PENELITIAN PENAMBAHAN BAHAN BATU PADAS PADA CAMPURAN ASPAL BETON Supriadi Supriadi; Yosef Cahyo; Ahmad Ridwan; Agata Iwan Candra
Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS) Vol. 2 No. 1 (2019): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v2i1.407

Abstract

Asphalt Concrete (Hotmix) is a mixture of coarse aggregate, fine aggregate and filler (Filler) with asphalt binder in high temperature conditions with the composition studied and regulated by technical specifications. In this study, asphalt concrete mixtures were given materials additional padas. This addition was carried out to study and determine the effect of padas on the asphalt concrete mixture with the addition of 5%, 10%, and 15%. Compressive strength specimens in the form of cylinders with a diameter of 10.09 cm and an average height of 7.8 cm. Testing is done after 2 days. Asphalt with the addition of 5% padas is better able to produce a better value of stability than others. The addition of padas rock produced a strong stability of 5% at 888.0747 kg, 10% at 598,199 kg, 15% at 441,6391 kg. To reach the optimum level, the mixture on concrete asphalt ranges < 5%Aspal Beton (Hotmix) adalah campuran agregat kasar, agregat halus, dan bahan pengisi (Filler) dengan bahan pengikat aspal dalam kondisi suhu tinggi (panas) dengan komposisi yang diteliti dan diatur oleh spesifikasi teknis.. Pada penelitian ini, campuran aspal beton diberi bahan tambahan batu padas. Penambahan ini dilakukan untuk mempelajari dan mengetahui pengaruh batu padas pada campuran aspal beton dengan penambahan 5%, 10%, dan 15%. Benda uji kuat tekan berupa silinder dengan diameter 10,09 cm dan  tinggi rata rata 7,8 cm. Pengujian dilakukan setelah 2 hari. Aspal dengan  penambahan batu padas 5% lebih mampu menghasilkan  nilai stabilitas yang lebih baik dari pada yang lainya. Penambahan batu padas menghasilakan  kuat stabilitas masing masing yaitu 5% sebesar 888.0747 kg, 10% sebesar 598.199 kg, 15% sebesar 441.6391 kg. Untuk mencapai kadar optimum maka campuran padas pada aspal beton berkisar antara < 5%
ANALISA KINERJA SIMPANG TAK BERSINYAL JALAN SIMPANG BRANGGAHAN NGADILUWIH KABUPATEN KEDIRI Aditiya Yayang Nurkafi; Yosef Cahyo; Sigit Winarto; Agata Iwan Candra
Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS) Vol. 2 No. 1 (2019): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v2i1.408

Abstract

The development of transportation in the Kediri Regency has an impact on increasing people's daily activities in the transportation sector. So far, the Branggahan Ngadiluwih road section at the crossroads leading to the connecting bridge between Ngadiluwih sub-district and Mojo sub-district, at certain hours, there is often traffic activity due to road performance, which plays an important role in transportation activities. This study aims to determine: the value of capacity (C), degree of saturation (DS), the queue of opportunity (QP), and the value of traffic delay (DT) at the intersection. The method used is data collection based on the MKJI 1997. Based on the results of research and discussion of the performance of the Branggahan Ngadiluwih intersection, the value of the queuing opportunity is between 52.287% - 105.135%, the average value of the delay in traffic exceeds 15 sec / SMP, the value of degrees saturation exceeds the standard, namely 1.136. To reduce the delay that occurs at the intersection. That exceeds the maximum value (> 15 sec / SMP), it is necessary to install a parking restriction and stop at an approach where there is no shoulder for parking, and a traffic light is needed.Perkembangan transportasi dikabupaten kediri berdampak pada meningkatnya aktivitas keseharian masyarakat di bidang transportasi. Sejauh ini pada ruas jalan branggahan ngadiluwih di simpang jalan menuju jembatan penghubung antara kecamatan ngadiluwih dengan kecamatan mojo pada jam tertentu sering terjadi kesibukan lalu lintas karena kinerja jalan yang menjadi peranan penting dalam kegiatan transportasi. Penelitian ini bertujuan  mengetahui: nilai kapasitas (C), derajat kejenuhan (DS), antrian peluang (QP) serta nilai tundaan lalu lintas (DT) pada persimpangan tersebut. Metode yang digunakan adalah pengumpulan data yang berpedoman pada MKJI 1997. Berdasarkan hasil penelitian dan pembahasan kinerja simpang Branggahan Ngadiluwih memiliki nilai peluang antrian disimpang tersebut antara 52,287% - 105,135%, nilai tundaan pada lalu lintas rata-rata melebihi 15 det/smp, nilai derajat kejenuhan melebihi standart yaitu 1,136. Untuk menurunkan tundaan pada simpang yang melebihi nilai maksimum (>15 det/smp) besarnya perlu dipasang larangan parkir dan berhenti di pendekat yang tidak tersedia bahu untuk parkir serta perlu pemasangan lampu lalu lintas (Traffic Light).
ANALISA PERBANDINGAN MANAJEMEN WAKTU ANTARA PERENCANAAN DAN PELAKSANAAN Rohmatun Hidayah; Ahmad Ridwan; Yosef Cahyo
Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS) Vol. 1 No. 2 (2018): OCTOBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i2.416

Abstract

The success or failure of project implementation is often caused by lack of planned project activities, as well as ineffective controls, so that project activities are not efficient. This will cause delays as well as a decrease in the quality of work, and result in inflated implementation costs. Project management is carried out to manage the project from the initial implementation until the completion of the project. The case study in this study was the construction of the Sananul Huda Islamic Boarding School Dormitory Building as a means and infrastructure for teaching and learning activities in the boarding school environment located in Sumberagung village, Selorejo District, Blitar Regency. PERT and CPM methods are used to find out how long a project is completed and look for the possibility of acceleration of project implementation time. The purpose of this study is to find out the time efficiency in terms of the two methods. The results of the time management analysis using PERT and CPM methods obtained critical path for 102 working days, and obtained optimal time by accelerating up to 5 working days to 97 working days with an increase in costs to Rp.957,058,508. Keberhasilan ataupun kegagalan dari pelaksanaan proyek sering kali disebabkan oleh kurang terencananya kegiatan proyek tersebut, serta pengendalian yang kurang efektif, sehingga kegiatan proyek tidak efisien. Hal ini akan menyebabkan keterlambatan serta menurunnya kualitas pekerjaan, dan mengakibatkan membengkaknya biaya peaksanaan. Manajemen proyek dilakukan untuk mengelola proyek dari awal pelaksanaan hingga selesainya proyek tersebut. Studi kasus pada penelitian ini adalah Pembangunan Gedung Asrama Pondok Pesantren Sananul Huda sebagai sarana dan prasarana dalam kegiatan belajar mengajar dalam lingkungan pondok pesantren yang terletak di desa Sumberagung, Kecamatan Selorejo, Kabupaten Blitar. Metode PERT dan CPM digunakan untuk mengetahui berapa lama suatu proyek tersebut diselesaikan dan mencari adanya kemungkinan percepatan waktu pelaksanaan proyek. Tujuan dari penelitian ini umtuk mengetahiu efisiensi waktu ditinjau dari dua metode tersebut. Hasil analisa manajemen waktu menggunakan metode PERT dan CPM didapat jalur kritis selama 102 hari kerja, dan didapat waktu optimal dengan dipercepat hingga 5 hari kerja yaitu menjadi 97 hari kerja dengan kenaikan biaya menjadi sebesar RP.957.058.508;
PERBANDINGAN KEKUATAN BETON DENGAN CAMPURAN DRAMIX STEEL FIBER DAN TULANGAN WIREMESH PADA RIGID PAVEMENT Two Puji Guntur A; Yosef Cahyo; Sigit Winarto; Agata Iwan Candra
Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS) Vol. 1 No. 2 (2018): OCTOBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i2.419

Abstract

Concrete has weaknesses. Namely, it has low tensile strength and is brittle in nature, so that the concrete is given steel reinforcement to anticipate it. In this study, the concrete mixture was added with dramatic steel fiber. This addition was carried out to study and determine the effect of dramatic steel fiber on compressive strength, flexural strength in normal quality concrete with the addition of 0%, 10%, 20%, and 30% in compressive load. Testing is carried out after 28 days. Concrete with the addition of 30% dramatic steel fiber is more capable of producing high compressive strength values than others. The addition of dramatic steel fiber resulted in an average compressive strength of 0%, 29.07 MPa, 10%, 29.33 MPa, 20%, 29.40 MPa, 30%, 29.58 MPa. For concrete flexural strength in beam samples 15/15/60, the highest is in the concrete mixture, and the addition of dramatic steel fiber is 5.44 MPa, higher than the addition of wiremesh m8 reinforcing steel, which is 4.96 MPa. Beton mempunyai kelemahan yaitu mempunyai kuat tarik yang rendah dan bersifat getas (brittle) sehingga beton diberi tulangan baja untuk mengantisipasinya. Pada penelitian ini, campuran beton diberi bahan tambahan dramix steel fiber. Penambahan ini dilakukan untuk mempelajari dan mengetahui pengaruh dramix steel fiber terhadap kuat tekan, kuat lentur pada beton mutu normal dengan penambahan 0%, 10%, 20% dan 30% pada beban tekan. Pengujian dilakukan setelah 28 hari. Beton dengan penambahan dramix steel fiber 30% lebih mampu menghasilkan nilai kuat tekan tinggi dari pada yang lainya. Penambahan dramix steel fiber menghasilakan kuat tekan rata-rata yaitu 0%, 29,07 MPa ,10%, 29,33 MPa, 20%, 29,40 MPa, 30%,29,58 MPa. Untuk kuat lentur beton pada sampel balok 15/15/60 yang paling tinggi yaitu pada campuran beton dan penambahan dramix steel fiber sebesar 5,44 MPa, lebihtinggi dari pada penambahan besi tulangan wiremesh m8 yaitu sebesar 4,96 MPa. 
UJI KUAT TEKAN DAN ARBSORPSI PADA BETON RINGAN DENGAN PENAMBAHAN LIMBAH BATA RINGAN DAN BUBUK TALEK Krisna Dwi Kurniawan; Ahmad Ridwan; Yosef Cahyo
Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS) Vol. 3 No. 1 (2020): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v3i1.872

Abstract

Concrete is one of the construction components used in buildings, bridges, or roads. In this study, The authors learned to create concrete that is lighter than standard concrete, that is by using light cement with a weight of 0%, 10% 20%, 30%, 40% of the volume of sand and talc powder weighing 8% of the volume of cement. The strength targeted in this study is k-225. Meanwhile, this study's results are the value of concrete compressive strength, which is increased by the target set k-225 to be k-400 in one of the normal concrete samples and has an average of k-360. 10% 20%, 30%, 40% and 8% talc powder increase with each average yield of k-294, k271, k-251, and k-225. To check the absorption of concrete samples, check the average increase in immersion 1 hour 0.0016%, 4 hours 0.0027%, and 24 hours 0.0047%. For the results of testing the type of weight, from each variation of test specimens 1 - 5, the resolution decreases 2.26, 2.24, 2.23, 2.16, and 2.028. The one with the lowest specific gravity is variation five concrete, with a variation of the average specific gravity 2,028.Beton merupakan salah satu komponen konstruksi yang pada umumnya digunakan pada bangunan gedung, jembatan maupun jalan. Pada penelitian ini Penulis bertujuan untuk menciptakan Beton yang lebih ringan dari pada Beton normal yaitu  menggunakan tambahan limbah bata ringan dengan bobot 0% , 10% 20%, 30%, 40% dari volume pasir dan bubuk talek dengan bobot 8% dari volume semen. Kekuatan yang ditargetkan pada penelitian ini adalah k-225. Adapun hasil dari penelitian ini adalah nilai kuat tekan Beton mengalami peningkatan target yaitu yang awalnya k-225 menjadi k-400 pada salah satu sampel Beton normal dan memiliki rata- rata k-360. Kemudian hasil nilai kuat tekan Beton dengan penambahan limbah bata ringan  10% 20%, 30%, 40% dan bubuk talek 8% mengalami penurunan yaitu dengan masing-masing hasil rata- rata k-294, k271,k-251, dan k-225. Untuk pemeriksaan arbsorpsi Beton sampel mengalami kenaikaan rata-rata yaitu pada perendaman 1 Jam 0,0016%, 4 Jam 0,0027% dan 24 Jam 0,0047%. Untuk hasil pemeriksaan berat jenis, dari setiap benda uji dari variasi 1 – 5 mengalami penurunan masing masing 2,26, 2,24, 2,23, 2,16 dan 2,028 maka yang memiliki berat jenis paling rendah adalah Beton variasi 5 yaitu dengan rata rata berat jenis 2,028.
PENGARUH PENAMBAHAN ABU CANGKANG KEMIRI TERHADAP KUAT TEKAN BETON K-300 Moh. Abdul Basit Minanulloh; Yosef Cahyo; Ahmad Ridwan
Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS) Vol. 3 No. 1 (2020): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v3i1.875

Abstract

K-300 concrete is concrete that has a characteristic compressive strength of 300 kg/cm2.  Many studies that use plantation and mining waste materials are simply wasted. These wastes are in the form of kemiri shell ash, rice husk ash, and others. in this study, kemiri shell ash as a cement additive, with variations in the addition of 5%, 10%, and 15% of the weight of cement to the quality of K-300 concrete. Concrete compressive tests carried out at the age of 7 and 28 days. The purpose of this study was to determine the compressive strength of concrete, the highest pressure strength, and the optimum percentage. Strong concrete pressure characteristics obtained at 28 days at a normal concrete variation 304.127 kg / cm, normal concrete variations with the addition of 5% “Abu Cangkang kemiri” 421,551 kg / cm, normal concrete variations with the addition of 10% “Abu Cangkang kemiri” 426,863 kg / cm2, and variations  normal concrete with the addition of 15% “Abu Cangkang kemiri” 428,210 kg / cm.  The results show that the optimum percentage of the addition of kemiri shell ash is 15% of the weight of cement with a maximum compressive strength of 428,210 kg/cm.  Beton K-300 adalah beton yang mempunyai kuat tekan karakteristik sebesar 300 kg/cm². Banyak penelitian yang menggunakan bahan – bahan limbah perkebunan dan tambang yang terbuang begitu saja. Limbah tersebut berupa abu cangkang kemiri, abu sekam Padi, dan lain- lain. Pada penelitian ini menggunakan abu cangkang Kemiri sebagai bahan tambah semen, dengan variasi penambahan 5%, 10%, dan 15%  dari berat semen terhadap mutu beton K-300. Uji tekan beton dilaksanakan pada umur 7 dan 28 hari. Tujuan penelitian ini adalah untuk mengetahui kuat tekan beton dan  kuat tekan tertinggi. Kuat tekan karakteristik yang diperoleh pada umur 28 hari pada variasi beton normal 304,127 kg/cm², variasi beton normal dengan penambahan 5% abu cangkang  Kemiri 421,551 kg/cm², variasi beton normal dengan penambahan10% abu cangkang Kemiri 426,863kg/cm², dan variasi beton normal dengan penambahan 15% abu cangkang Kemiri 428,210 kg/cm². Hasil penelitian menunjukkan bahwa presentase optimum dari penambahan abu cangang Kemiri  adalah sebesar15% dari berat semen dengan kuat tekan maksimum sebesar 428,210 kg/cm².
PERENCANAAN PONDASI SUMURAN PADA PROYEK PEMBANGUNAN GEDUNG ASRAMA BALAI PEMBANGUNAN SDM DAN PERTANIAN BANTUL DIY Moh. Idham Cholid; Sigit Winarto; Yosef Cahyo; Agata Iwan Candra
Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS) Vol. 3 No. 1 (2020): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v3i1.888

Abstract

The foundation serves to hold the burden on the upper structure, which is transmitted to the soil layer. Data collection uses primary and secondary data, as well as direct visits to the development project site. The choice of wells foundation because of the restricted location of restricted location and minimal vibration chose the wells foundation as a method of implementation. There are two types of foundation types, namely P1 type with a load of 46.093 tons and P2 type of foundation with a load of 78.517 tons. The carrying capacity of the land for type 1 was 59,227 tons, with a decrease of 0,143 Cm. While the carrying capacity of P2 type is 118.1 tons with a reduction in type 2 of 0.202 Cm. The maximum reduction requirement is 2.5 Cm, then of each kind of foundation the safe reduction condition. The planned foundation of the primary reinforcement uses 12 D19, and the spiral reinforcement uses Ø10-100. For support of the pile cap, the X direction uses D19-175, and the Y direction uses D19-175.Pondasi berfungsi untuk menahan beban pada struktur atas yang diteruskan ke lapisan tanah. Perolohan data menggunakan data primer dan sekunder, serta meninjau langsung ke tempat proyek pembangunan. Pemilihan pondasi sumuran karena lokasi sempit lokasi sempit dan minim getaran memilih pondasi sumuran sebagai metode pelaksanaan. Terdapat 2 jenis tipe pondasi, yaitu tipe P1 dengan beban yang dipikul sebesar 46,093 ton dan tipe pondasi P2 dengan beban yang dipikul sebesar 78,517 ton. Daya dukung tanah untuk tipe 1 sebesar 59,227 ton, dengan penurunan sebesar 0,143 Cm. Sedangkan daya dukung tanah tipe P2 sebesar 118,1 ton dengan penurunan tipe 2 sebesar 0,202 Cm. syarat penurunan maksimal adalah 2,5 Cm, maka dari masing-masing tipe pondasi syarat penurunan aman. Pondasi yang direncanakan tulangan utama menggunakan 12 D19 dan tulangan spiral menggunakan Ø10 – 100. Untuk penulangan pile cap arah X menggunakan D19 – 175 dan arah Y menggunakan D19 – 175.
STUDY PERENCANAAN PONDASI GEDUNG GUEST HOUSE 6 LANTAI DI KOTA KEDIRI Supriyadi Supriyadi; Ahmad Ridwan; Yosef Cahyo
Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS) Vol. 3 No. 1 (2020): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v3i1.890

Abstract

The building foundation is a lower structure that functions to carry the weight of the load to the subgrade. The foundation planning study in this study uses a bore pile type of foundation. This study uses the Meyerhoff method based on SPT data received by CV. Arya Duta. In this bore pile foundation planning, the carrying capacity of the bore pile foundation to the ground is 81.00 tons, with a depth of 26 M from the ground surface. The results of the calculation of pile drill piles get P 19.44 tons at the bottom of 26 M while the reinforcement of the pile cap is found in q 1.152 Ton / M (own weight). In the bore pile with spiral support found the results of the analysis data ((D. concrete 600 mm, Blanket 40 mm), (D reinforcement 16 mm, number of reinforcement 10), (D. stirrup 10 mm, Spacing 60 mm)). Based on the overall results of the structure, weight was found 16,771.43 Tons / M. Thus, from the analysis of equivalent lateral force loads (Fi 77.71), it was found that the construction of building structures is earthquake resistant.Pondasi merupakan struktur bawah bangunan yang berfungsi meneruskan berat suatu beban pada bangunan ke tanah dasar. Study perencanaan pondasi pada penelitian ini menggunakan pondasi tipe bore pile. Penelitian ini menggunakan metode Mayerhoff berdasarkan data SPT yang di terima oleh CV. Arya Duta. Pada perencanaan pondasi bore pile ini didapatkan kemampuan daya dukung pondasi bore pile terhadap tanah adalah sebesar 81.00 Ton, dengan kedalaman 26 M dari permukaan tanah. Hasil perhitungan tiang bor pile mendapatkan hasil P 19,44 Ton pada kedalaman 26 M. Sedangkan pada penulangan pile cap di temukan q 1,152 Ton/M (berat sendiri). Pada bore pile dengan tulangan spiral di temukan hasil data analisis ((D.beton 600 mm, Selimut 40 mm), (D tulangan 16 mm, jumlah tulangan 10), (D. sengkang 10 mm, Spasi  60 mm)). Berdasarkan hasil keseluruhan berat struktur ditemukan 16.771,43 Ton/M. Dengan demikian, dari analisis beban gaya lateral ekuivalen (Fi 77,71) didapatkan bahwa, Kontruksi struktur gedung tahan terhadap gempa.
STUDI PELAKSANAAN KINERJA PERCEPATAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG BANK DARAH RUMAH SAKIT Dr. SOEDOMO Widodo Restu Putra; Ahmad Ridwan; Yosef Cahyo; Agata Iwan Candra
Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS) Vol. 3 No. 1 (2020): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v3i1.892

Abstract

Dr.Soedomo Trenggalek Hospital has a goal to realize an optimal service for the community through the availability of supporting infrastructures. One of them is the Blood Bank Building Hospital. This study aims to determine how much cost efficiency and time efficiency of the Blood Bank Building construction project at Dr. Soedomo Trenggalek Hospital are accelerated for seven days. The research method used is the "S" Curve method to monitor project implementation in terms of cost and work performance. Furthermore, the Arrow Diagram method is used to speed up the time of project implementation by determining the critical path and paying attention to activities on the critical path to know the activities that need to be accelerated. The Blood Bank Building Construction Project was scheduled to be completed for 120 days with a Budget Plan of Rp. 891,374,000.00. After accelerating seven days to 113 days, a cost increase of Rp. 20,772,189.68. After accelerating 12 days from 120 to 108 days, an increase in costs of Rp. 26,627,020.90.Rumah Sakit Dr.Soedomo Trenggalek memiliki tujuan untuk mewujudkan pelayanan yang optimal bagi masyarakat melalui tersedianya sarana infrastruktur pendukung. Salah satunya adalah Gedung Bank Darah Rumah Sakit. Penelitian ini bertujuan untuk mengetahui berapa efisiensi biaya dan efisiensi waktu proyek pembangunan Gedung Bank Darah Rumah Sakit Dr.Soedomo Trenggalek jika dilakukan percepatan selama 7 hari. Metode penelitian yang digunakan adalah metode Kurva “S” untuk memantau pelaksanaan proyek ditinjau dari segi biaya dan prestasi kerja. Selanjutnya, metode Diagram Panah digunakan untuk mempercepat waktu pelaksanaan proyek dengan cara menentukan jalur kritis dan memperhatikan kegiatan – kegiatan pada jalur kritis agar dapat mengetahui kegiatan – kegiatan yang perlu dipercepat. Dalam Proyek Pembangunan Gedung Bank Darah tersebut dijadwalkan selesai selama 120 hari dengan Rencana Anggaran Biaya sebesar Rp. 891.374.000,00. Setelah dilakukan percepatan 7 hari menjadi 113 hari didapat kenaikan biaya sebesar Rp. 20.772.189,68. Setelah dilakukan percepatan 12 hari dari 120 menjadi 108 hari didapat kenaikan biaya sebesar Rp. 26.627.020,90.
ANALISA PENJADWALAN DENGAN METODE PERT DAN MATHCAD (Study Kasus Proyek Pembangunan Restaurant Farm House di Lembang) Tofek Nur' Amin; Ahmad Ridwan; Yosef Cahyo
Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS) Vol. 3 No. 1 (2020): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v3i1.895

Abstract

Project control is one of the functions and processes in project management that influences the project's outcome. Project control has an essential role in minimizing any deviations that can occur during the project process. In project scheduling, need to, management planning, schedule, and control. Development of Restaurant Farm House planned by PT. DWI MARTHA JAYA is estimated to take 334 days at the cost of Rp. 9.068.780.000,00. Based on information obtained in the field. The type of research method applied in this research is the schedule analysis method on the RAB (Budget Plan) by comparing and analyzing project scheduling using PERT and MathCad methods. The data collection techniques chosen were observation and documentary. From the results of the analysis, the completion time of the Restaurant Farm House construction project is 310 days and a labor cost savings of Rp. 93,341,832.00 out of a total cost of Rp 9.068.780.000,00. So that an overall loss of Rp 8.975.438.168,00. Pengendalian proyek merupakan salah satu fungsi dan proses dalam manajemen proyek yang berpengaruh pada hasil akhir proyek. Pengendalian proyek mempunyai peran penting dalam meminimalisasi segala penyimpangan yang dapat terjadi selama proses berlangsungnya proyek. Pada penjadwalan proyek diperlukan penanganan manajemen kerja yang terdiri dari perencanaan, penjadwalan dan pengendalian. Pembangunan Restaurant Farm House yang direncanakan oleh PT. DWI MARTHA JAYA diperkirakan memakan waktu 334 hari dengan biaya Rp. 9.068.780.000,00. Hal ini berdasarkan informasi yang diperoleh di lapangan. Jenis metode penelitian yang diterapkan dalam penelitian ini adalah metode analisis time schedule pada RAB (Rencana Anggaran Biaya) dengan membandingkan dan melakukan analisa penjadwalan proyek menggunakan metode PERT dan MathCad. Teknik pengumpulan data yang dipilih adalah dengan observasi dan dokumenter. Dari hasil analisis dengan dua metode tersebut diperoleh waktu penyelesaian proyek pembangunan Restaurant Farm House adalah 310 hari dan diperoleh penghematan biaya tenaga kerja sebesar Rp. 93.341.832,00 dari biaya total Rp 9.068.780.000,00, sehingga diperoleh biaya keseluruhan Rp 8.975.438.168,00.Â