cover
Contact Name
Agata Iwan Candra
Contact Email
iwan_candra@unik-kediri.ac.id
Phone
+62811308010
Journal Mail Official
ukarst@unik-kediri.ac.id
Editorial Address
Jl. Selomangleng no. 1
Location
Kota kediri,
Jawa timur
INDONESIA
U Karst
Published by Universitas Kadiri
ISSN : 25794620     EISSN : 25810855     DOI : http://dx.doi.org/10.30737/ukarst
Core Subject : Engineering,
U KaRsT is a journal of the civil engineering research the University of Kadiri published twice a year in April and November. First published in April 2017. U KaRsT already has both ISSN printed and online, for ISSN (Print) is 2579-4620, and ISSN (Online) is 2581-0855.
Arjuna Subject : -
Articles 9 Documents
Search results for , issue "Vol. 2 No. 1 (2018): APRIL" : 9 Documents clear
PELAKSANAAN MANAJEMEN KONSTRUKSI PADA PROYEK PEMBANGUNAN BANK SINAR MAS KEDIRI Yosef Cahyo Setianto Poernomo; Ahmad Ridwan; Zulkifli Lubis; April Gunarto; Sigit Winarto
U Karst Vol. 2 No. 1 (2018): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v2i1.101

Abstract

 Bank Sinar Mas Kediri project is a development project that uses a unique implementation method, namely the Top Down method, that is, the construction starts from the floor plate as a new foundation and then continues with the construction of the ground floor 1,2,3. The use of the Top Down method requires a column called King Post which is a column of steel profiles as a temporary column. The hotel is built on a land area of 3248 m2 with a building height of + 123,600 m, - 9,800 m and uses 118 boredpile foundations. This project uses the Fixed Price Lumpsum contract system. This research aims to identify the cause of the delay in the completion of the Sinar Mas Kediri development project. The results of the analysis show that the delay in the completion of the project is due to the delay in completion of the excavation work. The delay was due to the lack of procurement of water pumping or drying equipment, weather or climate and the lack of excavation and limited number of heavy equipment used. Keywords: Delays, Time, Construction.  Proyek Bank Sinar Mas Kediri merupakan proyek pembangunan yang menggunakan metode pelaksanaan yang unik yaitu metode Top Down yaitu pembangunan dimulai dari pelat lantai sebagai tumpuan baru kemudian dilanjutkan dengan pembangunan lantai dasar 1,2,3. Penggunaan metode Top Down memerlukan kolom yang disebut King Post yang merupakan kolom dari profil baja sebagai kolom sementara. Hotel tersebut dibangun di atas tanah seluas 3248 m2 dengan tinggi bangunan + 123,600 m, - 9,800 m dan menggunakan 118 pondasi boredpile. Proyek ini menggunkan sistem kontrak Lumpsum Fixed Price.Penelitian ini bertujuan untuk mengidentifikasi penyebab keterlambatan penyelesaian proyek pembangunan Bank Sinar Mas Kediri. Hasil analisis menunjukkan bahwa Keterlambatan penyelesaian proyek disebabkan keterlambatan penyelesaian pekerjaan penggalian tanah. Keterlambatan tersebut dikarenakan kurangnya pengadaan akan alat pemompa air atau alat pengeringan, cuaca atau iklim dan tidak adanya jumlah tenaga kerja penggalian dan terbatasnya jumlah alat berat yang digunakan. Kata Kunci : Keterlambatan, Waktu, Konstruksi Kata Kunci : keterlambatan, waktu, konstruksi.
PENGGUNAAN LIMBAH POLIETILEN DENSITAS TINGGI SEBAGAI PENGUBAH BITUMEN DALAM CAMPURAN BETON ASPAL Heru Prasetyo; Sugeng Dwi Hartantyo; Herlan Pratikto; Heri Wahyudiono
U Karst Vol. 2 No. 1 (2018): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v2i1.102

Abstract

The purpose of this study is to investigate the possibility of using various plastic wastes containing High Density Polyethylene as an additive polymer for asphalt concrete. It was investigated that the effect of HDPE modified binders was obtained by various mixing times, mixing temperatures and HDPE content on Marshall Stability, flow, and Marshall Quotient. The binder used in Hot Asphalt Mixing (HMA) was prepared by mixing HDPE in 4-6% and 8% (based on optimal asphalt content weight) and AC-20 at temperatures of 145-155 and 165 jC and 5-15 and 30 minutes of mixing time . Asphalt concrete modified by HDPE is quite large in increasing Marshall Stability and Marshall Quotient values (resistance to deformation). Four percent HDPE, 165jC of mixing temperature and 30 minutes of mixing time were determined as optimum conditions for Marshall Stability, flow and Marshall Quotient (MQ). MQ increased by 50% compared to the control mixture. It can be said that modified HDPE bitumen binder waste provides better resistance to permanent deformation due to high stability and high Marshall Quotient and contributes to recirculation of plastic waste as well as to environmental protection. D 2003 Elsevier BV All rights reserved. Keywords: Asphalt Concrete, Waste Material, Modified Bitumen, Marshall Stability Tujuan dari penelitian ini adalah untuk menyelidiki kemungkinan penggunaan berbagai limbah plastik yang mengandung High Density Polyethylene sebagai polimer aditif untuk beton aspal. Itu diselidiki bahwa pengaruh pengikat dimodifikasi HDPE diperoleh dengan berbagai waktu pencampuran, pencampuran suhu dan konten HDPE pada Stabilitas, aliran, dan Marshall Quotient (Rasio Stabilitas terhadap Aliran) Marshall. Pengikat yang digunakan dalam Hot Mix Aspal (HMA) disiapkan dengan mencampurkan HDPE dalam 4–6% dan 8% (berdasarkan berat konten aspal optimal) dan AC-20 pada suhu 145-155 dan 165 jC dan 5–15 dan 30 menit waktu pencampuran. Beton aspal hasil modifikasi HDPE cukup besar peningkatan nilai Stabilitas (kekuatan) Marshall dan nilai Marshall Quotient (resistensi terhadap deformasi). HDPE empat persen, 165jC dari suhu pencampuran dan 30 menit waktu pencampuran ditentukan sebagai kondisi optimum untuk Stabilitas Marshall, aliran dan Marshall Quotient(MQ). MQ meningkat 50% dibandingkan dengan campuran kontrol. Dapat dikatakan bahwa limbah pengikat bitumen HDPE yang dimodifikasi memberikan ketahanan yang lebih baik terhadap deformasi permanen karena stabilitas tinggi dan Marshall Quotient yang tinggi dan berkontribusi terhadap resirkulasi limbah plastik sebagai juga untuk perlindungan lingkungan. D 2003 Elsevier BV Semua hak dilindungi undang-undang. Kata Kunci: Beton Aspal, Bahan Limbah, Bitumen Yang Dimodifikasi, Stabilitas Marshall
KONSEP PENGEMBANGAN KOTA BARU DI SUKODONO SIDOARJO Meuthia Geumala; Rimadewi Supriharjo; Putu Gede Ariastita; Mahrus Ali
U Karst Vol. 2 No. 1 (2018): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v2i1.103

Abstract

Sukodono as one of the districts in Sidoarjo has potential as a new city in terms of land availability, and has accessibility to develop related to infrastructure availability. To achieve the research objectives, three phases of analysis were carried out, namely the identification of factors influencing the development of a new city in Sukodono with descriptive analysis and the Delphi method, assessing the performance of these factors with a Likert scale service quality, and the formulation of a new city development concept using triangulation analysis. Based on this research, a new regency city in Sukodono is currently included in a new satellite city. This is because the new city in Sukodono is a planned and developed city, but the population still has a relationship with the cities of Surabaya and Sidoarjo in terms of work and daily living needs. Then a new city development concept is needed to develop and improve urban infrastructure, city service facilities and enable business activities.Sukodono sebagai salah satu kabupaten di Sidoarjo memiliki potensi sebagai kota baru dilihat dari ketersediaan lahan, dan memiliki aksesibilitas untuk berkembang terkait dengan ketersediaan infrastruktur. Untuk mencapai tujuan penelitian dilakukan tiga fase analisis yaitu identifikasi faktor-faktor yang mempengaruhi perkembangan kota baru di Sukodono dengan analisis deskriptif dan metode Delphi, menilai kinerja faktor-faktor tersebut dengan kualitas layanan skala likert, dan perumusan konsep pengembangan kota baru dengan menggunakan analisis triangulasi. Berdasarkan penelitian ini, sebuah kota kabupaten baru di Sukodono saat ini termasuk dalam kota satelit baru. Ini karena kota baru di Sukodono adalah kota yang direncanakan dan dikembangkan, tetapi penduduk masih memiliki hubungan keterkaitan dengan kota Surabaya dan Sidoarjo dalam hal pekerjaan dan kebutuhan hidup sehari-hari. Maka dibutuhkan konsep pengembangan kota baru untuk mengembangkan dan meningkatkan infrastruktur perkotaan, fasilitas layanan kota dan memungkinkan kegiatan bisnis.
PERAN PIHAK PROYEKTIF PADA PENGENDALIAN KUALITAS (STRUKTUR BETON) DAN PENCAPAIAN KINERJA PROYEK Edy Gardjito
U Karst Vol. 2 No. 1 (2018): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v2i1.140

Abstract

For the data processing process the researcher use help the method ofStepwise Regression Test and Hypothesis Test.The result of this research is very positive influence of concrete quality control factors and the role of project related party influence to the achievement of construction project performance, that is proved by stepwise regression test and hypothesis test where Quality performance (Fi = 21,758> Ft = 2,060), Time performance (Fi = 14,950> Ft = 4,496), Cost performance (Fi = 15,379> Ft = 4,496).For Quality performance is shown: coefficient of determination or R square = 0,876, influencing variable is implementation aspect (x1), and aspects of human resources (x2), with Y1 = 0,285 + 0,148.x1 + 0,071.x2. Related to Time performance: coefficient of determination or R square = 0.537, the variable that influences is monitoring times chedule (x1), with Y2 = 2,166 + 0,415.x1. Related to Cost performance: coefficient of determination or R square = 0.481, the influencing variable is the acceleration of implementation (x1), with Y3 = -0.741 + 0.958.x1. So If the project organizers feel that these variables have been ful filled,then the performance of the resulting construction project will be better too. Keywords: Concrete Quality Control, Quality Performance, Time Performance, Cost Performance, Construction Project Performance. Untuk proses pengolahan data peneliti menggunakan bantuan metode Uji Regresi Bertahap dan Uji Hipotesis. Hasil penelitian ini sangat berpengaruh positif terhadap faktor kontrol kualitas beton dan peran pihak terkait proyek terhadap pencapaian kinerja proyek konstruksi, yaitu dibuktikan dengan uji regresi bertahap dan uji hipotesis di mana Kinerja kualitas (Fi = 21.758> Ft = 2.060), Kinerja waktu (Fi = 14.950> Ft = 4.496), Kinerja biaya (Fi = 15.379> Ft = 4.496) .Untuk kinerja yang berkualitas ditampilkan : koefisien determinasi atau R square = 0,876, variabel yang berpengaruh adalah aspek implementasi (x1), dan aspek sumber daya manusia (x2), dengan Y1 = 0,285 + 0,148.x1 + 0,071.x2. Terkait dengan kinerja waktu: koefisien determinasi atau R square = 0,537, variabel yang mempengaruhi adalah waktu pemantauan chedule (x1), dengan Y2 = 2,166 + 0,415.x1. Terkait dengan kinerja Biaya: koefisien determinasi atau R square = 0,481, variabel yang mempengaruhi adalah percepatan implementasi (x1), dengan Y3 = -0,741 + 0,958.x1. Jadi, jika penyelenggara proyek merasa bahwa variabel-variabel ini telah dipenuhi, maka kinerja proyek konstruksi yang dihasilkan akan lebih baik juga. Kata Kunci: Kontrol Kualitas Beton, Kinerja Kualitas, Kinerja Waktu, Kinerja Biaya, Kinerja Proyek Konstruksi.
ALTERNATIF PENGGUNAAN SERAT ECENG GONDOK UNTUK MENINGKATKAN INDEX PROPERTIES OF MARSHALL PADA CAMPURAN LASTON TIPE I SNI 03-1737-1989 Dwi Kartikasari; Samsul Arif
U Karst Vol. 2 No. 1 (2018): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v2i1.260

Abstract

However, flexible pavement has many disadvantages, such as early damage to the road surface after some time has passed by traffic so the road cannot reach the planned age. For this reason, a research was carried out to add hot asphalt mixture which aims to improve the quality of the mixture, the selected material is natural water hyacinth. The method used is trial and error with reference SNI 03-1737-1989. Variations used were 3%, 5%, and 7% of asphalt weight, the level of asphalt used was 4.48%. Of the 3 variations of the mixture used in Type I Asphalt Concrete Layer, the results obtained that the water hyacinth fiber content that has the best score and meet the specifications of SNI 03-1737- 1989 is the percentage of 7% obtained. from the calculation data using graphs and regression models where Marshall Stability is 889.73 Kg, VFWA (voids filled with asphalt) are equal to 65.97%, VIM (voids in mixtures) are equal to 1.757%, VMA (voids in mineral aggregates ) is equal to 20.30%, density 2.420 gr / cc, Flow 3.37 mm, and Marshall Quotient of 265.80 Kg / mm. Keywords : Flexible Pavement, Water Hyacinth Fiber, Marshall Test. Namun, perkerasan lentur memiliki banyak kelemahan, seperti kerusakan awal pada permukaan jalan setelah beberapa waktu berlalu lalang sehingga jalan tidak dapat mencapai usia yang direncanakan. Untuk alasan ini, penelitian dilakukan untuk menambahkan campuran aspal panas yang bertujuan untuk meningkatkan kualitas campuran, bahan yang dipilih adalah eceng gondok air alami. Metode yang digunakan adalah coba-coba dengan referensi SNI 03-1737-1989. Variasi yang digunakan adalah 3%, 5%, dan 7% dari berat aspal, tingkat aspal yang digunakan adalah 4,48%. Dari 3 variasi campuran yang digunakan pada Tipe I Asphalt Concrete Layer, diperoleh hasil bahwa kandungan serat eceng gondok yang memiliki skor terbaik dan memenuhi spesifikasi SNI 03-1737-1989 adalah persentase 7% yang diperoleh. dari data perhitungan menggunakan grafik dan model regresi di mana Marshall Stability adalah 889,73 Kg, VFWA (rongga diisi dengan aspal) sama dengan 65,97%, VIM (rongga dalam campuran) sama dengan 1,757%, VMA (rongga dalam agregat mineral) sama dengan hingga 20,30%, kepadatan 2,420 gr / cc, Aliran 3,37 mm, dan Marshall Quotient dari 265,80 Kg / mm. Kata Kunci: Perkerasan Lentur, Serat Eceng Gondok, Uji Marshall.
PENGARUH PENAMBAHAN SERAT ALAMI ECENG GONDOK TERHADAP KUAT TEKAN BETON BERKUALITAS RENDAH Nur Affandy; Zulkifli Lubis
U Karst Vol. 2 No. 1 (2018): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v2i1.262

Abstract

This research will be conducted in accordance with Indonesian Standard SK SNI and foreign standard ASTM. The test object consists of a cylindrical test with the diameter of 15 cm and a height of 30 cm, and it is developed to 4 mixture variations with the amount of 2%, 4%, 6%, 8%, of total cement. The mechanical properties of concrete is being tested include concrete compressive strength. Itis tested at the age of 7 days, and then converted at 28 days, using test objects mixed with different fiber variations. The results of the test are: compressive strength test with 2% variation is 7,54MPa, compressive strength testwith 4% variation is 6,74 Mpa, compressive strength with 6% variation is 4,58 Mpa, compressive strength with 8% variation is 3.63 MPa. Maximum concrete compressive strength occurs in 2% fiber mixture, while the minimum concrete compressive strength occurs in 8%. From these results, it can be concluded that the addition of water hyacinth fiber to the mixture for low quality concrete has not been able to increase its compressive strength. Keywords:  Fiber, Water Hyacinth, Concrete Compressive Strength.  Penelitian ini akan dilakukan sesuai dengan Standar SK Indonesia SNI dan standar asing ASTM. Benda uji terdiri dari uji silindris dengan diameter 15 cm dan tinggi 30 cm, dan dikembangkan menjadi 4 variasi campuran dengan jumlah total semen 2%, 4%, 6%, 8%. Sifat mekanik beton sedang diuji termasuk kekuatan tekan beton. Itu diuji pada usia 7 hari, dan kemudian dikonversi pada 28 hari, menggunakan benda uji dicampur dengan variasi serat yang berbeda. Hasil pengujian adalah: uji kuat tekan dengan variasi 2% adalah 7,54MPa, uji kuat tekan dengan variasi 4% adalah 6,74 Mpa, kuat tekan dengan variasi 6% 4,58 Mpa, kuat tekan dengan variasi 8% adalah 3,63 MPa. Kekuatan tekan beton maksimum terjadi pada campuran serat 2%, sedangkan kekuatan tekan beton minimum terjadi pada 8%. Dari hasil ini, dapat disimpulkan bahwa penambahan serat eceng gondok ke dalam campuran beton berkualitas rendah belum mampu meningkatkan kekuatan tekannya. Kata Kunci: Serat, Eceng Gondok, Kekuatan Tekan Beton.
PERENCANAAN PONDASI BORE PILE PADA PROYEK JEMBATAN NGUJANG II KAB.TULUNGAGUNG Heri Wahyudiono; Sulik Anam
U Karst Vol. 2 No. 1 (2018): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v2i1.356

Abstract

The method used in analyzing the foundation of this research is the Mayerhof method and the RSNI-T-02-2015 based  approach  to standard  loading  for bridges,  thus obtaining  a  total vertical load of 770,121 tons, using a bore foundation 80 cm in diameter with the mayerhof method number of poles 15 with a  distance  of 2 meters, so the bearing  capacity  of the foundation pile group: Qug 852,1889 tons> from the load carried (Pu) 770,121 tons (okay), one-way control conditions φVc shear force, 6754,405> Vu, shear strength concrete, 369,490 (okay), two-way control conditions, cVc shear force, 9885.9 tons> Vc concrete shear strength 5088,825 tons (okay), reinforcement bore pile foundation. Vc. Shear force 48,593 <Φ  * Vc concrete shear resistance 60,625 (okay) the number of  staple reinforcement needed 21 d19 and  stirrup  reinforcement  d13,  according  to  the  calculation,  15  bore  piles  are  able  to withstand the burdens of the upper bridge structure. Keywords: bore pile foundation of the mayerhof method  Metode yang di pergunakan  dalam  melakukan analisa  pada  pondasi  pada  penelitian  ini adalah  metode Mayerhof dan  pendekatan  berdasarkan   RSNI-T-02-2015 tentang  standar pembebanan untuk jembatan ,maka didapat total beban vertikal 770,121 ton, menggunakan pondasi bore diameter 80 cm dengan metode mayerhof jumlah tiang 15 dengan jarak 2 meter, jadi daya dukung tanah pondasi tiang kelompok: Qug 852,1889 ton > dari beban yang di pikul (Pu )770,121 ton(oke),control satu arah  syarat  φVc gaya geser, 6754,405 >  Vu,kuat geser beton,369,490 (oke),kontrol dua arah  syarat  ,φVc gaya geser, 9885,9 ton >  Vc kuat geser beton 5088,825 ton (oke), tulangan pondasi bore pile. Vc.,gaya geser 48,593 < Φ*Vc tahanan  geser  beton  60,625  (oke) jumlah  tulangan  pokok yang  dibutuhkan  21  d19  dan tulangan sengkang d13, sesuai perhitungan dengan 15 bore pile mampu menahan beban – beban struktur atas jembatan. Kata Kunci: pondasi bore pile metode mayerhof
PENELITIAN PENGGUNAAN BATU GAMPING SEBAGAI AGREGAT KASAR DAN FILLER PADA ASPAL CAMPURAN AC-BC Moch Zaenuri; Romadhon Romadhon; April Gunarto
U Karst Vol. 2 No. 1 (2018): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v2i1.357

Abstract

Road damage has become a common problem commonly faced, in almost every area has a damaged road. Some of the causes of road damage in some areas are: poor road quality, inadequate drainage conditions. Therefore, it needs serious handling in reacting it, until finally this research was born to become an alternative in handling damaged roads that are in accordance  with the requirements of the clan community. The research  method used is an experimental method in the laboratory.  The performance of asphalt mixture is determined based on the carrying capacity of the mixture based on stability and volumetric parameters with the Marshall method (SNI 06-2489-1991) with 3 samples of asphalt content 5%, 5.5%, 6%, 6.5%, 7%. The use of limestone as a hot mix material for almost all Bina Marga  requirements  is fulfilled. With the results  of the average  calculation  of 3 samples, namely: VMA 18.06%, VIM 5.98, VFB 66.32%, Stability 1059 kg, Flow 2.86 mm, MQ 367 kg / mm. KAO results obtained at 6.5%. Keywords: Limestone, Volumetric, Marshall Test  Kerusakan jalan telah menjadi masalah umum yang biasa dihadapi, di hampir setiap daerah memiliki jalan rusak. Beberapa penyebab kerusakan jalan di beberapa daerah adalah: kualitas jalan yang buruk, kondisi drainase yang tidak memadai. Oleh karena itu, perlu penanganan serius dalam menyikapinya, hingga akhirnya penelitian ini lahir untuk menjadi alternatif dalam penanganan jalan rusak yang sesuai dengan kebutuhan masyarakat klan. Metode penelitian yang digunakan adalah metode eksperimen di laboratorium. Kinerja campuran aspal ditentukan berdasarkan daya dukung campuran berdasarkan parameter stabilitas dan volumetrik dengan metode Marshall (SNI 06-2489-1991) dengan 3 sampel kadar aspal 5%, 5,5%, 6%, 6,5% , 7%. Penggunaan batu kapur sebagai bahan campuran panas untuk hampir semua persyaratan Bina Marga terpenuhi. Dengan hasil perhitungan rata-rata 3 sampel, yaitu: VMA 18,06%, VIM 5,98, VFB 66,32%, Stabilitas 1059 kg, Aliran 2,86 mm, MQ 367 kg / mm. Hasil KAO diperoleh pada 6,5%. Kata Kunci: Batu Kapur, Volumetrik, Tes Marshall
PENGARUH PENAMBAHAN BATU KARANG SEBAGAI SUBSTITUSI AGREGAT HALUS DALAMPEMBUATAN PAVING BLOCK Edy Gardjito; Agata Iwan Candra; Yosef Cahyo
U Karst Vol. 2 No. 1 (2018): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v2i1.374

Abstract

                                                             Material exploitation, especially the use of sand as the main component of concrete, needs  to  be  reduced. The  purpose  of  this  research  is to find  out  the  value of  compressive strength   from   the addition of rocks to achieve compressive strength according to the standard mix  design  of  paving  blocks. This  research  was  conducted  at  the University's Civil Engineering Laboratory. Attending a trial and error method, the samples tested were cube with a size of 15 x 15 x 15 cm with 3 pieces with the quality of paving planned and K-225 or 18.675  MPa. The  method  of  making specimens  includes  semi-mechanics  using  a concrete mixer. Fractional waste The rock is crushed into small pieces and then put in messin abrassion to get smaller pieces of rock and become grains of sand. Test result obtained a percentage of 25% indicating a compressive strength of 22.1 MPa, 20.3 MPa, 19.9MPa, and has an average value   of 21.8   MPa. Then   the   results from the   substitution experience i increase   against compressive strength. Keywords: Coral, Fine Aggregate, Compressive Strength.  Eksploitasi material, terutama penggunaan pasir sebagai komponen utama beton, perlu dikurangi. Tujuan dari penelitian ini adalah untuk mengetahui nilai kekuatan tekan dari penambahan batuan untuk mencapai kekuatan tekan sesuai dengan desain campuran standar balok paving. Penelitian ini dilakukan di Laboratorium Teknik Sipil Universitas. Menghadiri metode coba-coba, sampel yang diuji adalah kubus dengan ukuran 15 x 15 x 15 cm dengan 3 buah dengan kualitas paving yang direncanakan dan K-225 atau 18,675 MPa. Metode pembuatan spesimen termasuk semi-mekanika menggunakan mixer beton. Limbah pecahan Batuan dihancurkan menjadi potongan-potongan kecil dan kemudian dimasukkan ke dalam abrasi untuk mendapatkan potongan batu yang lebih kecil dan menjadi butiran pasir. Hasil pengujian diperoleh persentase 25% yang menunjukkan kekuatan tekan 22,1 MPa, 20,3 MPa, 19,9MPa, dan memiliki nilai rata-rata 21,8 MPa. Kemudian hasil dari pengalaman substitusi saya meningkat terhadap kekuatan tekan Kata Kunci

Page 1 of 1 | Total Record : 9