cover
Contact Name
Fatma Hermining Astuti
Contact Email
-
Phone
-
Journal Mail Official
spektrum.industri@ie.uad.ac.id
Editorial Address
Jl. Ringroad Selatan, Kragilan, Tamanan, Banguntapan, Bantul, Yogyakarta 55191
Location
Kota yogyakarta,
Daerah istimewa yogyakarta
INDONESIA
SPEKTRUM INDUSTRI
ISSN : 16936590     EISSN : 24422630     DOI : -
Core Subject : Engineering,
Spektrum Industri is a media published scientific articles in the science scope related to engineering and/or industrial management both research and theoretical. Literature review will be considered if it is written by an expert. Spektrum Industri is published by Universitas Ahmad Dahlan in twice a year, every April and October. 5. Scope : Ergonomic, Work System Design and Product Design, Manufacturing System, Quality Management, Operationsal Research System Modeling, Industrial Management, Decision and Information System, Logistics and Supply Chain Management.
Articles 20 Documents
Search results for , issue "Vol 13, No 2: Oktober 2015" : 20 Documents clear
PENJADWALAN JOB SHOP STATIK DENGAN METODE SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN Husen, Moh.; Masudin, Ilyas; Utama, Dana Marsetiya
SPEKTRUM INDUSTRI Vol 13, No 2: Oktober 2015
Publisher : Universitas Ahmad Dahlan Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (452.921 KB) | DOI: 10.12928/si.v13i2.2689

Abstract

Penjadwalan bagi perusahaan adalah aspek yang sangat penting, karena penjadwalan merupakan salah satu elemen perencanaan dan pengendalian produksi, sehingga perusahaan dapat mengirim barang sesuai dengan waktu yang telah ditentukan, agar diperoleh waktu total penyelesaian yang minimum. Dalam penelitian ini, penjadwalan menggunakan metode Simulated Annealing (SA) dengan bantuan Matlab diharapkan dapat menghasilkan waktu total penyelesaian (makespan) lebih cepat dari penjadwalan yang ada pada perusahaan. Metode SA mensimulasikan proses annealing pada pembuatan materi yang terdiri dari butiran Kristal atau logam. Tujuan dari proses ini adalah menghasilkan struktur kristal yang baik dengan menggunakan energi seminimal mungkin. Permasalahan yang dihadapi oleh perusahaan adalah perusahaan belum mempertimbangkan makespan dalam penyelesaian produk dan penjadwalan produksi untuk produk paket satu rumah kos-kosan. Hal ini berdasarkan data produksi yang terjadi keterlambatan dilihat dari waktu penyelesaian (makespan) produksi, sehingga perusahaan harus menambah 2-5 hari lagi untuk bisa menyelesaikan keseluruhan produk. Dengan menggunakan metode SA menghasilkan makespan 23 jam, lebih cepat 2 jam dari pada penjadwalan awal. Kata kunci : penjadwalan, job shop, simulated annealing, idle time, makespan.
MENENTUKAN STRATEGI PERMASARAN PADA PRODUK BRIKET DENGAN METODE GAME THEORY UNTUK MENINGKATKAN PENJUALAN DI UKM KAISAR BRIKET Ramadhani, Satria; Putra, Boy Isma
SPEKTRUM INDUSTRI Vol 13, No 2: Oktober 2015
Publisher : Universitas Ahmad Dahlan Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (272.419 KB) | DOI: 10.12928/si.v13i2.2694

Abstract

UKM Kaisar Briket is one of the business sectors that briket produce. The problem is not enough briket product known to the public and the market competition, briket product compete with LPG and kerosene so that the competition is encouraging to be albe to search for the right marketing to strategy to compete in the market.the methode game theory can deetermine a marketing strategy through the marketing mix 4P (product, price, place, promotion). Marketing mix divided into severval attribute to know some of the marketing strategy that will be product advantage to attract users briket. Responden data required to obtain the value of matriks calculation game theory methode previously in reliability test and validitas test toknow what valid whether or not the responden data the result of the study showed the briket product have superior strategy and alternative strategies when competitions products. Keyword : marketing, marketing mix, game theory
KERANGKA KESIAPSIAGAAN INDUSTRI MANUFAKTUR SKALA KECIL DI KABUPATEN BANTUL PASCA GEMPA BUMI 2006 Nugroho, Yohanes Anton; Fauzy, Akhmad; Winarno, Setya
SPEKTRUM INDUSTRI Vol 13, No 2: Oktober 2015
Publisher : Universitas Ahmad Dahlan Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (284.701 KB) | DOI: 10.12928/si.v13i2.2690

Abstract

Gempa bumi di kabupaten Bantul pada tahun 2006, menyebabkan korban jiwa serta tingkat kerusakan bangunan dan infrastruktur terbesar di wilayah Daerah Istimewa Yogyakarta. Dampak lain yang ditimbulkan sebanyak sebanyak 2% dari jumlah pekerja di kabupaten Bantul kehilangan pekerjaan dan proyeksi GRDP (Gross Regional Domestic Bruto) mengalami penurunan sebesar Rp. 565.000.000.000 pada tahun 2007. Kondisi tersebut menyebabkan perlunya disusun suatu kerangka kesiapsiagaan, agar industri lebih mampu bertahan apabila menghadapi bencana. Penelitian ini dilakukan untuk mendapatkan kerangka kesiapsiagaan dengan mengembangkan kerangka kesiapsiagaan yang sudah ada, yaitu FEMA (1993), EPICC (2003) dan NFPA (2010). Kerangka kesiapsiagaan selanjutnya perlu dikembangkan dengan memprioritaskan variabel karakteristik dari industri yang sesuai dengan kondisi industri setempat. Kata kunci : Kesiapsiagaan, Industri skala kecil, Bantul
PENGENDALIAN PERSEDIAAN BAHAN BAKU OBAT DENGAN MENGGUNAKAN METODE EOQ PROBABILISTIK BERDASARKAN PERAMALAN EXPONENTIAL SMOOTHING PADA PT. XYZ Dristiana, Fila; Sukmono, Tedjo
SPEKTRUM INDUSTRI Vol 13, No 2: Oktober 2015
Publisher : Universitas Ahmad Dahlan Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (126.236 KB) | DOI: 10.12928/si.v13i2.2695

Abstract

PT. XYZ is one of the manufactures of parmacheutical. Problems which often appeared are surplus and shortage material. Inventory material control not optimum because order only esimate. With exponential smoothing method can be devise of demand next period and EOQ Probabilistic for to know economic order quantity, total safety stock and reorder point so can minimization inventory cost. Purpose of research are to know exponential smoothing method what representatif for manufacture and give recomendation of this research. Results of research are exponential smoothing method representatif for manufacture and EOQ probabilistic method for Antalgin, Paracetamol and Piroxicam material are economic order quantity in the amount of 313 kg, 928 kg and 33 kg, safety stock 160 kg, 403 kg and 2kg and reorder point 325 kg, 1080 kg dan 14 kg. So total inventory cost of Antalgin, Paracetamol and Piroxicam material in the amount of Rp.3.847.146, Rp.5.025.081 and Rp.1.932.255. Keyword : Inventory, Exponential Smoothing, EOQ Probabilistic
PENERAPAN METODE PERAMALAN SEBAGAI ALAT BANTU UNTUK MENENTUKAN PERENCANAAN PRODUKSI DI PT. SKK Wahyani, Widhy; Syaichu, Achmad
SPEKTRUM INDUSTRI Vol 13, No 2: Oktober 2015
Publisher : Universitas Ahmad Dahlan Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (220.202 KB) | DOI: 10.12928/si.v13i2.2691

Abstract

Pada PT. SKK., bahan baku yang ada sering kali tidak bisa mendukung kelancaran proses produksi, tenaga kerja dan fasilitas produksi yang ada tidak sesuai dengan yang dibutuhkan. Begitu juga dengan kapasitas produksi, output yang dihasilkan tidak bisa memenuhi permintaan supplier yang bersifat naik turun (fluktuatif). Akibatnya, produktivitas perusahaan menurun karena banyaknya permintaan (order) yang ditolak oleh perusahaan. Maka tujuan diakannya penelitian ini adalah mengestimasikan (meramalkan) permintaan pasar dimana bisa dijadikan dasar untuk membuat suatu perencanaan produksi, dengan menentukan berapa jumlah produk yang akan dihasilkan, kapan dan berapa jumlah bahan baku yang harus disediakan untuk mendukung kelancaran proses produksi, mendayagunakan sumberdaya yang terbatas secara efektif, dan meningkatkan kapasitas produksi guna memenuhi naik turunnya (fluktuatif) permintaan, sehingga produktivitas perusahaan dapat ditingkatkan. Setelah dilakukan peramalan melalui bantuan perangkat lunak Software QM for Windows khususnya untuk Metode Regresi Linier diperoleh nilai yang lebih kecil, dimana untuk masing – masing itemnya adalah sebagai berikut: untuk MAD = 8.812, MSE = 146.237.392, Bias = 0, untuk periode berikutnya diramalkan permintaannya sebesar 63.291,6 unit. Sedangkan jika menggunakan metode Exponential Smoothing diperoleh nilai-nilai sebagai berikut: untuk MAD = 13.374,1484, MSE = 235.115.376, Bias = -549,8485, untuk periode berikutnya diramalkan jumlah permintaannya adalah sebesar 54.922,2266 unit. Sebagaimana diketahui bahwa nilai dari Metode Regresi Linier lebih kecil dibandingkan dengan metode Exponential Smoothing yang memiliki nilai ukuran akurasi kesalahan yang lebih kecil baik secara manual maupun dengan menggunakan software QM for Windows. Kata kunci : perencanaan produksi, peramalan, QM for Windows, Exponential Smoothing, Regresi Linier
DESAIN ORGANISASI KERJA BERBASIS ERGONOMI DI STASIUN KERJA BLANKET BASAH INDUSTRI KARET PALEMBANG Setiawan, Heri
SPEKTRUM INDUSTRI Vol 13, No 2: Oktober 2015
Publisher : Universitas Ahmad Dahlan Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (222.048 KB) | DOI: 10.12928/si.v13i2.2696

Abstract

Pencapaian kapasitas pabrik dan reduksi bottleneck proses produksi di stasiun kerja blanket basah dipengaruhi oleh tingkat kualitas hidup dan produktivitas pekerja yang harus diserasikan antara kemampuan dan keterbatasan pekerja, task, organisasi dan lingkungan kerja. Kualitas hidup pekerja diukur melalui; penurunan beban kerja, keluhan muskuloskeletal, kelelahan, kebosanan, peningkatan kenyamanan dan kepuasan pekerja. Sedangkan produktivitas kerja diukur melalui perpendekan waktu siklus proses produksi/keping dan peningkatan hasil produk/shift kerja. Optimasi kualitas hidup dan produktivitas pekerja dicapai dengan mendesain organisasi kerja berbasis ergonomi total yang meliputi pengaturan pola sistem kerja berpasangan, pemberian istirahat resmi, dan pemberian asupan nutrisi tambahan berupa teh manis dan snack pempek. Penelitian eksperimental dengan rancangan sama subjek (treatment by subject design), melibatkan 17 pekerja sampel pada kondisi stasiun kerja sebelum dan setelah desain organisasi kerja berbasis ergonomi. Hasil dan simpulan penelitian adalah penurunan beban kerja 16,06%, keluhan muskuluskeletal 21,02%, kelelahan 18,84%, kebosanan 22,32%, peningkatan kenyamanan 51,80%, perpendekan waktu siklus proses produksi/keping 21,85%, peningkatan hasil produk/shift kerja 20,29% dan kepuasan naik 31,42%. Kata kunci: Desain Organisasi Kerja, Stasiun Kerja Blanket, Ergonomi Total, Kualitas Hidup dan Produktivitas Pekerja
PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE MATERIAL REQUIREMENT PLANNING (MRP) PRODUK KACANG SHANGHAI PADA PERUSAHAAN GANGSAR NGUNUT-TULUNGAGUNG Wahyuni, Asvin; Syaichu, Achmad
SPEKTRUM INDUSTRI Vol 13, No 2: Oktober 2015
Publisher : Universitas Ahmad Dahlan Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (944.754 KB) | DOI: 10.12928/si.v13i2.2692

Abstract

Material Requirement Planning (MRP) adalah suatu metode yang digunakan untuk mengendalikan persediaan bahan baku pada perusahaan. Suatu perusahaan untuk menerapkan kebijakan-kebijakan dalam perencanaan bahan baku harus memiliki perhitungan yang tepat agar tidak terjadi kelebihan dan kekurangan dalam persediaan bahan baku. Penelitian ini mempunyai tujuan untuk mengetahui apakah penerapan metode Material Requirement Planning (MRP) pada perusahaan kacang shanghai “Gangsar” dalam merencanakan persediaan bahan baku dapat berjalan secara efektif dan efisien. Perencanaan kebutuhan material dengan menggunakan metode MRP dalam tulisan ini menggunakan metode lot sizing, dimana metode-metode lot sizing yang digunakan adalah Lot-for-lot, dan Economic order quantity, serta menggunakan rumus peramalan Exponential smoothing dan least squares sebagai acuan untuk mengetahui besarnya kebutuhan bahan baku dimasa mendatang. Pada Perusahaan Kacang Shanghai Gangsar, proses pengendalian persediaan bahan baku berdasarkan atas adanya pesanan dari konsumen. Dari perhitungan biaya bahan baku pada tahun 2012 total biaya persediaan bahan baku yang dikeluarkan oleh perusahaan adalah Rp 50.063.563.595,-. Sedangkan dengan menggunakan metode MRP total biaya yang dikeluarkan adalah Metode Lot-for-lot Rp 4.201.470.000 dan Metode Economic Order Quantity (EOQ) Rp 1.072.427.967. Dari kedua metode MRP di atas, dapat diketahui bahwa metode Economic Order Quantity (EOQ) memiliki total biaya persediaan paling rendah sebesar Rp 1.072.427.967,- artinya perusahaan dapat meminimalisasikan biaya persediaan sebesar 46,7 %. Sehingga dengan demikian terbukti bahwa salah satu metode MRP ini dapat berperan dalam mengefisiensi biaya persediaan bahan baku pada perusahaan. Kata kunci: Material Requirement Planning (MRP), Lot-Sizing, Peramalan
PENGUKURAN BEBAN KERJA TENAGA KERJA DENGAN METODE WORK SAMPLING (Studi Kasus di PT. XY Yogyakarta) -, Jono
SPEKTRUM INDUSTRI Vol 13, No 2: Oktober 2015
Publisher : Universitas Ahmad Dahlan Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (290.798 KB) | DOI: 10.12928/si.v13i2.2697

Abstract

PT XY sebagai salah satu perusahaan penghasil mebel memiliki kendala tenaga kerja sehingga diperlukan adanya penanganan khusus terhadap permasalahan tenaga kerja. Tenaga kerja di Assembling Departement khususnya stasiun meja makan terjadi kelebihan beban kerja sehingga tidak bisa memenuhi target produksi. Untuk memperbaiki beban kerja maka diusulkan bagaimana dilakukan pengukuran kerja dengan metode work sampling. Penelitian ini bertujuan menentukan waktu baku, produksi standar, beban kerja tenaga kerja dan jumlah tenaga kerja yang diperlukan. Work sampling adalah suatu teknik untuk mengadakan sejumlah besar pengamatan terhadap aktivitas kerja dari pekerja. Pengamatan aktivitas kerja untuk selang waktu yang diambil secara acak terhadap satu atau lebih pekerja dan kemudian mencatatnya apakah pekerja dalam keadaan bekerja atau menganggur. Pengukuran beban kerja tenaga kerja dengan metode work sampling untuk menghitung waktu baku, produksi standar, beban kerja dan jumlah tenaga kerja yang diperlukan. Dari hasil pengolahan data didapatkan waktu baku 298,92 menit, produksi standar yakni 7 per lima hari unit meja, beban kerja tenaga kerja sebesar 92,42% dan jumlah tenaga kerja yang diperlukan 6 orang. Kata kunci : Work Sampling, Beban Kerja, Tenaga Kerja.
LINE BALANCING DENGAN METODE RANKED POSITION WEIGHT ( RPW) purnamasari, Ita; Cahyana, Atikha Sidhi
SPEKTRUM INDUSTRI Vol 13, No 2: Oktober 2015
Publisher : Universitas Ahmad Dahlan Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1178.195 KB) | DOI: 10.12928/si.v13i2.2693

Abstract

Persaingan antar perusahaan tidak mencakup kawasan regional dan global, oleh karena itu setiap perusahaan berlomba untuk terus menerus mencari usaha dan cara untuk mampu bersaing dan memiliki keunggulan kompetitif agar tetap hidup dan berkembang. Inilah globalisasi dan akibatnya dalam persaingan. Persaingan ini harus di dukung oleh kelancaran proses produksi dalam perusahan itu sendiri. Ranked position weigth (RPW) merupakan proses mengidentifikasi kegagalan dalam suatu proses produksi dan menetukan bobot-bobot dari proses produksi. Penentuan dari beberapa komponen yaitu dengan menetukan waktu baku , waktu normal, dan waktu siklus. Setelah ketiga komponen tersebut di hitung dan di tentukan bobot-bobot dari masing-masing proses, maka dengan mengunakan metode rpw ini di dapatkan hasil yang semula dalam proses produksi membutuhkan 20 operator dan output 700 pairs per shift dengan jumlah 24 stasiun , setelah di hitung dengan rpw maka mendapatkan jumlah yang sangat berbeda dari proses sebelumya yaitu operator hanya membutuhkan 13 dan dengan menghasilkan output yang sama yaitu 700 pairs per shift. Kata kunci : Line balancing ,Rpw
PERBAIKAN METODE KERJA PENGANTONGAN SEMEN MENGGUNAKAN PETA TANGAN KIRI DAN KANAN Erliana, Cut Ita; Huda, Listiani Nurul; Matondang, A. Rahim
SPEKTRUM INDUSTRI Vol 13, No 2: Oktober 2015
Publisher : Universitas Ahmad Dahlan Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (304.036 KB) | DOI: 10.12928/si.v13i2.2698

Abstract

PT. X merupakan perusahaan yang bergerak dibidang jasa pengantongan semen dan produk yang dihasilkan adalah Semen Portland Pozzolan 50 kg. Masalah yang dihadapi perusahaan adalah kemampuan produksi semen yang lebih rendah dari permintaan semen. Analisis dilakukan terhadap komponen sistem kerja yaitu manusia, bahan baku, mesin, dan lingkungan kerja. Hasil analisis menunjukkan bahwa faktor manusia yaitu pada metode kerja yang berpengaruh terhadap kemampuan produksi semen. Tujuan dari penelitian ini adalah mendapatkan rancangan perbaikan metode kerja pada stasiun pengantongan semen agar waktu pengerjaan produk menjadi lebih singkat sehingga jumlah produksi semen meningkat. Rancangan perbaikan metode kerja dilakukan melalui Peta Tangan Kiri dan Tangan kanan agar sesuai Prinsip Ekonomi Gerakan. Penerapan Peta Tangan Kiri dan Kanan usulan pada stasiun pengantongan semen menghasilkan penurunan waktu siklus sebesar 3,2 detik atau 44% dan kenaikan jumlah produksi sebanyak 16,8 ton/operator. Kata kunci : Metode Kerja, Peta Tangan Kiri dan Kanan.

Page 1 of 2 | Total Record : 20