2010): (July - December) Majalah Ilmiah Teknologi Elektro Vol 9, No 1 (2010): (January - June) Majalah Ilmiah Teknologi Elektro Vol 8 No 2 (2009): (July - December) Majalah Ilmiah Teknologi Elektro Vol 8 No 1 (2009): (January - June) Majalah Ilmiah Teknologi Elektro Vol 7 No 2 (2008): (July - December) Majalah Ilmiah Teknologi Elektro Vol 7 No 1 (2008): (January - June) Majalah Ilmiah Teknologi Elektro Vol 6 No 2 (2007): (July - December) Majalah Ilmiah Teknologi Elektro Vol 6 No 1 (2007): (January - June) Majalah Ilmiah Teknologi Elektro Vol 5 No 2 (2006): (July - December) Majalah Ilmiah Teknologi Elektro Vol 5 No 1 (2006): (January - June) Majalah Ilmiah Teknologi Elektro Vol 4 No 2 (2005): (July - December) Majalah Ilmiah Teknologi Elektro Vol 4 No 1 (2005): (January - June) Majalah Ilmiah Teknologi Elektro Vol 3 No 2 (2004): (July - December) Majalah Ilmiah Teknologi Elektro Vol 1 No 1 (2001): Library More Issue