USULAN WAKTU PERAWATAN DAN PERBAIKAN BERDASARKAN KEANDALAN PADA BAGIAN BOILER DI PEMBANGKIT LISTRIK TENAGA UAP Pamungkas, Iing; Irawan, Heri Tri; Arhami, Arhami; Dirhamsyah, Muhammad
Jurnal Optimalisasi Vol 5, No 2 (2019): Oktober
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jopt.v5i2.1255

Abstract

PT. PLN (Persero) is the sole manager of the electricity industry in Indonesia which is owned by the Indonesian government in the form of a State-Owned Enterprise. Steam power plant is one of the leading power plants in Indonesia. Aceh Province has one steam power plant located in Nagan Raya Regency and has two generating units with an installed capacity of 2x110 Megawatts. However, a power outage is unavoidable and still often occurs if one of the plants is damaged or damaged. Corrective maintenance activities and overall maintenance is one of the causes of the high frequency of interference or damage, especially in the boiler section. This study aims to determine the proposed maintenance and repair time to achieve a reliability level of up to 80% in every important boiler component. The proposed maintenance and repair time can be obtained based on historical time to failure and time to repair data. Good maintenance and repair time can be assessed based on high reliability values. The results obtained that the proposed maintenance time is 67 hours to 585 hours to achieve 80% reliability value on eight important components in the boiler section. While the proposed repair time is from 1,036 hours to 1,497 hours to reach 80% reliability value on eight important components in the boiler section.
PENENTUAN TINGKAT RISIKO PADA PROSES PRODUKSI GARAM TRADISIONAL DI DESA IE LEUBEU KABUPATEN PIDIE Pamungkas, Iing; Irawan, Heri Tri; Arkanullah, Lian; Dirhamsyah, Muhammad; Iqbal, Mohd
Jurnal Optimalisasi Vol 5, No 2 (2019): Oktober
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jopt.v5i2.1307

Abstract

The community's conventional salt production business is one of the economic drivers of the community. In addition to being able to provide a lot of jobs for people in Indonesia's coastal areas, the people's salt production business is also seen as a way to reduce poverty. Pidie Regency, which is included in the Province of Aceh, is one area that has a wide coastline and can be utilized as a salt farmer business. Pidie is an area that has a salt production business with a total production of 449.05 tons/month. The problem faced in the traditional salt processing business in Pidie District is the unknown level of risk that exists in each salt production process. The purpose of this study is to determine the level of risk in the traditional salt production process using failure mode and effect analysis (FMEA) and probability impact matrix (PIM) in the Saho Adab people's salt business group in Keude Ie Leubeu Village, Kembang Tanjong District, Pidie District. FMEA is a form of qualitative analysis that assesses the severity , occurrence and detection on each activity and then given a value on a predetermined scale. Whereas risk assessment using PIM only assesses the severity and occurrence. Based on the analysis of failure and effect modes, the salt production process has a high level of risk, namely the packaging process with an RPN value (risk priority number) 75, the salt water storage process with an RPN value of 48, the drying process with an RPN value of 45 and the level of the soil process with an RPN 45. While the results of the matrix impact probability obtained by the salt production process that has a high level of risk, namely the process of storing salt with a value of 5, the packaging process with a value of 4, the process of leveling sand with a value of 3,5 and the process of salt water filtration with sand filtration media containing NaCl with a value of 3,5.
PENERAPAN MODEL ANTRIAN PADA APOTEK PUSKESMAS INGIN JAYA KABUPATEN ACEH BESAR Irawan, Heri Tri; Pamungkas, Iing; Muzakir, Muzakir
Jurnal Optimalisasi Vol 4, No 1 (2018): April
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jopt.v4i1.1476

Abstract

The pharmacy is a place for the taking of drugs available at the Puskesmas Ingin Jaya, where in the process of taking drugs often there is a queue at certain times. This study aims to improve services so as to minimize the average waiting time for taking drugs while waiting in the queue and the service queue system so that the queue does not occur too long. The analytical method used is queuing theory analysis in accordance with the single phase single channel model or M / M / 1 which is applied to the pharmacy Puskesmas Ingin Jaya. The results of research on the process of taking drugs at the pharmacy Puskesmas Ingin Jaya by using queuing theory analysis, namely by calculating the queue model of one service line shows that in the non-rush hour condition, the number of facility lines used by one facility line is good, but not at the hour condition busy at 09.00-10.00, which shows that the longest patient waiting in the queue is 11 people, while the shortest queue is at 11.00-12.00, 9 people. The suggestion in this study is to add one service facility during the peak hour period, namely to become two facilities so that it is expected to optimize the performance of the service in the process of taking drugs.
IMPLEMENTASI STATISTICAL PROCESS CONTROL UNTUK PENGENDALIAN KUALITAS GARAM TRADISIONAL DI KABUPATEN PIDIE Pamungkas, Iing; Irawan, Heri Tri; Arkanullah, Lian
Jurnal Optimalisasi Vol 4, No 2 (2018): Oktober
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jopt.v4i2.1525

Abstract

Pidie is one of the districts that has a large coastline and is widely used for traditional salt production. Pidie Regency has a salt production business with total production reaching 449.05 tons / month, and production area has reached 28.74 hectares with 451 salt farmers. The problem faced in the traditional salt production business in Pidie District is that there is no integrated quality control in the results of traditional salt production. The purpose of this study is to apply statistical process control methods to control the quality of traditional salt in the salt business group of the Saho Adab community in Keude Ie Leubeu Village, Kembang Tanjong District, Pidie Regency. Statistical process control is a statistical analysis technique used to ensure that processes meet standards. Statistical process control techniques in this study will use three quality control tools, namely pareto diagrams, control charts, and cause effect diagrams. After controlling the quality of salt in the Saho Adab Pidie District using statistical process control techniques as seen from the control map, no salt sample data were found that went out of control limits. Whether it's for NaCl levels or salt particle size. Factors affecting the quality of salt production such as human, machine, material, method and environment factors.
Strategi Pengurangan Risiko Kerusakan Pada Komponen Kritis Boiler di Industri Pembangkit Listrik Pamungkas, Iing; Irawan, Heri Tri
Jurnal Optimalisasi Vol 6, No 1 (2020): April
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jopt.v6i1.2197

Abstract

This paper uses the failure mode approach and effect analysis (FMEA) in formulating a risk reduction strategy for damage to critical components of the boiler section of the Nagan Raya steam power plant. Boilers are an important part of the production system of steam power plants. The problem in the boiler section is the relatively high damage frequency compared to other parts. The aim of this study is to propose a risk reduction strategy for critical boiler components using a failure mode approach and effect analysis (FMEA). The proposed damage risk reduction will prioritize important components that have the highest risk priority number (RPN). The strategy that was successfully formulated was for the cyclone separator component, to carry out periodic and scheduled preventive checks and maintenance, especially on the return leg to prevent the accumulation of solid particles in the fluid system. Primary air fans and induced draft fan components, they must perform standard operational procedures (SOP) when operating the fan so that they do not experience high vibrations, and routinely balance the rotor contained in the fan. As for the coal feeder components, monitor the coal flow in detail so that it does not accumulate at one particular point, which can cause leakage at the outlet flanges.
Penjadwalan Produksi Paving Block Pada CV. Nibo Corporation Banda Aceh Irawan, Heri Tri; Pamungkas, Iing; Arhami, Arhami
Jurnal Optimalisasi Vol 6, No 1 (2020): April
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jopt.v6i1.2063

Abstract

This paper uses the Palmer method to schedule paving block production in CV. Nibo Corporation Banda Aceh. CV. Nibo Corporation is engaged in the production of paving blocks located in the city of Banda Aceh. Problems faced by CV. Nibo Corporation often produces excess paving blocks than the number of orders that results in product accumulation in the storage area. The purpose of this study is to schedule paving block production in CV. Nibo Corporation. Paving block production scheduling in CV. Nibo Corporation will use the Palmer method. This research begins by calculating each standard time for each job. From the scheduling results, the comparison between the initial factory work schedule is nine hours of work in one day, and twenty-four working days in a month. While scheduling using the palmer method is six hours of work in one day and twenty-four working days in a month, or nine hours of work in one work day and seventeen days in a month. Using the palmer method can reduce the difference in production and orders every month from 31.000 to 5.944, or 3.000 per month, thereby reducing the accumulation of paving block products.
Studi Kelayakan Investasi Perkebunan Kelapa Sawit PT. Agro Sinergi Nusantara (ASN) Kabupaten Aceh Selatan Irawan, Heri Tri; Pamungkas, Iing
Jurnal Optimalisasi Vol 6, No 1 (2020): April
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jopt.v6i1.1830

Abstract

The oil palm plantation business is one of the businesses that are considered prospective at present. Investment to develop oil palm plantations requires large funds with a long payback period. The financial strength of investors is needed given that in the early days of plantation operations, plantation productivity was still relatively low. PT. Agro Sinergi Nusantara (ASN) is one of the national private companies engaged in the oil palm plantation sector, and plans to develop oil palm plantations covering an area of 14.000 hectares. This study aims to determine the feasibility of the business based on the financial aspects of the investment plan of PT. Agro Sinergi Nusantara (ASN) in opening an oil palm plantation in South Aceh Regency. This study uses financial feasibility analysis methods, namely net present value (NPV), internal rate of return (IRR) and payback period (PP). The final result in this study is that this investment is feasible based on net present value > 0, internal rate of return = 21,4% and payback period = 3 years.
Perencanaan Ulang Tata Letak Fasilitas Produksi (Studi Kasus: UKM Pengolahan Ikan Asin Stefen Aluy-Meulaboh) Hadi, Khairul; Hasanuddin, Iskandar; Husni, Husni; Pamungkas, Iing; Fitriadi, Fitriadi; Irawan, Heri Tri
Jurnal Optimalisasi Vol 6, No 2 (2020): Oktober
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jopt.v6i2.2569

Abstract

This study used a rectilinear method in redesigning the layout of the salted fish production facility to minimize the mileage of Stefen Aluy's UKM. Stefen Aluy UKM is one of the salted fish businesses that is developing in West Aceh and its products are evenly distributed in West Aceh and its surroundings. The large production area makes it easier for UKM Stefen Aluy to maximize salted fish production. However, the large production area owned by UKM Stefen Aluy can result in long distances so that it is ineffective and efficient. The risk of worker fatigue and injury can occur due to the long distance. In addition, there is a risk of raw materials falling while moving. To minimize this potential, it is necessary to evaluate the layout of the salted fish production facilities at UKM Stefen Aluy, namely by improving the layout of the facilities. The rectilinear method can be used to minimize mileage in making layout improvements. From the results of the layout mapping based on the measurement of the rectilinear distance, the initial layout has a rectilinear distance of 6.932 cm, while the layout of the design results obtained a rectilinear distance of 3.409 cm. The result of the layout redesign resulted in a distance reduction of 49.04% from the previous distance.
Peningkatan Kapasitas Teknologi Berbasis Android untuk Mitra Send Meulaboh Syahril, Syahril; Saputra, Arie; Fitriadi, Fitriadi; Pamungkas, Iing
Jurnal Pengabdian Masyarakat: Darma Bakti Teuku Umar Vol 2, No 2 (2020): Juli-Desember
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/baktiku.v2i2.2466

Abstract

Keterbukaan terhadap akses ke teknologi sering menjadi kendala bagi pengusaha lokal untuk terus maju dan berkembang. Pengusaha lokal yang merasakan kendala ini adalah mitra layanan pengiriman makanan online di kota Meulaboh yang bernama Send. Permasalahan yang dihadapi oleh Send yaitu keterbatasan teknologi aplikasi layanan serta keterbatasan akses konsumen dan mitra usaha. Tujuan dilakukannya program pengabdian berbasis riset ini adalah memecahkan masalah mitra Send dengan menciptakan atau merancang sebuah teknologi aplikasi berbasis android yang open source di Google Playstore, dan dapat dengan mudah digunakan oleh pengguna. Secara garis besar, tahap mendesain aplikasi ini dimulai dengan membuat use case diagram, kemudian membuat diagram kelas, diagram aktivitas, dan akhirnya pengembangan antarmuka pengguna yang diterapkan untuk Android. Hasil perancangan aplikasi bernama Ojan dari pengabdian berbasis riset ini berhasil diuji coba pada beberapa smartphone Android. Fasilitas yang dihasilkan oleh aplikasi ini antara lain customer bisa langsung memesan makanan, admin bisa mengetahui lokasi customer, customer bisa mengetahui menu apa saja yang terbaru di warung, jangkauan wilayah pemasaran yang lebih luas, dan driver mengetahui lokasi pesanan dan pesanan apa saja yang sudah dipesan oleh konsumen.
Penerapan Mesin Pengasapan Ikan untuk Nelayan Desa Langkak Kecamatan Kuala Pesisir Kabupaten Nagan Raya Muzakir, Muzakir; Fitriadi, Fitriadi; Pamungkas, Iing; Hadi, Khairul; Irawan, Heri Tri; Saputra, Arie; Hartati, Rita
Jurnal Pengabdian Masyarakat: Darma Bakti Teuku Umar Vol 2, No 1 (2020): Januari-Juni
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/baktiku.v2i1.2339

Abstract

Fish is one of the species that is in high demand by consumers, including in Aceh. Fish can be obtained by catching from abundant nature. Problems in processing fish catches in Aceh, especially Langkak Village, Kuala Pesisir District, Nagan Raya Regency is a conventional post-capture processing method, which is drying using the heat of sunlight. In this condition, fish drying has several disadvantages, which are related to dependence on sunlight heat, cleanliness, freshness of fish, and selling points. For this reason, there needs to be a way to implement simple technology that uses a fish fogging machine. The purpose of carrying out this community service program is to provide practical applications of the fish fogging technique by providing soft skills to members of the fishing group in the Village of Langkak Village, Kuala Pesisir District, Nagan Raya Regency. The results of community service activities have been going well, starting with socialization activities or theory to the practice or application of fish fogging. The achievement of community service activities is the transfer of knowledge about making fish fogging machines and the practice and application of fish fogging directly by the fishermen of Langkak Village. In addition, other results are a manual guide on fish fogging to get the optimal fish fogging results. This activity received a good response from the fishermen of Langkak Village who participated in the activity, because it was considered very useful and became a facility to empower fishermen and residents in general.