STUDI PARKIR PADA BADAN JALAN KANTOR WALI KOTA KENDARI (Studi Kasus: Jalan Abunawas) Edi Kusnadi; Muh. Thahir Azikin; Mappa Nashrun
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 5, No 1 (2020): MedKons
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (228.878 KB) | DOI: 10.33772/jmk.v5i1.24095

Abstract

Abstract The purpose of this study was to determine the parking characteristics of the parking at the study site including parking accumulation, parking volume, parking duration, parking turnover rate, and parking index and to determine the current parking space capacity whether it can still accommodate vehicles. The method used in this research is the method of direct observation and data collection in the field in the form of traffic volume and parking volume data as well as the. performance of road sections. These observations were made on Monday, Tuesday and Wednesday. Benefits of this study to determine the problem of the characteristics of vehicle parking at the Mayor's Office in Kendari. This approach is felt to be important for efforts to overcome the problem of vehicle parking and to know the vehicle parking capacity and further to provide parking space needs at the study location. The results of the analysis obtained parking characteristics for two-wheeled and four-wheeled vehicles have the highest parking volume of 75 vehicles and 50 vehicles, the duration of parking vehicles ranges from 1-2 to 2.5 hours for both, the highest accumulation of parking is 167 Vehicles / hour and 135 vehicles / hour , the average parking turnover rate is 90 cars / parking lots and 50 cars / parking lots and parking index is 146.11% and 109.33%. Judging from the characteristics of parking, so the current parking is not enough to accommodate the number of vehicles that park now.  Abstrak Tujuan dari penelitian ini adalah untuk Mengetahui karakteristik parkir kedaraan pada lokasi studi meliputi akumulasi parkir, volume parkir, durasi parkir, tingkat pergantian parkir, dan indeks parkir dan untuk mengetahui kapasitas ruang parkir pada saat ini apakah masih dapat menampung kendaraan.Metode yang digunakan dalam penelitian ini adalah metode pengamatan langsung dan pengambilan data di lapangan berupa data volume lalu lintas danvolume parkir serta kinerja ruas jalan. Pengamatan ini dilakukan pada hari senin, selasa dan rabu. Manfaat Penelitian ini untuk mengetahui masalah karakteristik parkir kendaraan di Kantor Walikota Kendari. Pendekatan ini dirasakan penting untuk usaha mengatasi masalah parkir kendaraan dan mengetahui kapasitas parkir kendaraan serta lebih lanjut untuk menyediakan kebutuhan ruang parkir di lokasi studi. Hasil analisis yang diperoleh karakteristik parkir untuk roda dua dan roda empat memiliki volume parkir tertinggi  berturut-turut sebesar 75 kendaraan dan 50 kendaraan, Durasi kendaraan parkir berkisar1-2,5 jam untuk keduanya, akumulasi parkir tertinggi sebesar 167 Kendaraan/jam dan135 kendaraan/jam, tingkat pergantian parkir rata-rata sebesar 90 mobil/petak parkir dan 50 mobil/ petak parkir serta indeks parkir sebesar 146.11%  dan 109.33%. Ditinjau dari karakteristik parkir, sehingga parkir eksisting  saat ini tidak cukup menampung jumlah kendaraan yang parkir sekarang. 
ANALISIS PARKIR KENDARAAN PADA AREA PARKIR RUMAH SAKIT ALIYAH 3 KOTA KENDARI (Studi kasus : Analisis Karakteristik Parkir Rumah Sakit Aliyah 3 Kota Kendari) Nino Wahyudin; La Welendo; Mappa Nashrun
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2020): MedKons
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (463.945 KB) | DOI: 10.33772/jmk.v5i2.24147

Abstract

Abstract Aliyah Hospital 3 one of the hospitals located in the city of Kendari, southeast Sulawesi is one of the health service centers for the people of kendari city and its surroundings. Hospital is a public service or activity center that is visited by many residents because they want to seek treatment and to know their health, resulting in a growing number of visitors affecting the amount of parking capacity in the parking area of the hospital aliyah 3 cities kendari, motorists and cars are increasing and the need for parking lots is increasing.Parking Space Needs (KRP) in the parking area of Aliyah Hospital Building 3 Kendari 42 m² for cars and 27,3 m² for motorcycles with the total area of parking needs is 69,3 m2.This survey will be recorded at 9 hours for 1 day survey, namely on the day of research At 07.00 – 16.00 Wita, the observation time interval is set 30 minutes and record the number of vehicles that have been parked before observation and the number of vehicles entering and exiting vehicles.  Abstrak Rumah Sakit Aliyah 3 salah satu rumah sakit yang terletak di Kota Kendari, Sulawesi tenggara merupakan salah satu pusat pelayanan kesehatan bagi masyarakat Kota Kendari dan sekitarnya. Rumah sakit adalah suatu pelayanan publik atau pusat kegiatan yang banyak di kunjungi oleh penduduk karena ingin berobat maupun untuk mengetahui kesehatannya, mengakibatkan jumlah pengunjung yang makin meningkat mempengaruhi jumlah kapasitas lahan parkir di area lahan parkir rumah sakit aliyah 3 Kota Kendari, pengendara bermotor dan mobil semakin bertambah dan kebutuhan akan lahan parkir pun semakin meningkat.Kebutuhan Ruang Parkir (KRP) di area parkir Gedung Rumah Sakit Aliyah 3 Kendari 42 m2 untuk mobil dan 27,3 m2 untuk motor dengan jumlah keseluruhan luas kebutuhan parkir adalah 69,3 m2.Ssurvey ini akan dilakukan pencatatan pada waktu 9 jam selama 1 hari survey, yaitu pada hari penelitian Pada Pukul 07.00 – 16.00 Wita, interval waktu pengamatan di tetapkan 30 menitan dan mencatat jumlah kendaraan yang sudah terparkir sebelum pengamatan dan jumlah kendaraan masuk dan kendaraan keluar. 
METODE PELAKSANAAN LAPIS PERMUKAAN AC – BC PADA PEKERJAAN JALAN WAWOTOBI – POHARA (Studi Kasus: Jalan Wawotobi – Pohara, Kab. Konawe – Sulawesi Tenggara) Jumardin Jumardin; Nasrul Nasrul; Mappa Nashrun
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 6, No 2 (2021)
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (923.482 KB) | DOI: 10.33772/jmk.v6i2.22476

Abstract

Pada ruas jalan Wawotobi - Pohara yang mengalami kerusakan dengan kondisi jalan lama dengan menggunakan perkerasan lentur yang kemudian diadakan proyek  peningkatan jalan oleh Dinas Pembangunan Umum Kota Kendari melalui penyedia jasa PT. PATRIOT JAYA PRATAMA. Seperti kita ketahui bersama bahwa untuk membangun suatu sarana transportasi memerlukan metode yang benar dan tepat, oleh karena itu diperlukan perencaan konstruksi jalan dan perancanaan pekerjaan jalan yang optimal dan memenuhi syarat teknis menurut  fungsi, volume maupun sifat lalu lintas sehingga pembangunan konstruksi tersebut dapat berguna maksimal bagi perkembangan daerah sekitarnya. Tujuan dari penelitian ini adalah untuk mengetehui pelaksanaan pekerjaan lapis permukaan AC- BC pada projek peningkatan jalan Wawotobi – Pohara serta mengefaluasi apakah metode pelaksanaan jalan pada projek peningkatan jalan Wawotobi – Pohara sudah sesuai dengan spesifikasi bina marga  2018. Berdasarkan hasil penelitian di lapangan  metode pelaksanaan lapis permukaan AC-BC pada pekerjaan jalan Wawotobi – Pohara, tidak memenuhi  standar Spesifikasi Bina Marga 2018 seperti proses pengangkutan yang tidak di tutupi terpal,  Menurut SNI penggunaan terpal pada pengangkutan material penting untuk menjaga temperatur suhu aspal yang ada dalam dump truck.
EFISIENSI BIAYA DAN WAKTU PELAKSANAAN PEKERJAAN LAPIS PERKERASAN AGREGAT KELAS B PADA RUAS JALAN SORUMBA KOTA KENDARI La Ode Haji; Mappa Nashrun; Umran Sarita; Sultan Machmud Hasan Masikki; Ainussalbi Al Ikhsan
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 5, No 1 (2020): MedKons
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (147.586 KB) | DOI: 10.33772/jmk.v5i1.24099

Abstract

Abstract In planning a project that is done with heavy equipment, one thing that is important is how to calculate the cost and time efficiency of the machine. The first step in calculating the cost and time of a machine is to carry out a theoretical calculation. Then with this final project to determine the cost efficiency and time of heavy equipment used during the Wua-Wua Area Road Improvement project process (DAK 2019) - Jalan Sorumba, Kendari City.The data in this study are secondary data obtained from the executing contractor which includes the budget plan for the implementation process of class B aggregate pavement work.The cost of implementing the rental of tools and materials from the calculation is Rp. 1.581.019.052,29, while the value of the contract fee is Rp. 1.597.496.916,63. The implementation time of class B aggregate pavement work (LPB) from the calculation, which takes 35 (thirty five) calendar days and is still in accordance with the estimated implementation of the work in the contract.  Abstrak Dalam merencanakan proyek yang dikerjakan dengan alat berat, satu hal yang penting adalah bagaimana menghitung efisiensi biaya dan waktu alat berat. Langkah pertama dalam menghitung biaya dan waktu alat berat adalah melakukan perhitungan secara teoritis. Kemudian dengan adanya tugas akhir ini untuk mengetahui efisiensi biaya dan waktu alat berat yang digunakan selama proses proyek Peningkatan Jalan Kawasan Wua-Wua (DAK 2019) – Jalan Sorumba, Kota Kendari.Data dalam penelitian ini adalah data sekunder yang diperoleh dari kontraktor pelaksana yang meliputi laporan rencana anggaran biaya proses pelaksanaan pekerjaan perkerasan pondasi agregat kelas B.Adapun biaya pelaksanaan sewa alat dan bahan dari perhitungan yakni sebesar Rp. 1.581.019.052,29, sedangkan nilai dari biaya kontrak yakni sebesar Rp. 1.597.496.916,63. Waktu pelaksanaan pekerjaan perkerasan agregat kelas B (LPB) dari perhitungan yakni membutuhkan waktu 35 (tiga puluh lima) hari kalender dan masih sesuai dengan estimasi pelaksanaan pekerjaan dalam kontrak. 
ANALISIS TINGKAT RESIKO KECELAKAAN KERJA PADA PEKERJAAN CABLE STAYED (Studi Kasus: Proyek Pembangunan Jembatan Teluk Kendari) Imam Mulyono; Fitriah Mas'ud; Mappa Nashrun; La Ode Muhamad Nurrakhmad Arsyad; Fathur Rahman Rustan
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 5, No 1 (2020): MedKons
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (126.93 KB) | DOI: 10.33772/jmk.v5i1.24094

Abstract

Abstract Analysis of the Risk Level of Work Accidents at Cable Stayed Work (Kendari Bay Bridge Construction Project)" Supervised by Mts. Fitriah Mas’ud as supervisor I and Mr. Mappa Nasrun as mentor II. Occupational Health and Safety (K3) problems in general are still neglected in Indonesia, this is shown by the high accident rate and the low level of concern from the business world towards work safety. This general problem regarding K3 also occurs in the implementation of construction projects.This study discusses and identifies the risks of work accidents and controls the risk of work accidents in every implementation of Cable Stayed work at the Kendari Bay Bridge Construction Project, knowing about the application of SMK3 and K3 to Cable Stayed Work at the Kendari Bay Bridge Construction Project. Identification of the level of risk for work accidents is taken from the results of observations and interviews with respondents, and data processing is done manually with the formula Risk value = probable weight x weight severity. (Puspitasari, 2010).The research results show that the possibility and risk level of work accidents with the highest risk level is the prestressed wire installation work with the results of high risk / risk value × 100% = 12 ÷ 16 × 100 = 75% (high category) As for overcoming this risk the project party holds daily meetings, to urge workers to wear K3 equipment when doing work.  Abstrak Analisis Tingkat Resiko Kecelakaan Kerja Pada Pekerjaan Cable Stayed (Proyek Pembangunan Jembatan Teluk Kendari)” Dibimbing oleh Ibu Fitriah Mas’ud selaku pembimbing I dan Bapak Mappa Nashrun selaku pembimbing II. Permasalahan Keselamatan dan Kesehatan Kerja (K3) secara umum di indonesia  masih terabaikan, hal ini ditunjukkan dengan  angka  kecelakaan yang masih tinggi  dan tingkat kepedulian dunia usaha terhadap keselamatan kerja yang masih rendah. Masalah umum mengenai K3 ini juga terjadi pada penyelenggaraan proyek - proyek konstruksi.Pada penelitian ini membahas serta mengidentifikasi resiko - resiko kecelakaan kerja dan pengendalian resiko kecelakaan kerja disetiap  pelaksanaan  pekerjaan Cable Stayed di Proyek Pembangunan Jembatan Teluk Kendari, mengetahui tentang penerapan SMK3 dan K3 terhadap Pekerjaan Cable Stayed  di Proyek Pembangunan Jembatan Teluk Kendari. Identifikasi tingkat nilai resiko kecelakaan kerja diambil dari hasil observasi dan wawancara kepada responden, dan pengolahan data dilakukan secara manual dengan rumus Nilai resiko = Bobot kemungkinan x Bobot keparahan. (Puspitasari, 2010). Pada hasil penelitian diperoleh kemungkinan dan tingkat resiko kecelakaan kerja yang paling tinggi tingkat resikonya yaitu pada  pekerjaan pemasangan kawat prategang dengan hasil nilai resiko / nilai resiko tinggi × 100% = 12 ÷ 16 × 100 = 75% (kategori tinggi). Adapun untuk menanggulangi resiko tersebut pihak proyek melakukan meeting harian, untuk menghimbau para pekerja mamakai  perlengkapan K3 pada saat melakukan pekerjaan. 
Analisis Tingkat Kerusakan Jalan dengan Metode PCI pada Ruas Jalan Tondasi-Wamengkoli (Desa Lakanaha, Kecamatan Wadaga, Kabupaten Muna Barat) Wa Ode Oga; Siti Nurjanah Ahmad; Mappa Nashrun; Try Sugiyarto Soeparyanto; Sulha Sulha; Anafi Minmahddun
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 7, No 4 (2022)
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jmk.v7i4.28216

Abstract

Kerusakan jalan yang terjadi di berbagai daerah merupakan permasalahan yang sangat kompleks. Kerusakan tersebut mengakibatkan kerugian, seperti waktu tempuh semakin lama, kemacetan, kecelakaan lalu-lintas dan lain-lain. Nilai kondisi jalan ini nantinya dijadikan acuan untuk menentukan jenis program evaluasi yang harus dilakukan, apakah itu program peningkatan pemeliharaan berkala atau pemeliharaan rutin.  Tujuan dilakukannya penelitian ini adalah Untuk mengetahui kondisi dan jenis-jenis kerusakan apa saja yang terjadi pada ruas jalan Tondasi-Wamengkoli (Desa Lakanaha, Kecamatan Wadaga, Kabupaten Muna Barat),Untuk mengetahui faktor-faktor penyebab terjadinya kerusakan permukaan jalan pada ruas jalan Tondasi-Wamengkoli khususnya di desa Lakanaha Kecamatan Wadaga Kabupaten Muna Barat, Untuk mengetahui cara menanggulangi kerusakan permukaan jalan yang terjadi.  Dari data yang diperoleh melalui penelitan dilapangan dan dianalisa menggunakan metode PCI (Pavement Condition Index) sehingga diperoleh kondisi kerusakan jalan dalam kondisi baik (good) dengan nilai PCI adalah 63,6. Jenis-jenis kerusakan yang terjadi pada ruas jalan Tondasi-Wamemgkoli (Desa Lakanaha, Kecamatan Wadaga, Kabupaten Muna Barat) yaitu lubang, tambalan, retak pinggir, retak kulit buaya, pelepasan butir, benjol dan bahu turun. Pada ruas jalan Tondasi-Wamengkoli yang mendominasi jenis kerusakan terbanyak adalah jenis kerusakan lubang, dimana dari hasil penelitian terdapat sebanyak 39 kerusakan lubang.Faktor penyebab utama kerusakan jalan adalah tidak berfungsi atau tidak adanya drainase.Untuk menanggulangi kerusakan jalan dapat di lakukan dengan cara penambalan lubang (patch), melapis retakan (crack sealing), penutupan permukaan, lapisan tambahan, recycle, dan rekostruksi. Karena penyebab utama kerusakan adalah tidak adanya drainase maka perlu adanya pembangunan drainase agar mengurangi adanya kerusakan jalan.
Metode Pelaksanaan Lapis Pondasi Atas (Lpa) Pada Pekerjaan Jalan Dan Jembatan Sungai Wanggu Boulevard (Studi Kasus : Proyek Pekerjaan Jalan Dan Jembatan Sungai Wanggu Boulevard, Kota Kendari) Muh. Gammar Teja Kusuma; Nasrul Nasrul; Mappa Nashrun; Fitriah Fitriah
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 6, No 4 (2021)
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jmk.v6i4.28754

Abstract

Pembangunan infrastuktur di Kota Kendari Provinsi Sulawesi Tenggara semakin berkembang seiring dengan bertambahnya populasi manusia dan kemajuan teknologi. Untuk mendukungpercepatan perkembangan tersebut maka diperlukan peningkatan pada sektor jalan. Adapun tujuan dari penelitian ini adalah untuk mengetahui metode pelaksanaan Lapis Pondasi Atas (LPA) pada proyek pekerjaan jalan dan jembatan sungai Wanggu Boulevard, dimana pekerjaan jalan ini bertujuan sebagai salah satu upaya untuk mengatasi permasalahan lalu lintas di Kota Kendari sehingga diperlukan penambahan kapasitas jalan. Dari hasil analisa yang telah dilakukan, maka peneliti dapat mengambil kesimpulan bahwa metode pelaksanaan yang dilakukan dilapangan telah sesuai dengan spesifikasi Bina Marga 2018 Divisi 5 Perkerasan Berbutir dan Perkerasan Beton Semen.