Putri Anggi Permata Suwandi
Universitas PGRI Semarang

Published : 14 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 14 Documents
Search

FACTORS AFFECTING DELAYS IN THE CONSTRUCTION PROJECT OF 5 FLOOR PARKING BUILDING ROEMANI HOSPITAL, SEMARANG. agra febyola lova nugraha; Busyro Lathif; Putri Anggi Permata Suwandi; Ibnu Toto Husodo
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 4, No 1 (2023)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In the planning of a project, there have to be a time schedule that can served as a guideline in the project, this shows that scheduling can influence the activity of a project. A good time schedule in a project can make project run effectively and efficiently, but in reality the actual work of a project did not always go as planned. In this case, the construction of library of UIN Sunan Ampel Surabaya.In the process of construction of library of UIN Sunan Ampel Surabaya, there is a delay that caused by a lot of factors, resulting in a delay of 49 days, the project initial duration is 154 days but the implementation duration is 203 days. Because of this, an analysis was carried out on this matter to determine what caused this lateness on project scheduleFrom the analysis that has been done the result is that the project lateness is caused in preparation work and the usage of work system with 3 shift but using the same man power. Factors of this lateness is caused by the owner, the conctractor, and weather disturbance.
Analysis Characteristics DGEM Mixture Using Mixed Filler Husk Ash Waste Rice And Lime off siti rissa meliana; alfi alfiatun nikmah; slamet budirahardjo budirahardjo; Putri Anggi Permata Suwandi
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 3, No 2 (2022)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Husk ash paddy generated from remainder burning bricks still _ _ have score low benefit , from _ Thing this conducted experiment mixing Among waste ash husk rice and lime off as replacement filler filler on mix asphalt emulsion CRS-1 type . Use mixture cold with asphalt emulsion no cause pollution as well as friendly environment . Destination in study this is analyze characteristics Dense Graded Emulsion Mix (DGEM) using mixed filler waste ash husk rice and lime off.Composition use of mixed fillers waste ash husk rice and lime off by 60% ash husk rice and 40% lime solid , 70% ash husk rice and 30% lime extinguished , and 80% ash husk rice and 20% lime extinguished , with a curing period of 3, 7 and 11 days with the curing method is carried out inside temperature room and immersion . Mixture waste ash husk rice and lime off best customized with percentage comparison that is testing stability highest with limit minimum specification 300 kg of mixed filler composition (60% ABS + 40% KP) with a curing period of 11 days . Keywords : Asphalt _ Emulsion , Waste , DGEM , Stability .
Analysis of the reliability value of building safety System (nkskb) and level of occupants readiness in facing Fire at johar market, semarang, central java (south johar) Berliana Esterida; Jaryati Jaryati; Putri Anggi Permata Suwandi; Mohammad Debby Rizani
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 3, No 1 (2022)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract. Public buildings are buildings used by people from various walks of life, which are built or intended not for the benefit of private residences, but for the general public which are identical to community service centers (Siti Azizah, 2013). One of the public buildings is the Johar market, Semarang. An important aspect of a public building is fire safety. The purpose of this study was to determine the level of reliability of the public building security system against fire hazards in the Johar Semarang market (Johar Selatan), and the readiness of the occupants of the Johar Semarang market building in the face of fire disasters. The method used in this research is descriptive-quantitative research method which is collecting data obtained from interviews, field notes, personal documentation, researcher notes, and other supporting documents. The results of the analysis of the utility component assessment of the four variables resulted in a Building Safety System Reliability Value (NKSKB) of 86.12%, based on these results it can be concluded that the reliability value of the building is in good and safe condition. The level of readiness of residents in facing the danger of fire disasters is still in the poor category with an average level of readiness of residents of 51.12%. This shows the need for increased application of protection systems and rescue facilities, especially for several protection systems that are still damaged and not functioning as well as socialization to residents regarding the use of fire extinguishers, fire simulations, and the need to provide adequate PPE.Keywords: Public Buildings, Level of Reliability, Occupancy Readiness
Analysis of Puri Pati Market Parking Land Needs syamsul Rohman; Putri Anggi Permata Suwandi; Farida Yudaningrum
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 4, No 2 (2023)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract. Puri Market, which is located on Jalan Colonel Sunandar, precisely in the center of Pati Regency, is a traditional market which is the basis for the people of Pati to sell and buy all life-sustaining needs. This needs to be taken into account considering that the existence of an activity center must have as few parking areas as possible. Therefore, this study was carried out with the aim of providing recommendations for parking characteristics, parking space capacity and planning the most optimal parking layout for Puri Pati Market. Conditions are reviewed on 1 weekend and 3 weekdays.From 06.00 to 12.00. With the current existing motorbike parking space capacity of 280 SRP at Puri Pati Market, it can still meet existing parking needs. From the calculations that have been carried out, it is known that the need for motorbike parking space at Puri Pati Market is 345 SRP. Keywords: Market, Parking Space Capacity, SRP.