STUDI PERENCANAAN TEBAL PERKERASAN KONSTRUKSI JALAN RAYA (MENGGUNAKAN METODE BINA MARGA) PADA RUAS JALAN UMASUKAER DI KABUPATEN MALAKA Philipus Resato Nahak; Yosef Cahyo; Sigit Winarto
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 1 (2019): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (482.932 KB) | DOI: 10.30737/jurmateks.v2i1.393

Abstract

The increase in traffic volume will cause a decrease in service due to decreased road capacity due to an increase in side constraints and due to the increase in traffic volume itself, which will ultimately cause the level of road saturation to increase. The situation occurred in the Umasukaer road section of the Malacca Regency. Therefore it is necessary to address improvements in the quality of the road in order to meet the feasibility of transportation facilities by taking into account the existing technical requirements. The results of planning found that through the 2015 LHR survey data with a prediction of an increase in traffic density of 6% per year, the LHR was obtained with a planned age of 7 years = 2540.7 vehicles/day/department and a 20-year plan life LHR = 5419.1 ked/day / major. The results of a gradual construction planning pavement study can be concluded that the planning model that has been designed is effective in strengthening road construction in accordance with existing technical requirements and efficient in terms of financing. The final results of gradual construction pavement thickness results are: Ashburton thickness (MS 744) = 8 cm, Ashburton (MS 744) = 13 cm, broken stone (CBR 100) = 20 cm, Sirtu (CBR 50) = 10 cm and CBR subgrade 5%. Pertambahan volume lalu lintas akan menyebabkan penurunan layanan diakibatkan menurunnya kapasitas jalan karena adanya peningkatan hambatan samping maupun karena beratambahnya volume lalu lintas itu sendiri yang pada akhirnya akan meyebabkan tingkat kejenuhan jalan meningkat. Keadaan tersebut terjadi ruas jalan Umasukaer Kabupaten Malaka, oleh karena itu perlu adanya penanganan perbaikan kualitas jalan agar memenuhi segi kelayakan sarana transportasi dengan memperhatikan syarat-syarat teknik yang ada. Hasil perencanaan didapatkan bahwa melalui data survey LHR tahun 2015 dengan prediksi peningkatan kepadatan lalu lintas sebesar 6% pertahun maka didapatkan LHR dengan umur rencana 7 tahun = 2540,7 kend/hr/jurusan dan LHR umur rencana 20 tahun = 5419,1 ked/hr/jurusan. Hasil studi perencanaan perkerasan konstruksi bertahap dapat diambil kesimpulan bahwa model perencaaan yang telah dirancang efektif dalam memperkerasa konstruksi jalan sesuai dengan syarat teknis yang ada serta efisien dalam hal pembiayaan. Hasil akhir tebal perkerasan konstruksi bertahap diperoleh hasil: Ketebalan Asbuton (MS 744) = 8 cm, Asbuton (MS 744) = 13 cm, batu pecah (CBR 100) = 20 cm, Sirtu (CBR 50) = 10 cm dan CBR tanah dasar 5%.
STUDI PERENCANAAN JEMBATAN CUMPLENG DENGAN METODE PRATEKAN DI KEC. SLAHUNG KABUPATEN PONOROGO Adi Susanto; Yosef Cahyo; Sigit Winarto
Jurnal Manajemen Teknologi & Teknik Sipil Vol 1, No 2 (2018): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (668.988 KB) | DOI: 10.30737/jurmateks.v1i2.375

Abstract

In planning the Cumpleng Bridge in Slahung Sub-district, Ponorogo Regency with an overall span of 30 meters, the overall width of the bridge is 4.20 meters and the width of the pavement is 3.50 meters. Given the Cumpleng Bridge is one of several bridges in the Slahung District development project environment. This bridge has an important meaning as a link between Slahung Village and Galak Village, so it is expected to facilitate the flow of traffic and improve economic development and development in the area. In this planning study we use a prestressed method to calculate the calculation of the backrest and backrest poles, vehicle flooring, main girders and abutments / underbuildings. The results of this bridge planning include: planning the backrest, vehicle floor, main beam and transverse beam. Main beam using composite prestressed concrete post-tensioning method (post-tensioning with height, 1.10 meters, concrete quality (fc) 40 MPa, consisting of 2 tendons used type VSL type 12 with as many as 10 strand cables and other buildings using concrete regular boned).Dalam perencanaan Jembatan Cumpleng di Kecamatan Slahung Kabupaten Ponorogo dengan bentang keseluruhan 30 meter, lebar keseluruhan jembatan 4,20 meter dan lebar perkerasan 3,50 meter. Mengingat Jembatan Cumpleng merupakan salah satu dari beberapa jembatan yang ada di lingkungan proyek pengembangan wilayah Kecamatan Slahung. Jembatan ini mempunyai arti yang penting sebagai penghubung antara Desa Slahung dan Desa Galak, sehingga diharapkan dapat memperlancar arus lalu lintas serta meningkatkan perkembangan perekonomian dan pembangunan di daerah. Pada studi perencanaan ini kami menggunakan metode pratekan untuk menghitung perhitungan sandaran dan tiang sandaran, lantai kendaraan, gelagar induk dan abutment/bangunan bawah. Hasil dari perencanaan jembatan ini meliputi : perencanaan tiang sandaran, lantai kendaraan, balok induk dan balok melintang. Balok induk menggunakan beton pratekan komposit metode pasca tarik (post-tensioning dengan tinggi, 1,10 meter, mutu beton (fc) 40 Mpa, terdiri 2 buah tendon dipakai jenis VSL tipe 12 dengan kabel untaian sebanyak 10 buah dan bangunan yang lain menggunakan beton bertulang biasa).
PERENCANAAN PONDASI SUMURAN PADA PROYEK PEMBANGUNAN GEDUNG ASRAMA BALAI PEMBANGUNAN SDM DAN PERTANIAN BANTUL DIY Moh. Idham Cholid; Sigit Winarto; Yosef Cahyo; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (254.948 KB) | DOI: 10.30737/jurmateks.v3i1.888

Abstract

The foundation serves to hold the burden on the upper structure, which is transmitted to the soil layer. Data collection uses primary and secondary data, as well as direct visits to the development project site. The choice of wells foundation because of the restricted location of restricted location and minimal vibration chose the wells foundation as a method of implementation. There are two types of foundation types, namely P1 type with a load of 46.093 tons and P2 type of foundation with a load of 78.517 tons. The carrying capacity of the land for type 1 was 59,227 tons, with a decrease of 0,143 Cm. While the carrying capacity of P2 type is 118.1 tons with a reduction in type 2 of 0.202 Cm. The maximum reduction requirement is 2.5 Cm, then of each kind of foundation the safe reduction condition. The planned foundation of the primary reinforcement uses 12 D19, and the spiral reinforcement uses Ø10-100. For support of the pile cap, the X direction uses D19-175, and the Y direction uses D19-175.Pondasi berfungsi untuk menahan beban pada struktur atas yang diteruskan ke lapisan tanah. Perolohan data menggunakan data primer dan sekunder, serta meninjau langsung ke tempat proyek pembangunan. Pemilihan pondasi sumuran karena lokasi sempit lokasi sempit dan minim getaran memilih pondasi sumuran sebagai metode pelaksanaan. Terdapat 2 jenis tipe pondasi, yaitu tipe P1 dengan beban yang dipikul sebesar 46,093 ton dan tipe pondasi P2 dengan beban yang dipikul sebesar 78,517 ton. Daya dukung tanah untuk tipe 1 sebesar 59,227 ton, dengan penurunan sebesar 0,143 Cm. Sedangkan daya dukung tanah tipe P2 sebesar 118,1 ton dengan penurunan tipe 2 sebesar 0,202 Cm. syarat penurunan maksimal adalah 2,5 Cm, maka dari masing-masing tipe pondasi syarat penurunan aman. Pondasi yang direncanakan tulangan utama menggunakan 12 D19 dan tulangan spiral menggunakan Ø10 – 100. Untuk penulangan pile cap arah X menggunakan D19 – 175 dan arah Y menggunakan D19 – 175.
STUDI PELAKSANAAN KINERJA PERCEPATAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG BANK DARAH RUMAH SAKIT Dr. SOEDOMO Widodo Restu Putra; Ahmad Ridwan; Yosef Cahyo; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (148.642 KB) | DOI: 10.30737/jurmateks.v3i1.892

Abstract

Dr.Soedomo Trenggalek Hospital has a goal to realize an optimal service for the community through the availability of supporting infrastructures. One of them is the Blood Bank Building Hospital. This study aims to determine how much cost efficiency and time efficiency of the Blood Bank Building construction project at Dr. Soedomo Trenggalek Hospital are accelerated for seven days. The research method used is the "S" Curve method to monitor project implementation in terms of cost and work performance. Furthermore, the Arrow Diagram method is used to speed up the time of project implementation by determining the critical path and paying attention to activities on the critical path to know the activities that need to be accelerated. The Blood Bank Building Construction Project was scheduled to be completed for 120 days with a Budget Plan of Rp. 891,374,000.00. After accelerating seven days to 113 days, a cost increase of Rp. 20,772,189.68. After accelerating 12 days from 120 to 108 days, an increase in costs of Rp. 26,627,020.90.Rumah Sakit Dr.Soedomo Trenggalek memiliki tujuan untuk mewujudkan pelayanan yang optimal bagi masyarakat melalui tersedianya sarana infrastruktur pendukung. Salah satunya adalah Gedung Bank Darah Rumah Sakit. Penelitian ini bertujuan untuk mengetahui berapa efisiensi biaya dan efisiensi waktu proyek pembangunan Gedung Bank Darah Rumah Sakit Dr.Soedomo Trenggalek jika dilakukan percepatan selama 7 hari. Metode penelitian yang digunakan adalah metode Kurva “S” untuk memantau pelaksanaan proyek ditinjau dari segi biaya dan prestasi kerja. Selanjutnya, metode Diagram Panah digunakan untuk mempercepat waktu pelaksanaan proyek dengan cara menentukan jalur kritis dan memperhatikan kegiatan – kegiatan pada jalur kritis agar dapat mengetahui kegiatan – kegiatan yang perlu dipercepat. Dalam Proyek Pembangunan Gedung Bank Darah tersebut dijadwalkan selesai selama 120 hari dengan Rencana Anggaran Biaya sebesar Rp. 891.374.000,00. Setelah dilakukan percepatan 7 hari menjadi 113 hari didapat kenaikan biaya sebesar Rp. 20.772.189,68. Setelah dilakukan percepatan 12 hari dari 120 menjadi 108 hari didapat kenaikan biaya sebesar Rp. 26.627.020,90.
PERBANDINGAN KEKUATAN BETON DENGAN CAMPURAN DRAMIX STEEL FIBER DAN TULANGAN WIREMESH PADA RIGID PAVEMENT Two Puji Guntur A; Yosef Cahyo; Sigit Winarto; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 1, No 2 (2018): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1001.818 KB) | DOI: 10.30737/jurmateks.v1i2.419

Abstract

Concrete has weaknesses. Namely, it has low tensile strength and is brittle in nature, so that the concrete is given steel reinforcement to anticipate it. In this study, the concrete mixture was added with dramatic steel fiber. This addition was carried out to study and determine the effect of dramatic steel fiber on compressive strength, flexural strength in normal quality concrete with the addition of 0%, 10%, 20%, and 30% in compressive load. Testing is carried out after 28 days. Concrete with the addition of 30% dramatic steel fiber is more capable of producing high compressive strength values than others. The addition of dramatic steel fiber resulted in an average compressive strength of 0%, 29.07 MPa, 10%, 29.33 MPa, 20%, 29.40 MPa, 30%, 29.58 MPa. For concrete flexural strength in beam samples 15/15/60, the highest is in the concrete mixture, and the addition of dramatic steel fiber is 5.44 MPa, higher than the addition of wiremesh m8 reinforcing steel, which is 4.96 MPa. Beton mempunyai kelemahan yaitu mempunyai kuat tarik yang rendah dan bersifat getas (brittle) sehingga beton diberi tulangan baja untuk mengantisipasinya. Pada penelitian ini, campuran beton diberi bahan tambahan dramix steel fiber. Penambahan ini dilakukan untuk mempelajari dan mengetahui pengaruh dramix steel fiber terhadap kuat tekan, kuat lentur pada beton mutu normal dengan penambahan 0%, 10%, 20% dan 30% pada beban tekan. Pengujian dilakukan setelah 28 hari. Beton dengan penambahan dramix steel fiber 30% lebih mampu menghasilkan nilai kuat tekan tinggi dari pada yang lainya. Penambahan dramix steel fiber menghasilakan kuat tekan rata-rata yaitu 0%, 29,07 MPa ,10%, 29,33 MPa, 20%, 29,40 MPa, 30%,29,58 MPa. Untuk kuat lentur beton pada sampel balok 15/15/60 yang paling tinggi yaitu pada campuran beton dan penambahan dramix steel fiber sebesar 5,44 MPa, lebihtinggi dari pada penambahan besi tulangan wiremesh m8 yaitu sebesar 4,96 MPa. 
PEMANFAATAN LIMBAH PUNTUNG ROKOK FILTER SEBAGAI BAHAN CAMPURAN BETON RINGAN BERPORI Agata Iwan Candra; Edy Gardjito; Yosef Cahyo; Andri Dwi Cahyono; Zendy Bima Mahardana
U Karst Vol 3, No 1 (2019): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (290.822 KB) | DOI: 10.30737/ukarst.v3i1.365

Abstract

Concrete is a vital component of construction. One of them is lightweight concrete consisting of a mixture of coarse aggregate, fine aggregate, cement which is united by water in a predetermined ratio. Lightweight concrete is concrete which has a weight of less than 2000kg / m³, lightweight concrete usually uses aggregate or lightweight material so that the concrete produced also has a light specific gravity. Waste cigarette filler waste is a waste that is difficult to recycle. Cotton filter cigarette butts are cotton-based fibers that are lightweight, porous and easily absorb water. For the use of this waste as a substitute for overall coarse aggregate, research needs to be carried out, namely the amount of compressive strength produced by replacing coarse aggregate from cigarette butts waste, job mix used according to SNI K-125 by completely replacing coarse aggregate with cigarette butts waste, Job mix for 1m³ concrete consists of 276 kg of cement, 214 liters of water, 148.62 kg of cigarette butts, and 828 kg of sand. From the above research, the highest compressive strength at 28 days reached K-115.56, which means that the target for concrete paving has reached K-100. As for the absorption, value is quite high from consecutive tests for ¼ hours, 1 hour, 4 hours, and 24 hours produced an average value of 0.116 liters, 0.269 liters, 0.374 liters, 0.699 liters. The results of the study of concrete density with a coarse aggregate of cigarette butts waste reached an average of 1831.11 kg / m³, for the study the pore figures yielded an average value of 0.2854, then the results of the porosity values obtained an average of 0.222016.                                                 AbstrakBeton merupakan komponen vital pada suatu konstruksi. Salah satunya beton ringan yang terdiri dari campuran agregat kasar, agregat halus, semen yang dipersatukan oleh air dengan perbandingan yang telah ditentukan. Beton ringan adalah beton yang memiliki berat kurang dari 2000kg/m³, beton ringan biasanya menggunakan agregat atau bahan yang ringan sehingga beton yang di hasilkan juga memiliki berat jenis yang ringan. Limbah puntung rokok fillter adalah suatu limbah yang sulit untuk di daur ulang. Puntung rokok fillter berbahan dasar kapas yang merupakan serat yang memiliki sifat ringan, berpori, dan mudah menyerap air. Untuk penggunaan limbah ini sebagai pengganti agregat kasar secara menyeluruh perlu diadakan  penelitian yaitu besarnya kuat tekan yang di hasilkan dengan penggantian agregat kasar dari limbah puntung rokok tersebut, job mix yang digunakan sesuai SNI K-125 dengan mengganti sepenuhnya agregat kasar dengan limbah puntung rokok,,job mix untuk 1m³ beton terdiri dari semen 276 Kg, air 214 liter, puntung rokok 148,62 Kg, dan pasir sebanyak 828 Kg. Dari penelitian di atas diperoleh nilai kuat tekan pada umur beton 28 hari tertinggi mencapai K-115,56 yang berarti telah mencapai target untuk paving beton sebesar  K-100. Sedangkan untuk nilai absorsinya cukup tinggi dari pengujian berturut-turut selama ¼ jam, 1 jam, 4 jam, dan 24 jam di hasilkan nilai rata-rata  sebesar 0,116 liter, 0,269 liter, 0,374 liter, 0,699 liter. Hasil penelitian dari berat jenis beton dengan agregat kasar limbah puntung rokok mencapai rata-rata 1831,11 Kg/m³, untuk penelitian angka pori di hasilkan nilai rata-rata mencapai 0,2854, selanjutnya hasil nilai porositas diperoleh rata-rata mencapai 0,222016.
PENELITIAN PENAMBAHAN BAHAN BATU PADAS PADA CAMPURAN ASPAL BETON Supriadi Supriadi; Yosef Cahyo; Ahmad Ridwan; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 1 (2019): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (698.684 KB) | DOI: 10.30737/jurmateks.v2i1.407

Abstract

Asphalt Concrete (Hotmix) is a mixture of coarse aggregate, fine aggregate and filler (Filler) with asphalt binder in high temperature conditions with the composition studied and regulated by technical specifications. In this study, asphalt concrete mixtures were given materials additional padas. This addition was carried out to study and determine the effect of padas on the asphalt concrete mixture with the addition of 5%, 10%, and 15%. Compressive strength specimens in the form of cylinders with a diameter of 10.09 cm and an average height of 7.8 cm. Testing is done after 2 days. Asphalt with the addition of 5% padas is better able to produce a better value of stability than others. The addition of padas rock produced a strong stability of 5% at 888.0747 kg, 10% at 598,199 kg, 15% at 441,6391 kg. To reach the optimum level, the mixture on concrete asphalt ranges < 5%Aspal Beton (Hotmix) adalah campuran agregat kasar, agregat halus, dan bahan pengisi (Filler) dengan bahan pengikat aspal dalam kondisi suhu tinggi (panas) dengan komposisi yang diteliti dan diatur oleh spesifikasi teknis.. Pada penelitian ini, campuran aspal beton diberi bahan tambahan batu padas. Penambahan ini dilakukan untuk mempelajari dan mengetahui pengaruh batu padas pada campuran aspal beton dengan penambahan 5%, 10%, dan 15%. Benda uji kuat tekan berupa silinder dengan diameter 10,09 cm dan  tinggi rata rata 7,8 cm. Pengujian dilakukan setelah 2 hari. Aspal dengan  penambahan batu padas 5% lebih mampu menghasilkan  nilai stabilitas yang lebih baik dari pada yang lainya. Penambahan batu padas menghasilakan  kuat stabilitas masing masing yaitu 5% sebesar 888.0747 kg, 10% sebesar 598.199 kg, 15% sebesar 441.6391 kg. Untuk mencapai kadar optimum maka campuran padas pada aspal beton berkisar antara < 5%
ANALISA KELAYAKAN SIMPANG EMPAT TAK BERSINYAL MENGGUNAKAN MANUAL KAPASITAS JALAN INDONESIA Sugeng Yani Widodo; Yosef Cahyo; Sigit Winarto; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (257.796 KB) | DOI: 10.30737/jurmateks.v3i1.900

Abstract

The transportation problem is one of the main issues that are difficult to solve in several big cities. When congestion occurs, it can disrupt community activities. We already know that "congestion will cause various negative impacts, both on the driver and in terms of the economy and environment. The intersection of four highways, Blitar City, East Java, has the intensity of a dependable vehicle. This is because around the area, and there are markets, residential areas, public force terminals, and squares. Besides that, the place is accessible to public transportation from Blitar City to Malang City. In this study, the authors conducted a field survey of traffic flow, road geometry, and side barriers during rush hour during sunny weather for seven days at the intersection. From the results of the analysis, minor paths have disrupted major pathways and caused delays of 35%. This figure has exceeded the requirements recommended by MKJI 1997. From the results of this study, it can also be an evaluation material so that in the future, the intersection of four Highway, Blitar City, East Java, can be functioned better.Masalah transportasi adalah salah satu masalah utama yang tidak mudah dipecahkan di beberapa kota besar. Pada saat kemacetan terjadi bisa menggangu aktifitas masyarakat. Telah kita ketahui, bahwa kemacetan akan menimbulkan berbagai dampak negatif, baik terhadap pengemudi maupun ditinjau dari segi ekonomi dan lingkungan. Simpang empat Jl. Raya Barat, Kota Blitar, Jawa Timur merupakan salah satu persimpangan dengan intensitas kendaraan yang cukup padat. Hal ini disebabkan karena disekitar simpang empat tersebut terdapat pasar, pemukiman penduduk, terminal angkot, alun – alun. Selain itu, simpang empat tersebut merupakan akses untuk angkutan umum dari Kota Blitar menuju Kota Malang. Pada penelitian ini penulis melakukan survey lapangan terhadap arus lalulintas, geometri jalan, dan hambatan samping pada jam sibuk saat cuaca cerah selama 7 hari pada simpang empat tersebut. Dari hasil analisa, jalur minor sudah mengganggu jalur mayor dan menyebabkan tundaan sebesar 35%. Angka ini sudah melampaui syarat yang dianjurkan oleh MKJI 1997. Dari hasil penelitian ini juga dapat menjadi bahan evaluasi agar kedepannya simpang empat Jl. Raya Barat, Kota Blitar, Jawa Timur, bisa difungsikan dengan lebih baik.
ANALISA KINERJA SIMPANG TAK BERSINYAL JALAN SIMPANG BRANGGAHAN NGADILUWIH KABUPATEN KEDIRI Aditiya Yayang Nurkafi; Yosef Cahyo; Sigit Winarto; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 1 (2019): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1170.337 KB) | DOI: 10.30737/jurmateks.v2i1.408

Abstract

The development of transportation in the Kediri Regency has an impact on increasing people's daily activities in the transportation sector. So far, the Branggahan Ngadiluwih road section at the crossroads leading to the connecting bridge between Ngadiluwih sub-district and Mojo sub-district, at certain hours, there is often traffic activity due to road performance, which plays an important role in transportation activities. This study aims to determine: the value of capacity (C), degree of saturation (DS), the queue of opportunity (QP), and the value of traffic delay (DT) at the intersection. The method used is data collection based on the MKJI 1997. Based on the results of research and discussion of the performance of the Branggahan Ngadiluwih intersection, the value of the queuing opportunity is between 52.287% - 105.135%, the average value of the delay in traffic exceeds 15 sec / SMP, the value of degrees saturation exceeds the standard, namely 1.136. To reduce the delay that occurs at the intersection. That exceeds the maximum value (> 15 sec / SMP), it is necessary to install a parking restriction and stop at an approach where there is no shoulder for parking, and a traffic light is needed.Perkembangan transportasi dikabupaten kediri berdampak pada meningkatnya aktivitas keseharian masyarakat di bidang transportasi. Sejauh ini pada ruas jalan branggahan ngadiluwih di simpang jalan menuju jembatan penghubung antara kecamatan ngadiluwih dengan kecamatan mojo pada jam tertentu sering terjadi kesibukan lalu lintas karena kinerja jalan yang menjadi peranan penting dalam kegiatan transportasi. Penelitian ini bertujuan  mengetahui: nilai kapasitas (C), derajat kejenuhan (DS), antrian peluang (QP) serta nilai tundaan lalu lintas (DT) pada persimpangan tersebut. Metode yang digunakan adalah pengumpulan data yang berpedoman pada MKJI 1997. Berdasarkan hasil penelitian dan pembahasan kinerja simpang Branggahan Ngadiluwih memiliki nilai peluang antrian disimpang tersebut antara 52,287% - 105,135%, nilai tundaan pada lalu lintas rata-rata melebihi 15 det/smp, nilai derajat kejenuhan melebihi standart yaitu 1,136. Untuk menurunkan tundaan pada simpang yang melebihi nilai maksimum (>15 det/smp) besarnya perlu dipasang larangan parkir dan berhenti di pendekat yang tidak tersedia bahu untuk parkir serta perlu pemasangan lampu lalu lintas (Traffic Light).
ANALISIS PERENCANAAN OVERLAY PADA RUAS JALAN CRAKEN-NGULUNGKULON NAMBAK-NGULUNGKULON DENGAN BAHAN ACL PADA STA 0.00-13.345 KECAMATAN MUNJUNGAN KABUPATEN TRENGGALEK Wisnu Arganata; Arthur Daniel Limantara; Yosef Cahyo; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 1 (2019): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (497.195 KB) | DOI: 10.30737/jurmateks.v2i1.404

Abstract

Nowadays, the development of road capacity and vehicle quantity and the lack of optimal traffic infrastructure operations are the main problems in the Nambak-Ngulungkulon Craken-Ngulungkulon road section. This road is the object of observation because the road is an integrated system of the Nambak-Ngulungkulon Craken-Ngulungkulon road network. It is necessary to analyze how the performance and the thickness of the flexible pavement layer needed. To analyze road performance and calculate pavement thickness, the writer uses the Bina Marga 2017 method with ACL material at STA 0.00 - 13,345. The results of the analysis and calculation for the geometric planning of the Nambak-Ngulungkulon  Craken-Ngulungkulon road section obtained the value of surface course with the 2017 Bina Marga method of 13 cm. Overlay work on the planning age is carried out in the 15 the year with an additional layer thickness with the Bina Marga 2017 method of 3 cm. And the traffic growth rate increased by 28.65% for 10 years y.a.d.Saat ini pengembangan kapasitas jalan dan kuantitas kendaraan dan kurangnya operasi infrastruktur lalu lintas yang optimal adalah masalah utama di ruas jalan Nambak-Ngulungkulon Craken-Ngulungkulon. Jalan ini adalah objek pengamatan karena jalan tersebut merupakan sistem yang terintegrasi dari jaringan jalan Nambak-Ngulungkulon Craken-Ngulungkulon. Perlu untuk menganalisis bagaimana kinerja dan ketebalan lapisan perkerasan lentur yang dibutuhkan. Untuk menganalisis kinerja jalan dan menghitung tebal perkerasan, penulis menggunakan metode Bina Marga 2017 dengan material ACL di STA 0,00 - 13,345. Hasil analisis dan perhitungan untuk perencanaan geometrik ruas jalan Nambak-Ngulungkulon Craken-Ngulungkulon diperoleh nilai permukaan jalan dengan metode Bina Marga 2017 13 cm. Pekerjaan overlay pada usia perencanaan dilakukan pada tahun ke-15 dengan tambahan ketebalan lapisan dengan metode Bina Marga 2017 3 cm. Dan tingkat pertumbuhan lalu lintas meningkat sebesar 28,65% selama 10 tahun y.a.d.